IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v161y2015icp105-115.html
   My bibliography  Save this article

Optimizing ERP readiness improvements under budgetary constraints

Author

Listed:
  • Ahmadi, Sadra
  • Yeh, Chung-Hsing
  • Martin, Rodney
  • Papageorgiou, Elpiniki

Abstract

An organization needs to be ready before implementing a complex enterprise resource planning (ERP) system. To achieve this aim, organization has to address two questions: (1) “is the organization sufficiently ready to accept an ERP system” and (2) “what is the most cost effective plan for improving the readiness, if the organization is not sufficiently ready?”. To estimate the current readiness an organization must consider the interrelationships between influential readiness factors and find the best improvement plan as a multi-objective trade-off between the two objectives of maximum readiness and lowest cost. In this paper we demonstrate how to calculate the readiness, and then solve the multi-objective optimization problem. We estimate readiness by using fuzzy cognitive maps to include all the complex causal relationships between factors. We solve the multi-objective optimization problem by using the NSGA-II evolutionary algorithm. The final result is a set of optimal improvement plans where an organization can choose which plan suits it the best.

Suggested Citation

  • Ahmadi, Sadra & Yeh, Chung-Hsing & Martin, Rodney & Papageorgiou, Elpiniki, 2015. "Optimizing ERP readiness improvements under budgetary constraints," International Journal of Production Economics, Elsevier, vol. 161(C), pages 105-115.
  • Handle: RePEc:eee:proeco:v:161:y:2015:i:c:p:105-115
    DOI: 10.1016/j.ijpe.2014.11.020
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731400382X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.11.020?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Cavalieri, Sergio & Maccarrone, Paolo & Pinto, Roberto, 2004. "Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry," International Journal of Production Economics, Elsevier, vol. 91(2), pages 165-177, September.
    2. Sun, Albert Y.T. & Yazdani, Abe & Overend, John D., 2005. "Achievement assessment for enterprise resource planning (ERP) system implementations based on critical success factors (CSFs)," International Journal of Production Economics, Elsevier, vol. 98(2), pages 189-203, November.
    3. Christian Kronborg Andersen & Kjeld Andersen & Per Kragh‐Sørensen, 2000. "Cost function estimation: the choice of a model to apply to dementia," Health Economics, John Wiley & Sons, Ltd., vol. 9(5), pages 397-409, July.
    4. Abdinnour-Helm, Sue & Lengnick-Hall, Mark L. & Lengnick-Hall, Cynthia A., 2003. "Pre-implementation attitudes and organizational readiness for implementing an Enterprise Resource Planning system," European Journal of Operational Research, Elsevier, vol. 146(2), pages 258-273, April.
    5. Belfares, Lamia & Klibi, Walid & Lo, Nassirou & Guitouni, Adel, 2007. "Multi-objectives Tabu Search based algorithm for progressive resource allocation," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1779-1799, March.
    6. Ben-Arieh, David & Qian, Li, 2003. "Activity-based cost management for design and development stage," International Journal of Production Economics, Elsevier, vol. 83(2), pages 169-183, February.
    7. Doerner, K.F. & Gutjahr, W.J. & Hartl, R.F. & Strauss, C. & Stummer, C., 2006. "Pareto ant colony optimization with ILP preprocessing in multiobjective project portfolio selection," European Journal of Operational Research, Elsevier, vol. 171(3), pages 830-841, June.
    8. Irani, Zahir & Sharif, Amir & Love, Peter E. D. & Kahraman, Cengiz, 2002. "Applying concepts of fuzzy cognitive mapping to model: The IT/IS investment evaluation process," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 199-211, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Monshizadeh, Fatemeh & Sadeghi Moghadam, Mohammad Reza & Mansouri, Taha & Kumar, Maneesh, 2023. "Developing an industry 4.0 readiness model using fuzzy cognitive maps approach," International Journal of Production Economics, Elsevier, vol. 255(C).
    2. Darie Casiana Maria, 2023. "The Link between Business Benefits and ERP Systems: A Bibliometric Analysis," Proceedings of the International Conference on Business Excellence, Sciendo, vol. 17(1), pages 1957-1966, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qian, Li & Ben-Arieh, David, 2008. "Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts," International Journal of Production Economics, Elsevier, vol. 113(2), pages 805-818, June.
