IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v162y2015icp134-142.html
   My bibliography  Save this article

Coordination contracts for outsourcing supply chain with financial constraint

Author

Listed:
  • Xu, Xiaoyan
  • Cheng, Xiaoying
  • Sun, Yanhong

Abstract

Financial constraint is a great challenge for many firms (especially start-up, small- and medium-sized ones) in reality. This paper investigates the methods for coordinating the call center outsourcing supply chain with financial constraint. Based on an outsourcing supply chain that is composed of a user company and a financially constrained call center, the effectiveness of three contracts (revenue sharing contract, output penalty contract and cost sharing contract) in coordinating the outsourcing supply chain is examined. Theoretical results show that the cost sharing contract can achieve channel coordination as well as improving the profit of each member firm; however, the revenue sharing contract and the output penalty contract achieve channel coordination by sacrificing the profit of the user company. Moreover, financial risk makes the output penalty contract less profitable than the other two contracts under some conditions. Numerical results are further presented to reveal the managerial insights.

Suggested Citation

  • Xu, Xiaoyan & Cheng, Xiaoying & Sun, Yanhong, 2015. "Coordination contracts for outsourcing supply chain with financial constraint," International Journal of Production Economics, Elsevier, vol. 162(C), pages 134-142.
  • Handle: RePEc:eee:proeco:v:162:y:2015:i:c:p:134-142
    DOI: 10.1016/j.ijpe.2015.01.016
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527315000286
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.01.016?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Volodymyr Babich & Matthew J. Sobel, 2004. "Pre-IPO Operational and Financial Decisions," Management Science, INFORMS, vol. 50(7), pages 935-948, July.
    2. Noah Gans & Yong-Pin Zhou, 2007. "Call-Routing Schemes for Call-Center Outsourcing," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 33-50, May.
    3. Z. Justin Ren & Yong-Pin Zhou, 2008. "Call Center Outsourcing: Coordinating Staffing Level and Service Quality," Management Science, INFORMS, vol. 54(2), pages 369-383, February.
    4. Bruce C. Greenwald & Joseph E. Stiglitz, 1993. "Financial Market Imperfections and Business Cycles," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 108(1), pages 77-114.
    5. Feng, Xuehao & Moon, Ilkyeong & Ryu, Kwangyeol, 2014. "Revenue-sharing contracts in an N-stage supply chain with reliability considerations," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 20-29.
    6. Bai, Yan & Zhang, Jing, 2012. "Financial integration and international risk sharing," Journal of International Economics, Elsevier, vol. 86(1), pages 17-32.
    7. Frascatore, Mark R. & Mahmoodi, Farzad, 2008. "Long-term and penalty contracts in a two-stage supply chain with stochastic demand," European Journal of Operational Research, Elsevier, vol. 184(1), pages 147-156, January.
    8. Gurnani, Haresh & Gerchak, Yigal, 2007. "Coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1559-1576, February.
    9. ., 2012. "Global imbalances and the dollar standard," Chapters, in: The New Global Political Economy, chapter 2, pages 47-78, Edward Elgar Publishing.
    10. ., 2012. "Globalization and regionalization of East Asian economies," Chapters, in: Asian Monetary Integration, chapter 4, pages iii-iii, Edward Elgar Publishing.
    11. Feng, Yi & Mu, Yinping & Hu, Benyong & Kumar, Arun, 2014. "Commodity options purchasing and credit financing under capital constraint," International Journal of Production Economics, Elsevier, vol. 153(C), pages 230-237.
    12. Purnanandam, Amiyatosh, 2008. "Financial distress and corporate risk management: Theory and evidence," Journal of Financial Economics, Elsevier, vol. 87(3), pages 706-739, March.
    13. Gary H. Chao & Seyed M. R. Iravani & R. Canan Savaskan, 2009. "Quality Improvement Incentives and Product Recall Cost Sharing Contracts," Management Science, INFORMS, vol. 55(7), pages 1122-1138, July.
