Automatic notation of the physical structure of a flexible manufacturing system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- J. A. Buzacott & David D. Yao, 1986. "Flexible Manufacturing Systems: A Review of Analytical Models," Management Science, INFORMS, vol. 32(7), pages 890-905, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Paulli, Jan, 1995. "A hierarchical approach for the FMS scheduling problem," European Journal of Operational Research, Elsevier, vol. 86(1), pages 32-42, October.
- Taekwon Kim & Lars‐Hendrik Röller & Mihkel M. Tombak, 1994. "On the timing of adoption of multiproduct technologies," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 377-394, April.
- Daniel Freund & S'ebastien Martin & Jiayu Kamessi Zhao, 2024. "Two-Sided Flexibility in Platforms," Papers 2404.04709, arXiv.org, revised Nov 2024.
- Louis Amato & Christie Amato, 2000. "The Impact of High Tech Production Techniques on Productivity and Profitability in Selected U.S. Manufacturing Industries," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 16(4), pages 327-342, June.
- Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
- Harry R. Clarke, 1988. "Product Rotations and the Economics of an Adaption-Flexible Manufacturing System," Australian Journal of Management, Australian School of Business, vol. 13(2), pages 319-331, December.
- Liling Ge & Yingjie Zhang, 2019. "Improving operational reliability of manufacturing systems by process optimization via survival signatures," Journal of Risk and Reliability, , vol. 233(3), pages 444-454, June.
- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
- Karsak, E. Ertugrul & Kuzgunkaya, Onur, 2002. "A fuzzy multiple objective programming approach for the selection of a flexible manufacturing system," International Journal of Production Economics, Elsevier, vol. 79(2), pages 101-111, September.
- Tang, Christopher S., 2010. "A review of marketing-operations interface models: From co-existence to coordination and collaboration," International Journal of Production Economics, Elsevier, vol. 125(1), pages 22-40, May.
- Fine, Charles H., 1989. "Developments in manufacturing technology and economic evaluation models," Working papers 3012-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Ilias Vlachos & Rodrigo Martinez Pascazzi & Miltiadis Ntotis & Konstantina Spanaki & Stella Despoudi & Panagiotis Repoussis, 2022. "Smart and flexible manufacturing systems using Autonomous Guided Vehicles (AGVs) and the Internet of Things (IoT)," Post-Print hal-03825237, HAL.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Shang, Jen & Sueyoshi, Toshiyuki, 1995. "A unified framework for the selection of a Flexible Manufacturing System," European Journal of Operational Research, Elsevier, vol. 85(2), pages 297-315, September.
- Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
- Schwerdfeger, Stefan & Boysen, Nils, 2017. "Order picking along a crane-supplied pick face: The SKU switching problem," European Journal of Operational Research, Elsevier, vol. 260(2), pages 534-545.
- Zavanella, Lucio, 1996. "Guidelines for tool store dimensioning in flexible manufacturing using an analytical technique," International Journal of Production Economics, Elsevier, vol. 46(1), pages 563-573, December.
- Perrone, Giovanni & La Diega, Sergio Noto, 1996. "Strategic FMS design under uncertainty: A fuzzy set theory based model," International Journal of Production Economics, Elsevier, vol. 46(1), pages 549-561, December.
- Bitran, Gabriel R. & Morabito, Reinaldo., 1994. "Open queueing networks : optimization and performance evaluation models for discrete manufacturing systems," Working papers 3743-94., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Kumar, Ashok & Jacobson, Sheldon H. & Sewell, Edward C., 2000. "Computational analysis of a flexible assembly system design problem," European Journal of Operational Research, Elsevier, vol. 123(3), pages 453-472, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:74:y:2001:i:1-3:p:279-292. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.