IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v280y2020i3p860-875.html
   My bibliography  Save this article

Scheduling with release dates and preemption to minimize multiple max-form objective functions

Author

Listed:
  • Yuan, Jinjiang
  • Ng, C.T.
  • Cheng, T.C.E.

Abstract

In this paper, we study multi-agent scheduling with release dates and preemption on a single machine, where the scheduling objective function of each agent to be minimized is regular and of the maximum form (max-form). The multi-agent aspect has three versions, namely ND-agent (multiple agents with non-disjoint job sets), ID-agent (multiple agents with an identical job set), and CO-agent (multiple competing agents with mutually disjoint job sets). We consider three types of problems: The first type (type-1) is the constrained scheduling problem, in which one objective function is to be minimized, subject to the restriction that the values of the other objective functions are upper bounded. The second type (type-2) is the weighted-sum scheduling problem, in which a positive combination of the objective functions is to be minimized. The third type (type-3) is the Pareto scheduling problem, for which we aim to find all the Pareto-optimal points and their corresponding Pareto-optimal schedules. We show that the type-1 problems are polynomially solvable, and the type-2 and type-3 problems are strongly NP-hard even when all jobs’ release dates are zero and processing times are one. When the number of the scheduling criteria is fixed and they are all lateness-like, such as minimizing Cmax, Fmax, Lmax, Tmax, and WCmax, where WCmax is the maximum weighted completion time of the jobs, the type-2 and type-3 problems are polynomially solvable. To address the type-3 problems, we develop a new solution technique that guesses the Pareto-optimal points through some elaborately constructed schedule-configurations.

Suggested Citation

  • Yuan, Jinjiang & Ng, C.T. & Cheng, T.C.E., 2020. "Scheduling with release dates and preemption to minimize multiple max-form objective functions," European Journal of Operational Research, Elsevier, vol. 280(3), pages 860-875.
  • Handle: RePEc:eee:ejores:v:280:y:2020:i:3:p:860-875
    DOI: 10.1016/j.ejor.2019.07.072
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221719306514
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2019.07.072?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chen, Rubing & Geng, Zhichao & Lu, Lingfa & Yuan, Jinjiang & Zhang, Yuan, 2022. "Pareto-scheduling of two competing agents with their own equal processing times," European Journal of Operational Research, Elsevier, vol. 301(2), pages 414-431.
    2. Wenjie Li & Jinjiang Yuan, 2021. "Single-machine online scheduling of jobs with non-delayed processing constraint," Journal of Combinatorial Optimization, Springer, vol. 41(4), pages 830-843, May.
    3. Yuan Gao & Jinjiang Yuan & C. T. Ng & T. C. E. Cheng, 2022. "Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost," 4OR, Springer, vol. 20(2), pages 273-287, June.
    4. Chen, Rubing & Yuan, Jinjiang & Ng, C.T. & Cheng, T.C.E., 2021. "Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion," European Journal of Operational Research, Elsevier, vol. 293(1), pages 79-92.
    5. Yuan Zhang & Jinjiang Yuan & Chi To Ng & Tai Chiu E. Cheng, 2021. "Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(3), pages 378-393, April.
    6. Shi-Sheng Li & Ren-Xia Chen, 2023. "Competitive two-agent scheduling with release dates and preemption on a single machine," Journal of Scheduling, Springer, vol. 26(3), pages 227-249, June.
    7. Shi-Sheng Li & Jin-Jiang Yuan, 2020. "Single-machine scheduling with multi-agents to minimize total weighted late work," Journal of Scheduling, Springer, vol. 23(4), pages 497-512, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:280:y:2020:i:3:p:860-875. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.