    14. Sameer Hasija & Edieal J. Pinker & Robert A. Shumsky, 2008. "Call Center Outsourcing Contracts Under Information Asymmetry," Management Science, INFORMS, vol. 54(4), pages 793-807, April.
    15. Lai, Guoming & Debo, Laurens G. & Sycara, Katia, 2009. "Sharing inventory risk in supply chain: The implication of financial constraint," Omega, Elsevier, vol. 37(4), pages 811-825, August.
    16. Oecd, 2012. "How Is the Global Talent Pool Changing?," Education Indicators in Focus 5, OECD Publishing.
    17. Mustafa Akan & Bar{i}c{s} Ata & Martin A. Lariviere, 2011. "Asymmetric Information and Economies of Scale in Service Contracting," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 58-72, September.
    18. Agliari, Anna & Gatti, Domenico Delli & Gallegati, Mauro & Lenci, Stefano, 2006. "The complex dynamics of financially constrained heterogeneous firms," Journal of Economic Behavior & Organization, Elsevier, vol. 61(4), pages 784-803, December.
    19. O. Zeynep Akc{s}in & Francis de Véricourt & Fikri Karaesmen, 2008. "Call Center Outsourcing Contract Analysis and Choice," Management Science, INFORMS, vol. 54(2), pages 354-368, February.
    20. ., 2012. "Globalization and income inequalities," Chapters, in: The New Global Political Economy, chapter 3, pages 79-105, Edward Elgar Publishing.
    21. Gérard P. Cachon & Martin A. Lariviere, 2005. "Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations," Management Science, INFORMS, vol. 51(1), pages 30-44, January.
    22. Hwan Lee, Chang & Rhee, Byong-Duk, 2010. "Coordination contracts in the presence of positive inventory financing costs," International Journal of Production Economics, Elsevier, vol. 124(2), pages 331-339, April.
    23. John A. Buzacott & Rachel Q. Zhang, 2004. "Inventory Management with Asset-Based Financing," Management Science, INFORMS, vol. 50(9), pages 1274-1292, September.
    24. Gérard P. Cachon & Fuqiang Zhang, 2006. "Procuring Fast Delivery: Sole Sourcing with Information Asymmetry," Management Science, INFORMS, vol. 52(6), pages 881-896, June.
    25. Iea, 2012. "The Global Value of Coal," IEA Energy Papers 2012/3, OECD Publishing.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, Bo & An, Si-min & Song, Dong-ping, 2018. "Selection of financing strategies with a risk-averse supplier in a capital-constrained supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 163-183.
    2. Wang, Xihui & Li, Feng & Liang, Liang & Huang, Zhimin & Ashley, Allan, 2015. "Pre-purchasing with option contract and coordination in a relief supply chain," International Journal of Production Economics, Elsevier, vol. 167(C), pages 170-176.
    3. Yang, Honglin & Zhuo, Wenyan & Shao, Lusheng, 2017. "Equilibrium evolution in a two-echelon supply chain with financially constrained retailers: The impact of equity financing," International Journal of Production Economics, Elsevier, vol. 185(C), pages 139-149.
    4. Bo Yan & Kun Luo & Li‐Feng Liu & Yan‐Ru Chen & Yi‐Fan Yang, 2020. "Supply chain finance: A three‐party decision model with suppliers' guarantees for retailers," Managerial and Decision Economics, John Wiley & Sons, Ltd., vol. 41(7), pages 1174-1194, October.
    5. H. Neil Geismar & Yiwei Huang & Suresh D. Pillai & Chelliah Sriskandarajah & Seokjun Youn, 2020. "Location‐Routing with Conflicting Objectives: Coordinating eBeam Phytosanitary Treatment and Distribution of Mexican Import Commodities," Production and Operations Management, Production and Operations Management Society, vol. 29(6), pages 1506-1531, June.
    6. Debabrata Das & Sameer Kumar & Nirmal Baran Hui & Vipul Jain & Charu Chandra, 2023. "Pricing and revenue-based outsourcing strategies in a multi-echelon lot-sizing model under insufficient production capacity," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 22(6), pages 514-530, December.
    7. Lei Yang & Jingna Ji & Chenshi Zheng, 2016. "Impact of Asymmetric Carbon Information on Supply Chain Decisions under Low-Carbon Policies," Discrete Dynamics in Nature and Society, Hindawi, vol. 2016, pages 1-16, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huang, Jing & Yang, Wensheng & Tu, Yiliu, 2020. "Financing mode decision in a supply chain with financial constraint," International Journal of Production Economics, Elsevier, vol. 220(C).
