An optimal mixed policy of inspection and burn-in and the optimal production quantity
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kwei Tang & Helmut Schneider, 1990. "Cost effectiveness of using a correlated variable in a complete inspection plan when inspection error is present," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(6), pages 893-904, December.
- June S. Park & Michael H. Peters & Kwei Tang, 1991. "Note---Optimal Inspection Policy in Sequential Screening," Management Science, INFORMS, vol. 37(8), pages 1058-1061, August.
- Liou, Ming-Jong & Tseng, Sheng-Tsaing & Lin, Tsong-Ming, 1994. "Optimal sequence of partial inspections subject to errors," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 109-119, January.
- Kwei Tang & Jen Tang, 1989. "Design of Product Specifications for Multi-Characteristic Inspection," Management Science, INFORMS, vol. 35(6), pages 743-756, June.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Gary D. Eppen & E. Gerald Hurst, Jr., 1974. "Optimal Location of Inspection Stations in a Multistage Production Process," Management Science, INFORMS, vol. 20(8), pages 1194-1200, April.
- Robert R. Britney, 1972. "Optimal Screening Plans for Nonserial Production Systems," Management Science, INFORMS, vol. 18(9), pages 550-559, May.
- Leon S. White, 1966. "The Analysis of a Simple Class of Multistage Inspection Plans," Management Science, INFORMS, vol. 12(9), pages 685-693, May.
- Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jin, Tongdan & Janamanchi, Balaji & Feng, Qianmei, 2011. "Reliability deployment in distributed manufacturing chains via closed-loop Six Sigma methodology," International Journal of Production Economics, Elsevier, vol. 130(1), pages 96-103, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
- Cheong Ng, Wing & Van Hui, Yer, 1997. "Economic design of a complete inspection plan with interactive quality improvement," European Journal of Operational Research, Elsevier, vol. 96(1), pages 122-129, January.
- Jewkes, Elizabeth M., 1995. "Optimal inspection effort and scheduling for a manufacturing process with repair," European Journal of Operational Research, Elsevier, vol. 85(2), pages 340-351, September.
- Gurnani, Haresh & Drezner, Zvi & Akella, Ram, 1996. "Capacity planning under different inspection strategies," European Journal of Operational Research, Elsevier, vol. 89(2), pages 302-312, March.
- Van Volsem, Sofie & Dullaert, Wout & Van Landeghem, Hendrik, 2007. "An Evolutionary Algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes," European Journal of Operational Research, Elsevier, vol. 179(3), pages 621-633, June.
- Bendavid, Illana & Herer, Yale T., 2009. "Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control," European Journal of Operational Research, Elsevier, vol. 195(1), pages 139-155, May.
- Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
- Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
- Zhou, Jing & Liu, Yu & Liang, Decui & Tang, Maochun, 2023. "A new risk analysis approach to seek best production action during new product introduction," International Journal of Production Economics, Elsevier, vol. 262(C).
- Maria R. Ibanez & Michael W. Toffel, 2020. "How Scheduling Can Bias Quality Assessment: Evidence from Food-Safety Inspections," Management Science, INFORMS, vol. 66(6), pages 2396-2416, June.
- B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
- Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
- Abu Hashan Md Mashud & Hui-Ming Wee & Chiao-Ven Huang & Jei-Zheng Wu, 2020. "Optimal Replenishment Policy for Deteriorating Products in a Newsboy Problem with Multiple Just-in-Time Deliveries," Mathematics, MDPI, vol. 8(11), pages 1-18, November.
- Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- Hong, Sung Hoon & Kim, Sang Boo & Kwon, Hyuck Moo & Lee, Min Koo, 1998. "Economic design of screening procedures when the rejected items are reprocessed," European Journal of Operational Research, Elsevier, vol. 108(1), pages 65-73, July.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:105:y:2007:i:2:p:483-491. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.