    2. Duffner, Fabian & Mauler, Lukas & Wentker, Marc & Leker, Jens & Winter, Martin, 2021. "Large-scale automotive battery cell manufacturing: Analyzing strategic and operational effects on manufacturing costs," International Journal of Production Economics, Elsevier, vol. 232(C).
    3. Yeh, Chung-Hsing & Xu, Yan, 2013. "Managing critical success strategies for an enterprise resource planning project," European Journal of Operational Research, Elsevier, vol. 230(3), pages 604-614.
    4. Chou, Jui-Sheng & Tai, Yian & Chang, Lian-Ji, 2010. "Predicting the development cost of TFT-LCD manufacturing equipment with artificial intelligence models," International Journal of Production Economics, Elsevier, vol. 128(1), pages 339-350, November.
    5. H'mida, Fehmi & Martin, Patrick & Vernadat, Francois, 2006. "Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering," International Journal of Production Economics, Elsevier, vol. 103(1), pages 17-35, September.
    6. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    7. Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
    8. Fabio Magnacca & Riccardo Giannetti, 2024. "Management accounting and new product development: a systematic literature review and future research directions," Journal of Management & Governance, Springer;Accademia Italiana di Economia Aziendale (AIDEA), vol. 28(2), pages 651-685, June.
    9. Deng, S. & Yeh, Tsung-Han, 2011. "Using least squares support vector machines for the airframe structures manufacturing cost estimation," International Journal of Production Economics, Elsevier, vol. 131(2), pages 701-708, June.
    10. Johnson, Michael D. & Kirchain, Randolph E., 2009. "Quantifying the effects of product family decisions on material selection: A process-based costing approach," International Journal of Production Economics, Elsevier, vol. 120(2), pages 653-668, August.
    11. Muhammad Jamil Anjum, 2011. "Users Satisfaction and ERP Implementation Success," Information Management and Business Review, AMH International, vol. 3(5), pages 265-272.
    12. S. Valsamidis & A. Mandilas & M. Nikolaidis & P. Polychronidou, 2009. "ERP PACKAGE EVALUATION, THE CASE OF SMEs KAVALA's REGION," Annales Universitatis Apulensis Series Oeconomica, Faculty of Sciences, "1 Decembrie 1918" University, Alba Iulia, vol. 1(11), pages 1-1.
    13. Christian Meier & Dennis Kundisch & Jochen Willeke, 2017. "Is it Worth the Effort?," Business & Information Systems Engineering: The International Journal of WIRTSCHAFTSINFORMATIK, Springer;Gesellschaft für Informatik e.V. (GI), vol. 59(2), pages 81-95, April.
    14. Yusuf, Yahaya & Gunasekaran, A. & Abthorpe, Mark S., 2004. "Enterprise information systems project implementation:: A case study of ERP in Rolls-Royce," International Journal of Production Economics, Elsevier, vol. 87(3), pages 251-266, February.
    15. Fan, Miao & Lin, Neng-Pai & Sheu, Chwen, 2008. "Choosing a project risk-handling strategy: An analytical model," International Journal of Production Economics, Elsevier, vol. 112(2), pages 700-713, April.
    16. Askarany, Davood & Yazdifar, Hassan, 2012. "An investigation into the mixed reported adoption rates for ABC: Evidence from Australia, New Zealand and the UK," International Journal of Production Economics, Elsevier, vol. 135(1), pages 430-439.
    17. Erlane K Ghani & Siti Aimi Mohamad Yasin & Mazurina Mohd Ali, 2019. "Examining Enterprise Resource Planning Post Implementation and Employees¡¯ Performance in Small and Medium Enterprises Using DeLone and McLean¡¯s Information System Success Model," International Journal of Financial Research, International Journal of Financial Research, Sciedu Press, vol. 10(3), pages 153-169, May.
    18. Amadi-Echendu, J.E. & de Wit, F.C.P., 2015. "Technology adoption: A study on post-implementation perceptions and acceptance of computerised maintenance management systems," Technology in Society, Elsevier, vol. 43(C), pages 209-218.
    19. Brunelli, Matteo & Corrente, Salvatore, 2024. "Modeling criteria and project interactions in portfolio decision analysis with the Choquet integral," Omega, Elsevier, vol. 126(C).
    20. Emmanouil Tziolas & Stefanos Ispikoudis & Konstantinos Mantzanas & Dimitrios Koutsoulis & Anastasia Pantera, 2022. "Economic and Environmental Assessment of Olive Agroforestry Practices in Northern Greece," Agriculture, MDPI, vol. 12(6), pages 1-15, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:161:y:2015:i:c:p:105-115. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.