The x-and-y-axes travelling salesman problem
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2012.06.036
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- van Dal, Rene & van der Veen, Jack A. A. & Sierksma, Gerard, 1993. "Small and large TSP: Two polynomially solvable cases of the traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 69(1), pages 107-120, August.
- van der Veen, Jack A. A. & Sierksma, Gerard & van Dal, Rene, 1991. "Pyramidal tours and the traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 52(1), pages 90-102, May.
- Özpeynirci, Özgür & Köksalan, Murat, 2009. "Multiobjective traveling salesperson problem on Halin graphs," European Journal of Operational Research, Elsevier, vol. 196(1), pages 155-161, July.
- Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
- Oda, Yoshiaki, 2002. "An asymmetric analog of van der Veen conditions and the traveling salesman problem (II)," European Journal of Operational Research, Elsevier, vol. 138(1), pages 43-62, April.
- P. C. Gilmore & R. E. Gomory, 1964. "Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem," Operations Research, INFORMS, vol. 12(5), pages 655-679, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wang, Zutong & Guo, Jiansheng & Zheng, Mingfa & Wang, Ying, 2015. "Uncertain multiobjective traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 241(2), pages 478-489.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Özgür Özpeynirci & Murat Köksalan, 2010. "Pyramidal tours and multiple objectives," Journal of Global Optimization, Springer, vol. 48(4), pages 569-582, December.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Burkard, Rainer E., 2007. "Monge properties, discrete convexity and applications," European Journal of Operational Research, Elsevier, vol. 176(1), pages 1-14, January.
- Diclehan Tezcaner & Murat Köksalan, 2011. "An Interactive Algorithm for Multi-objective Route Planning," Journal of Optimization Theory and Applications, Springer, vol. 150(2), pages 379-394, August.
- Waldherr, Stefan & Knust, Sigrid, 2017. "Decomposition algorithms for synchronous flow shop problems with additional resources and setup times," European Journal of Operational Research, Elsevier, vol. 259(3), pages 847-863.
- Lin, Shih-Wei & Ying, Kuo-Ching, 2013. "Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm," Omega, Elsevier, vol. 41(2), pages 383-389.
- Vahid Riahi & Morteza Kazemi, 2018. "A new hybrid ant colony algorithm for scheduling of no-wait flowshop," Operational Research, Springer, vol. 18(1), pages 55-74, April.
- Lin, Shih-Wei & Ying, Kuo-Ching, 2016. "Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics," Omega, Elsevier, vol. 64(C), pages 115-125.
- Smutnicki, Czeslaw & Pempera, Jaroslaw & Bocewicz, Grzegorz & Banaszak, Zbigniew, 2022. "Cyclic flow-shop scheduling with no-wait constraints and missing operations," European Journal of Operational Research, Elsevier, vol. 302(1), pages 39-49.
- Panwalkar, S.S. & Koulamas, Christos, 2014. "The two-machine no-wait general and proportionate open shop makespan problem," European Journal of Operational Research, Elsevier, vol. 238(2), pages 471-475.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Batur, G. Didem & Karasan, Oya Ekin & Akturk, M. Selim, 2012. "Multiple part-type scheduling in flexible robotic cells," International Journal of Production Economics, Elsevier, vol. 135(2), pages 726-740.
- Annear, Luis Mauricio & Akhavan-Tabatabaei, Raha & Schmid, Verena, 2023. "Dynamic assignment of a multi-skilled workforce in job shops: An approximate dynamic programming approach," European Journal of Operational Research, Elsevier, vol. 306(3), pages 1109-1125.
- Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
- Diclehan Tezcaner Öztürk & Murat Köksalan, 2016. "An interactive approach for biobjective integer programs under quasiconvex preference functions," Annals of Operations Research, Springer, vol. 244(2), pages 677-696, September.
- Kravchenko, Svetlana A., 1998. "A polynomial algorithm for a two-machine no-wait job-shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 106(1), pages 101-107, April.
- Lieshout, P.M.D. & Volgenant, A., 2007. "A branch-and-bound algorithm for the singly constrained assignment problem," European Journal of Operational Research, Elsevier, vol. 176(1), pages 151-164, January.
- Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2020. "Coupled task scheduling with exact delays: Literature review and models," European Journal of Operational Research, Elsevier, vol. 282(1), pages 19-39.
- Kalczynski, Pawel J. & Kamburowski, Jerzy, 2009. "An empirical analysis of the optimality rate of flow shop heuristics," European Journal of Operational Research, Elsevier, vol. 198(1), pages 93-101, October.
- Martinez, S. & Dauzere-Peres, S. & Gueret, C. & Mati, Y. & Sauer, N., 2006. "Complexity of flowshop scheduling problems with a new blocking constraint," European Journal of Operational Research, Elsevier, vol. 169(3), pages 855-864, March.
More about this item
Keywords
Combinatorial optimization; Polynomial-time algorithm; Computational complexity; Euclidean travelling salesman problem;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:223:y:2012:i:2:p:333-345. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.