IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v112y2008i2p1002-1010.html
   My bibliography  Save this article

On a multi-product model of lot-sizing with quality costs

Author

Listed:
  • Kulkarni, Shailesh S.

Abstract

In this note we consider a multi-product environment where production lot-sizing and investing for quality improvement in several production processes are desired. We develop a mathematical model for addressing this important problem. We use our model to calculate the optimal lot-sizes and the optimal allocation of investment across products in the presence of a budget constraint. We quantify quality loss costs more effectively than the traditionally used Taguchi loss function, in the context of production lot-sizing, by using a modified form of the reflected normal loss function and develop several insights into the nature of the optimal solution. Finally, we show that our model and overall method can be readily adapted to a spreadsheet-based environment and consequently have practical and managerial relevance.

Suggested Citation

  • Kulkarni, Shailesh S., 2008. "On a multi-product model of lot-sizing with quality costs," International Journal of Production Economics, Elsevier, vol. 112(2), pages 1002-1010, April.
  • Handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:1002-1010
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00337-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Papachristos, S. & Konstantaras, I., 2006. "Economic ordering quantity models for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 100(1), pages 148-154, March.
    2. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
    3. Kulkarni, Shailesh & Prybutok, Victor, 2004. "Process investment and loss functions: Models and analysis," European Journal of Operational Research, Elsevier, vol. 157(1), pages 120-129, August.
    4. Ganeshan, Ram & Kulkarni, Shailesh & Boone, Tonya, 2001. "Production economics and process quality: A Taguchi perspective," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 343-350, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
    2. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    3. Bozorgi, Ali, 2016. "Multi-product inventory model for cold items with cost and emission consideration," International Journal of Production Economics, Elsevier, vol. 176(C), pages 123-142.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    2. Kulkarni, Shailesh S., 2008. "Loss-based quality costs and inventory planning: General models and insights," European Journal of Operational Research, Elsevier, vol. 188(2), pages 428-449, July.
    3. Freiesleben, Johannes, 2008. "A proposal for an economic quality loss function," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1012-1024, June.
    4. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    5. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
    6. Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
    7. M. Ganesh Kumar & R. Uthayakumar, 2019. "A two-echelon integrated inventory model under generalized lead time distribution with variable backordering rate," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(4), pages 552-562, August.
    8. Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
    9. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
    10. Dipak Barman & Gour Chandra Mahata, 2022. "Two-echelon production inventory model with imperfect quality items with ordering cost reduction depending on controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2656-2671, October.
    11. Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
    12. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    13. Kumar, U. Dinesh & Nowicki, David & Ramirez-Marquez, Jose Emmanuel & Verma, Dinesh, 2008. "On the optimal selection of process alternatives in a Six Sigma implementation," International Journal of Production Economics, Elsevier, vol. 111(2), pages 456-467, February.
    14. Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
    15. Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
    16. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    17. József Vörös, 2013. "Economic order and production quantity models without constraint on the percentage of defective items," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 867-885, December.
    18. Eroglu, Abdullah & Ozdemir, Gultekin, 2007. "An economic order quantity model with defective items and shortages," International Journal of Production Economics, Elsevier, vol. 106(2), pages 544-549, April.
    19. Maddah, Bacel & Jaber, Mohamad Y., 2008. "Economic order quantity for items with imperfect quality: Revisited," International Journal of Production Economics, Elsevier, vol. 112(2), pages 808-815, April.
    20. Luciano Novais & Juan Manuel Maqueira & Ángel Ortiz & Sebastián Bruque, 2021. "Strategic simulation models as a new methodological approach: an application to information technologies integration, lean/just-in-time and lead-time," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1185-1218, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:1002-1010. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.