    2. Xiaoyan Xu & Yanan Ji & Yiwen Bian & Yanhong Sun, 2017. "Service outsourcing under co-opetition and information asymmetry," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 666-677, June.
    3. Dong Li & Nishant Mishra & Serguei Netessine, 2023. "Contracting for Product Support Under Information Asymmetry," Management Science, INFORMS, vol. 69(8), pages 4627-4645, August.
    4. Ji, Xiang & Sun, Jiasen & Wang, Zebin, 2017. "Turn bad into good: Using transshipment-before-buyback for disruptions of stochastic demand," International Journal of Production Economics, Elsevier, vol. 185(C), pages 150-161.
    5. Jain, Tarun & Hazra, Jishnu & Cheng, T.C.E., 2018. "Sourcing under overconfident buyer and suppliers," International Journal of Production Economics, Elsevier, vol. 206(C), pages 93-109.
    6. Ruhang, Xu, 2016. "Characteristics and prospective of China׳s PV development route: Based on data of world PV industry 2000–2010," Renewable and Sustainable Energy Reviews, Elsevier, vol. 56(C), pages 1032-1043.
    7. Thakur, Jagruti & Chakraborty, Basab, 2015. "Intelli-grid: Moving towards automation of electric grid in India," Renewable and Sustainable Energy Reviews, Elsevier, vol. 42(C), pages 16-25.
    8. Qi Feng & Lauren Xiaoyuan Lu, 2012. "The Strategic Perils of Low Cost Outsourcing," Management Science, INFORMS, vol. 58(6), pages 1196-1210, June.
    9. Zhang, Sufang & He, Yongxiu, 2013. "Analysis on the development and policy of solar PV power in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 21(C), pages 393-401.
    10. Panos Kouvelis & Wenhui Zhao, 2016. "Supply Chain Contract Design Under Financial Constraints and Bankruptcy Costs," Management Science, INFORMS, vol. 62(8), pages 2341-2357, August.
    11. Andrea Marescotti & Alessandro Brazzini, 2014. "L?utilizzo degli standard privati di qualit? nella gdo italiana. Il caso dello standard GlobalG.A.P," Economia agro-alimentare, FrancoAngeli Editore, vol. 16(1), pages 63-83.
    12. Rostami, Raheleh & Khoshnava, Seyed Meysam & Lamit, Hasanuddin & Streimikiene, Dalia & Mardani, Abbas, 2017. "An overview of Afghanistan's trends toward renewable and sustainable energies," Renewable and Sustainable Energy Reviews, Elsevier, vol. 76(C), pages 1440-1464.
    13. Benaroch, Michel & Webster, Scott & Kazaz, Burak, 2012. "Impact of sourcing flexibility on the outsourcing of services under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 219(2), pages 272-283.
    14. Nicos Savva & Tolga Tezcan & Özlem Yıldız, 2019. "Can Yardstick Competition Reduce Waiting Times?," Management Science, INFORMS, vol. 65(7), pages 3196-3215, July.
    15. Yanwei Chen & Xiaojun Liu & Kaiqing Huang & Huajun Tang, 2022. "Pricing and Service Effort Decisions of Book Dual-Channel Supply Chains with Showrooming Effect Based on Cost-Sharing Contracts," Sustainability, MDPI, vol. 14(18), pages 1-23, September.
    16. Boon, L.N. & Brière, M. & Rigot, S., 2018. "Regulation and pension fund risk-taking," Journal of International Money and Finance, Elsevier, vol. 84(C), pages 23-41.
    17. Panos Kouvelis & Wenhui Zhao, 2012. "Financing the Newsvendor: Supplier vs. Bank, and the Structure of Optimal Trade Credit Contracts," Operations Research, INFORMS, vol. 60(3), pages 566-580, June.
    18. Xiaoli Zhang & Guoyi Xiu & Fakhar Shahzad & Yupeng Duan, 2021. "Optimal Financing Strategy in a Capital-Constrained Supply Chain with Retailer Green Marketing Efforts," Sustainability, MDPI, vol. 13(3), pages 1-19, January.
    19. Mustafa Akan & Bar{i}c{s} Ata & Martin A. Lariviere, 2011. "Asymmetric Information and Economies of Scale in Service Contracting," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 58-72, September.
    20. Hsiao-Hui Lee & Edieal J. Pinker & Robert A. Shumsky, 2012. "Outsourcing a Two-Level Service Process," Management Science, INFORMS, vol. 58(8), pages 1569-1584, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:162:y:2015:i:c:p:134-142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.