A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tamura, Takayoshi & Long, Hong & Ohno, Katsuhisa, 1999. "A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline," International Journal of Production Economics, Elsevier, vol. 60(1), pages 557-564, April.
- John Miltenburg, 1989. "Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems," Management Science, INFORMS, vol. 35(2), pages 192-207, February.
- Kate A. Smith, 1999. "Neural Networks for Combinatorial Optimization: A Review of More Than a Decade of Research," INFORMS Journal on Computing, INFORMS, vol. 11(1), pages 15-34, February.
- רבקה פריאור, 1990. "מקבלי דמי פגיעה, 1988," Working Papers 553, National Insurance Institute of Israel.
- אסתר טולידנו, 1990. "מקבלי דמי אבטלה בשנת 1989," Working Papers 452, National Insurance Institute of Israel.
- מחקר - ביטוח לאומי, 1990. "גיליון 35 - תש"נ, יוני 1990," Working Papers 1126, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hsu, Chih-Ming, 2004. "An integrated approach to enhance the optical performance of couplers based on neural networks, desirability functions and tabu search," International Journal of Production Economics, Elsevier, vol. 92(3), pages 241-254, December.
- Boysen, Nils & Scholl, Armin & Wopperer, Nico, 2012.
"Resequencing of mixed-model assembly lines: Survey and research agenda,"
European Journal of Operational Research, Elsevier, vol. 216(3), pages 594-604.
- Nils Boysen & Armin Scholl & Nico Wopperer, 2011. "Resequencing of mixed-model assembly lines: Survey and research agenda," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 03/2011, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009.
"Sequencing mixed-model assembly lines: Survey, classification and model critique,"
European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2007. "Sequencing mixed-model assembly lines: Survey, classification and model critique," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 02/2007, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
- Mansouri, S. Afshin, 2005. "A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines," European Journal of Operational Research, Elsevier, vol. 167(3), pages 696-716, December.
- Doumpos, Michael & Zopounidis, Constantin, 2011. "Preference disaggregation and statistical learning for multicriteria decision support: A review," European Journal of Operational Research, Elsevier, vol. 209(3), pages 203-214, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Klein, M., 1995. "Integrated coordination in cooperative design," International Journal of Production Economics, Elsevier, vol. 38(1), pages 85-102, March.
- Olorunniwo, Festus & Udo, Godwin, 2002. "The impact of management and employees on cellular manufacturing implementation," International Journal of Production Economics, Elsevier, vol. 76(1), pages 27-38, March.
- Bal, F. & Button, K. J. & Nijkamp, P., 2002. "Ceteris paribus, meta-analysis and value transfer," Socio-Economic Planning Sciences, Elsevier, vol. 36(2), pages 127-138, June.
- Cote, Murray J., 1999. "Patient flow and resource utilization in an outpatient clinic," Socio-Economic Planning Sciences, Elsevier, vol. 33(3), pages 231-245, September.
- Saydam, Cem & Aytug, Haldun, 2003. "Accurate estimation of expected coverage: revisited," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 69-80, March.
- Nyerges, Richard T., 1996. "The new management paradigm: An extension through the IFAM perspective," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 203-214, August.
- Pollatschek, M. A., 1997. "Design of a simulation library for CIM," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 99-107, August.
- Kavusturucu, Ayse & Gupta, Surendra M., 1999. "Manufacturing systems with machine vacations, arbitrary topology and finite buffers," International Journal of Production Economics, Elsevier, vol. 58(1), pages 1-15, January.
- Hempel, Paul S., 1996. "Human-resource-based models of production systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 239-249, June.
- Nilsson, Carl-Henric, 1997. "Strategic alliances, trick or treat? the case of Scania," International Journal of Production Economics, Elsevier, vol. 52(1-2), pages 147-160, October.
- Luciano, Elisa & Peccati, Lorenzo, 2001. "Cycles optimization: The equivalent annuity and the NPV approaches," International Journal of Production Economics, Elsevier, vol. 69(1), pages 65-83, January.
- Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1998. "High performance heuristic algorithm for controlling stochastic network projects," International Journal of Production Economics, Elsevier, vol. 54(3), pages 235-245, May.
- Favaretto, Daniela & Pesenti, Raffaele & Ukovich, Walter, 2001. "Discrete frequency models for inventory management - an introduction," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 331-342, May.
- Kengpol, Athakorn & O'Brien, Christopher, 2001. "The development of a decision support tool for the selection of advanced technology to achieve rapid product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 177-191, January.
- Stenger, Alan J., 1996. "Reducing inventories in a multi-echelon manufacturing firm A case study," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 239-249, August.
- De Toni, Alberto & Nassimbeni, Guido, 2001. "A method for the evaluation of suppliers co-design effort," International Journal of Production Economics, Elsevier, vol. 72(2), pages 169-180, July.
- Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
- Hadjinicola, George C. & Kumar, K. Ravi, 2002. "Modeling manufacturing and marketing options in international operations," International Journal of Production Economics, Elsevier, vol. 75(3), pages 287-304, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:72:y:2001:i:1:p:59-71. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.