The complexity of shop-scheduling problems with two or three jobs
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Peter Brucker & Yu Sotskov & Frank Werner, 2007. "Complexity of shop-scheduling problems with fixed number of jobs: a survey," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 461-481, June.
- Abdeljaouad, Mohamed Amine & Bahroun, Zied & Omrane, Anissa & Fondrevelle, Julien, 2015. "Job-shop production scheduling with reverse flows," European Journal of Operational Research, Elsevier, vol. 244(1), pages 117-128.
- Boros, Endre & Gurvich, Vladimir, 2000. "Stable effectivity functions and perfect graphs," Mathematical Social Sciences, Elsevier, vol. 39(2), pages 175-194, March.
- Agnetis, Alessandro & Kellerer, Hans & Nicosia, Gaia & Pacifici, Andrea, 2012. "Parallel dedicated machines scheduling with chain precedence constraints," European Journal of Operational Research, Elsevier, vol. 221(2), pages 296-305.
- Mati, Yazid & Xie, Xiaolan, 2004. "The complexity of two-job shop problems with multi-purpose unrelated machines," European Journal of Operational Research, Elsevier, vol. 152(1), pages 159-169, January.
- Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
- Yuri N. Sotskov, 2020. "Mixed Graph Colorings: A Historical Review," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- Peleg, Bezalel & Peters, Hans & Storcken, Ton, 2002. "Nash consistent representation of constitutions: a reaction to the Gibbard paradox," Mathematical Social Sciences, Elsevier, vol. 43(2), pages 267-287, March.
- Shakhlevich, Natalia V. & Sotskov, Yuri N. & Werner, Frank, 2000. "Complexity of mixed shop scheduling problems: A survey," European Journal of Operational Research, Elsevier, vol. 120(2), pages 343-351, January.
- Martin Middendorf & Vadim G. Timkovsky, 1999. "Transversal Graphs for Partially Ordered Sets: Sequencing, Merging and Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 3(4), pages 417-435, December.
- Gaia Nicosia & Andrea Pacifici, 2017. "Scheduling assembly tasks with caterpillar precedence constraints on dedicated machines," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1680-1691, March.
- Peter Damaschke, 2019. "Parameterized Mixed Graph Coloring," Journal of Combinatorial Optimization, Springer, vol. 38(2), pages 362-374, August.
- Y N Sotskov & A Allahverdi & T-C Lai, 2004. "Flowshop scheduling problem to minimize total completion time with random and bounded processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 277-286, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:53:y:1991:i:3:p:326-336. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.