An optimization model for gate reassignment in response to flight delays
Author
Abstract
Suggested Citation
DOI: 10.1016/j.jairtraman.2011.02.012
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yan, Shangyao & Shieh, Chi-Yuan & Chen, Miawjane, 2002. "A simulation framework for evaluating airport gate assignments," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(10), pages 885-898, December.
- Yan, Shangyao & Tang, Ching-Hui, 2007. "A heuristic approach for airport gate assignments for stochastic flight delays," European Journal of Operational Research, Elsevier, vol. 180(2), pages 547-567, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Pternea, Moschoula & Haghani, Ali, 2019. "An aircraft-to-gate reassignment framework for dealing with schedule disruptions," Journal of Air Transport Management, Elsevier, vol. 78(C), pages 116-132.
- Tang, Ching-Hui & Wang, Wei-Chung, 2013. "Airport gate assignments for airline-specific gates," Journal of Air Transport Management, Elsevier, vol. 30(C), pages 10-16.
- Sismanidou, Athina & Tarradellas, Joan & Suau-Sanchez, Pere, 2022. "The uneven geography of US air traffic delays: Quantifying the impact of connecting passengers on delay propagation," Journal of Transport Geography, Elsevier, vol. 98(C).
- Poyraz, Dursen Deniz & AzizoÄŸlu, Meral, 2024. "An airport gate reassignment problem with gate closures," Journal of Air Transport Management, Elsevier, vol. 115(C).
- Zhang, Dong & Klabjan, Diego, 2017. "Optimization for gate re-assignment," Transportation Research Part B: Methodological, Elsevier, vol. 95(C), pages 260-284.
- Skorupski, Jacek & Żarów, Piotr, 2021. "Dynamic management of aircraft stand allocation," Journal of Air Transport Management, Elsevier, vol. 90(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bagamanova, Margarita & Mota, Miguel Mujica, 2020. "A multi-objective optimization with a delay-aware component for airport stand allocation," Journal of Air Transport Management, Elsevier, vol. 83(C).
- Amadeo Ascó, 2016. "An Analysis of Robustness Approaches for the Airport Baggage Sorting Station Assignment Problem," Journal of Optimization, Hindawi, vol. 2016, pages 1-19, September.
- Xu, Liang & Zhang, Chao & Xiao, Feng & Wang, Fan, 2017. "A robust approach to airport gate assignment with a solution-dependent uncertainty budget," Transportation Research Part B: Methodological, Elsevier, vol. 105(C), pages 458-478.
- Skorupski, Jacek & Żarów, Piotr, 2021. "Dynamic management of aircraft stand allocation," Journal of Air Transport Management, Elsevier, vol. 90(C).
- Bert Dijk & Bruno F. Santos & Joao P. Pita, 2019. "The recoverable robust stand allocation problem: a GRU airport case study," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(3), pages 615-639, September.
- Zhang, Dong & Klabjan, Diego, 2017. "Optimization for gate re-assignment," Transportation Research Part B: Methodological, Elsevier, vol. 95(C), pages 260-284.
- Dorndorf, Ulrich & Drexl, Andreas & Nikulin, Yury & Pesch, Erwin, 2005. "Flight gate scheduling: State-of-the-art and recent developments," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 584, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Hu, Rong & Wang, Deyun & Feng, Huilin & Zhang, Junfeng & Pan, Xiaoran & Deng, Songwu, 2024. "Joint gate-runway scheduling considering carbon emissions, airport noise and ground-air coordination," Journal of Air Transport Management, Elsevier, vol. 116(C).
- Şeker, Merve & Noyan, Nilay, 2012. "Stochastic optimization models for the airport gate assignment problem," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(2), pages 438-459.
- Ulrich Dorndorf & Florian Jaehn & Erwin Pesch, 2017. "Flight gate assignment and recovery strategies with stochastic arrival and departure times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 65-93, January.
- Shangyao Yan & Chia-Hung Chen & Chung-Kai Chen, 2008. "Short-term shift setting and manpower supplying under stochastic demands for air cargo terminals," Transportation, Springer, vol. 35(3), pages 425-444, May.
- Ya Xu & Qiushuang Chen & Xiongwen Quan, 2012. "Robust berth scheduling with uncertain vessel delay and handling time," Annals of Operations Research, Springer, vol. 192(1), pages 123-140, January.
- Yan, Shangyao & Lin, Jenn-Rong & Lai, Chun-Wei, 2013. "The planning and real-time adjustment of courier routing and scheduling under stochastic travel times and demands," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 34-48.
- Yan, Shangyao & Tang, Chin-Hui & Chen, Miawjane, 2004. "A model and a solution algorithm for airport common use check-in counter assignments," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(2), pages 101-125, February.
- Yan, Shangyao & Chi, Chin-Jen & Tang, Ching-Hui, 2006. "Inter-city bus routing and timetable setting under stochastic demands," Transportation Research Part A: Policy and Practice, Elsevier, vol. 40(7), pages 572-586, August.
- Narciso, Mercedes E. & Piera, Miquel A., 2015. "Robust gate assignment procedures from an airport management perspective," Omega, Elsevier, vol. 50(C), pages 82-95.
- Mujica Mota, Miguel, 2015. "Check-in allocation improvements through the use of a simulation–optimization approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 77(C), pages 320-335.
- Jaehn, Florian & Neumann, Simone, 2015. "Airplane boarding," European Journal of Operational Research, Elsevier, vol. 244(2), pages 339-359.
- Pternea, Moschoula & Haghani, Ali, 2019. "An aircraft-to-gate reassignment framework for dealing with schedule disruptions," Journal of Air Transport Management, Elsevier, vol. 78(C), pages 116-132.
- Daş, Gülesin Sena & Gzara, Fatma & Stützle, Thomas, 2020. "A review on airport gate assignment problems: Single versus multi objective approaches," Omega, Elsevier, vol. 92(C).
More about this item
Keywords
Flight gate reassignment; Flight delays; Integer programming; 2000 MSC: code 90B06 90C05 90C10;All these keywords.
JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:17:y:2011:i:4:p:256-261. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.