Myopic optimal policy for a multi-period, two-delivery-lead-times, stochastic inventory problem with minimum cumulative commitment and capacity
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Xu, Ningxiong, 2009. "Optimal policy for a two-facility inventory problem with storage constraints and two freight modes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 78-84, April.
- Serel, Dogan A. & Dada, Maqbool & Moskowitz, Herbert, 2001. "Sourcing decisions with capacity reservation contracts," European Journal of Operational Research, Elsevier, vol. 131(3), pages 635-648, June.
- Zhao, Xiande & Xie, Jinxing & Wei, Jerry C., 2007. "The value of early order commitment in a two-level supply chain," European Journal of Operational Research, Elsevier, vol. 180(1), pages 194-214, July.
- A. Federgruen & P. Zipkin, 1986. "An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion," Mathematics of Operations Research, INFORMS, vol. 11(2), pages 208-215, May.
- Suresh P. Sethi & Houmin Yan & Hanqin Zhang, 2003. "Inventory Models with Fixed Costs, Forecast Updates, and Two Delivery Modes," Operations Research, INFORMS, vol. 51(2), pages 321-328, April.
- Kamran Moinzadeh & Steven Nahmias, 2000. "Adjustment Strategies for a Fixed Delivery Contract," Operations Research, INFORMS, vol. 48(3), pages 408-423, June.
- Arthur F. Veinott, Jr., 1965. "Optimal Policy for a Multi-Product, Dynamic, Nonstationary Inventory Problem," Management Science, INFORMS, vol. 12(3), pages 206-222, November.
- Xu, Ningxiong, 2009. "Optimal policy for a dynamic, non-stationary, stochastic inventory problem with capacity commitment," European Journal of Operational Research, Elsevier, vol. 199(2), pages 400-408, December.
- Yoichiro Fukuda, 1964. "Optimal Policies for the Inventory Problem with Negotiable Leadtime," Management Science, INFORMS, vol. 10(4), pages 690-708, July.
- A. A. Tsay & W. S. Lovejoy, 1999. "Quantity Flexibility Contracts and Supply Chain Performance," Manufacturing & Service Operations Management, INFORMS, vol. 1(2), pages 89-111.
- Edward Ignall & Arthur F. Veinott, Jr., 1969. "Optimality of Myopic Inventory Policies for Several Substitute Products," Management Science, INFORMS, vol. 15(5), pages 284-304, January.
- A. Federgruen & P. Zipkin, 1986. "An Inventory Model with Limited Production Capacity and Uncertain Demands I. The Average-Cost Criterion," Mathematics of Operations Research, INFORMS, vol. 11(2), pages 193-207, May.
- Tibben-Lembke, Ronald S., 2004. "N-period contracts with ordering constraints and total minimum commitments: Optimal and heuristic solutions," European Journal of Operational Research, Elsevier, vol. 156(2), pages 353-374, July.
- Chen, Frank Y. & Hum, S. H. & Sun, J., 2001. "Analysis of third-party warehousing contracts with commitments," European Journal of Operational Research, Elsevier, vol. 131(3), pages 603-610, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Inderfurth, Karl & Kelle, Peter & Kleber, Rainer, 2013. "Dual sourcing using capacity reservation and spot market: Optimal procurement policy and heuristic parameter determination," European Journal of Operational Research, Elsevier, vol. 225(2), pages 298-309.
- Cheaitou, Ali & Cheaytou, Rima, 2019. "A two-stage capacity reservation supply contract with risky supplier and forecast updating," International Journal of Production Economics, Elsevier, vol. 209(C), pages 42-60.
- Jakšič, M. & Fransoo, J.C., 2018. "Dual sourcing in the age of near-shoring: Trading off stochastic capacity limitations and long lead times," European Journal of Operational Research, Elsevier, vol. 267(1), pages 150-161.
- Cheaitou, Ali & van Delft, Christian & Jemai, Zied & Dallery, Yves, 2014. "Optimal policy structure characterization for a two-period dual-sourcing inventory control model with forecast updating," International Journal of Production Economics, Elsevier, vol. 157(C), pages 238-249.
- Xiting Gong & Youhua (Frank) Chen & Quan Yuan, 2022. "Coordinating Inventory and Pricing Decisions Under Total Minimum Commitment Contracts," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 511-528, February.
