An improved risk-benefit collaborative grey target decision model and its application in the decision making of load adjustment schemes
Author
Abstract
Suggested Citation
DOI: 10.1016/j.energy.2018.05.119
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rosha, Pali & Mohapatra, Saroj Kumar & Mahla, Sunil Kumar & Dhir, Amit, 2019. "Hydrogen enrichment of biogas via dry and autothermal-dry reforming with pure nickel (Ni) nanoparticle," Energy, Elsevier, vol. 172(C), pages 733-739.
- Sun, Hong & Yu, Mingfu & Li, Qiang & Zhuang, Kaiming & Li, Jie & Almheiri, Saif & Zhang, Xiaochen, 2019. "Characteristics of charge/discharge and alternating current impedance in all-vanadium redox flow batteries," Energy, Elsevier, vol. 168(C), pages 693-701.
- Kumar, Pankaj & Banerjee, Rangan & Mishra, Trupti, 2020. "A framework for analyzing trade-offs in cost and emissions in power sector," Energy, Elsevier, vol. 195(C).
- Groissböck, Markus & Gusmão, Alexandre, 2020. "Impact of renewable resource quality on security of supply with high shares of renewable energies," Applied Energy, Elsevier, vol. 277(C).
- Zhiqiang Jiang & Zhengyang Tang & Yi Liu & Yuyun Chen & Zhongkai Feng & Yang Xu & Hairong Zhang, 2019. "Area Moment and Error Based Forecasting Difficulty and its Application in Inflow Forecasting Level Evaluation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 33(13), pages 4553-4568, October.
- Yunqi Zhao & Jing Xiang & Jiaming Xu & Jinying Li & Ning Zhang, 2019. "Study on the Comprehensive Benefit Evaluation of Transnational Power Networking Projects Based on Multi-Project Stakeholder Perspectives," Energies, MDPI, vol. 12(2), pages 1-21, January.
- Smitha, T.V. & Nagaraja, K.V., 2019. "Application of automated cubic-order mesh generation for efficient energy transfer using parabolic arcs for microwave problems," Energy, Elsevier, vol. 168(C), pages 1104-1118.
- Daneshvar, Mohammadreza & Mohammadi-Ivatloo, Behnam & Zare, Kazem & Asadi, Somayeh, 2020. "Two-stage stochastic programming model for optimal scheduling of the wind-thermal-hydropower-pumped storage system considering the flexibility assessment," Energy, Elsevier, vol. 193(C).
- Hungerford, Zoe & Bruce, Anna & MacGill, Iain, 2019. "The value of flexible load in power systems with high renewable energy penetration," Energy, Elsevier, vol. 188(C).
- Chang, Soowon & Saha, Nirvik & Castro-Lacouture, Daniel & Yang, Perry Pei-Ju, 2019. "Multivariate relationships between campus design parameters and energy performance using reinforcement learning and parametric modeling," Applied Energy, Elsevier, vol. 249(C), pages 253-264.
- Luo, Xiaoyuan & Wang, Xinyu & Zhang, Mingyue & Guan, Xinping, 2019. "Distributed detection and isolation of bias injection attack in smart energy grid via interval observer," Applied Energy, Elsevier, vol. 256(C).
- Zhiqiang Jiang & Hui Qin & Changming Ji & Dechao Hu & Jianzhong Zhou, 2019. "Effect Analysis of Operation Stage Difference on Energy Storage Operation Chart of Cascade Reservoirs," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 33(4), pages 1349-1365, March.
- Penghui Ma & Yajin Hu & Hansheng Liu, 2019. "Optimal Design for Pressurized Irrigation Subunits with a Minimum Cost and Maximum Area for Uniformly Sloping Fields," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 33(8), pages 2711-2726, June.
- Penghui Ma & Yajin Hu & Hansheng Liu & Yuannong Li, 2020. "The Optimum Design Criteria for On-demand Pressurized Microirrigation Network Systems: Optimizing Subunits with Paired Laterals based on the Maximum Size," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 34(10), pages 3237-3255, August.
- Yueqiu Wu & Liping Wang & Yi Wang & Yanke Zhang & Jiajie Wu & Qiumei Ma & Xiaoqing Liang & Bin He, 2021. "Risk Analysis for Short-Term Operation of the Power Generation in Cascade Reservoirs Considering Multivariate Reservoir Inflow Forecast Errors," Sustainability, MDPI, vol. 13(7), pages 1-16, March.
More about this item
Keywords
Cascade hydropower stations; Evaluating indicator; Evaluation methods; Load adjustment scheme; Decision-making; Risk-benefit;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:156:y:2018:i:c:p:387-400. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.