An optimal algorithm for the multi-item capacitated production planning problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kimms, Alf & Drexl, Andreas, 1996. "Shortcomings of MRP II and a new planning meta-method," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 404, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Kimms, Alf, 1996. "Improved lower bounds for the proportional lot sizing and scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 414, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Kimms, Alf & Drexl, Andreas, 1996. "Proportional lot sizing and scheduling: Some extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 407, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- H. Neil Geismar & Gilbert Laporte & Lei Lei & Chelliah Sriskandarajah, 2008. "The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan," INFORMS Journal on Computing, INFORMS, vol. 20(1), pages 21-33, February.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Kimms, Alf, 1996. "A genetic algorithm for multi-level, multi-machine lot sizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 415, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Aghezzaf, El-Houssaine, 2000. "Lot-sizing problem with setup times in labor-based capacity production systems," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 1-9, March.
- Kimms, Alf & Drexl, Andreas, 1996. "Some insights into proportional lot sizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 406, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:52:y:1991:i:2:p:179-193. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.