- Cai, Jianhu & Hu, Xiaoqing & Jiang, Feiying & Zhou, Qing & Zhang, Xiaoyang & Xuan, Liyuan, 2019. "Optimal input quantity decisions considering commitment order contracts under yield uncertainty," International Journal of Production Economics, Elsevier, vol. 216(C), pages 398-412.
- Tong Wang & Xiting Gong & Sean X. Zhou, 2017. "Dynamic Inventory Management with Total Minimum Order Commitments and Two Supply Options," Operations Research, INFORMS, vol. 65(5), pages 1285-1302, October.
- Saif Benjaafar & David Chen & Rowan Wang, 2017. "Managing Production-Inventory Systems with Scarce Resources," Manufacturing & Service Operations Management, INFORMS, vol. 19(2), pages 216-229, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xu, Ningxiong, 2009. "Optimal policy for a dynamic, non-stationary, stochastic inventory problem with capacity commitment," European Journal of Operational Research, Elsevier, vol. 199(2), pages 400-408, December.
- Scheller-Wolf, Alan & Tayur, Sridhar, 2009. "Risk sharing in supply chains using order bands--Analytical results and managerial insights," International Journal of Production Economics, Elsevier, vol. 121(2), pages 715-727, October.
- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Xu, Ningxiong, 2008. "Myopic policy for a two-product and multi-period supply contract with different delivery lead times and storage limitation," International Journal of Production Economics, Elsevier, vol. 115(1), pages 179-188, September.
- Yehuda Bassok & Ravi Anupindi, 2008. "Analysis of supply contracts with commitments and flexibility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 459-477, August.
- Jian Yang & Xiangtong Qi & Yusen Xia, 2005. "A Production-Inventory System with Markovian Capacity and Outsourcing Option," Operations Research, INFORMS, vol. 53(2), pages 328-349, April.
- Retsef Levi & Robin O. Roundy & David B. Shmoys & Van Anh Truong, 2008. "Approximation Algorithms for Capacitated Stochastic Inventory Control Models," Operations Research, INFORMS, vol. 56(5), pages 1184-1199, October.
- Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
- Berling, Peter & Eng-Larsson, Fredrik, 2017. "Environmental implications of transport contract choice - capacity investment and pricing under volume and capacity contracts," European Journal of Operational Research, Elsevier, vol. 261(1), pages 129-142.
- Xiuli Chao & Xiting Gong & Cong Shi & Chaolin Yang & Huanan Zhang & Sean X. Zhou, 2018. "Approximation Algorithms for Capacitated Perishable Inventory Systems with Positive Lead Times," Management Science, INFORMS, vol. 64(11), pages 5038-5061, November.
- Chaolin Yang & Diyuan Huang & Chenyang Xu, 2022. "Multi-index base-stock policy for inventory systems with multiple capacitated suppliers," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(1), pages 155-177, March.
- Wen Chen & Ying He, 2022. "Dynamic pricing and inventory control with delivery flexibility," Annals of Operations Research, Springer, vol. 317(2), pages 481-508, October.
- Iida, Tetsuo, 2002. "A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand," European Journal of Operational Research, Elsevier, vol. 140(3), pages 670-683, August.
- Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Continuous‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 154-169, January.
- Özalp Özer & Wei Wei, 2004. "Inventory Control with Limited Capacity and Advance Demand Information," Operations Research, INFORMS, vol. 52(6), pages 988-1000, December.
- Wen Chen & Burcu Tan, 2022. "Dynamic procurement from multiple suppliers with random capacities," Annals of Operations Research, Springer, vol. 317(2), pages 509-536, October.
- Saif Benjaafar & David Chen & Rowan Wang, 2017. "Managing Production-Inventory Systems with Scarce Resources," Manufacturing & Service Operations Management, INFORMS, vol. 19(2), pages 216-229, May.
- Yang, Yi & Yuan, Quan & Xue, Weili & Zhou, Yun, 2014. "Analysis of batch ordering inventory models with setup cost and capacity constraint," International Journal of Production Economics, Elsevier, vol. 155(C), pages 340-350.
- Xavier Brusset, 2005. "Comparison between minimum purchase, quantity flexibility contracts and spot procurement in a supply chain," Econometrics 0512007, University Library of Munich, Germany.
More about this item
Keywords
Additive function Capacity Minimum cumulative order quantity commitment Myopic policy Stochastic dynamic programming Two-delivery-lead-times;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:133:y:2011:i:2:p:719-727. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.