IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v214y2011i3p674-682.html
   My bibliography  Save this article

The impact of transportation delays on repairshop capacity pooling and spare part inventories

Author

Listed:
  • Sahba, Pedram
  • BalcIog[small tilde]lu, BarIs

Abstract

In this paper, to serve different fleets of machines at different locations, we study whether repair shop pooling is more cost effective than having dedicated on-site repair shops for each fleet. When modeling the former alternative, we take transportation delays and related costs into account and represent it as a closed queueing network. This allows us to include on-site spare-part inventories that operate according to a continuous-review base-stock policy. We obtain the steady-state distribution of components at each location and the cost of the system with a pooled repair shop by applying the Mean-Value Analysis technique. Our numerical findings indicate that when transportation costs are reasonable, repair shop pooling is a better alternative.

Suggested Citation

  • Sahba, Pedram & BalcIog[small tilde]lu, BarIs, 2011. "The impact of transportation delays on repairshop capacity pooling and spare part inventories," European Journal of Operational Research, Elsevier, vol. 214(3), pages 674-682, November.
  • Handle: RePEc:eee:ejores:v:214:y:2011:i:3:p:674-682
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221711004474
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kutanoglu, Erhan & Mahajan, Mohit, 2009. "An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels," European Journal of Operational Research, Elsevier, vol. 194(3), pages 728-742, May.
    2. Haque, Lani & Armstrong, Michael J., 2007. "A survey of the machine interference problem," European Journal of Operational Research, Elsevier, vol. 179(2), pages 469-482, June.
    3. Saif Benjaafar & William L. Cooper & Joon-Seok Kim, 2005. "On the Benefits of Pooling in Production-Inventory Systems," Management Science, INFORMS, vol. 51(4), pages 548-565, April.
    4. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    5. Benjaafar, Saifallah, 1995. "Performance bounds for the effectiveness of pooling in multi-processing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 375-388, December.
    6. Gary D. Eppen, 1979. "Note--Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem," Management Science, INFORMS, vol. 25(5), pages 498-501, May.
    7. Caggiano, Kathryn E. & Jackson, Peter L. & Muckstadt, John A. & Rappold, James A., 2009. "Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization," European Journal of Operational Research, Elsevier, vol. 199(3), pages 744-749, December.
    8. Agnes Peña Perez & Paul Zipkin, 1997. "Dynamic Scheduling Rules for a Multiproduct Make-to-Stock Queue," Operations Research, INFORMS, vol. 45(6), pages 919-930, December.
    9. Kenneth R. Baker & Michael J. Magazine & Henry L. W. Nuttle, 1986. "The Effect of Commonality on Safety Stock in a Simple Inventory Model," Management Science, INFORMS, vol. 32(8), pages 982-988, August.
    10. Yang, Hongsuk & Schrage, Linus, 2009. "Conditions that cause risk pooling to increase inventory," European Journal of Operational Research, Elsevier, vol. 192(3), pages 837-851, February.
    11. William J. Gordon & Gordon F. Newell, 1967. "Closed Queuing Systems with Exponential Servers," Operations Research, INFORMS, vol. 15(2), pages 254-265, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Pedram Sahba & Barış Balcıog̃lu & Dragan Banjevic, 2018. "Multilevel rationing policy for spare parts when demand is state dependent," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 751-780, July.
    2. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    3. William Liang & Barış Balcıog̃lu & Robert Svaluto, 2013. "Scheduling policies for a repair shop problem," Annals of Operations Research, Springer, vol. 211(1), pages 273-288, December.
    4. uit het Broek, Michiel A.J. & Veldman, Jasper & Fazi, Stefano & Greijdanus, Roy, 2019. "Evaluating resource sharing for offshore wind farm maintenance: The case of jack-up vessels," Renewable and Sustainable Energy Reviews, Elsevier, vol. 109(C), pages 619-632.
    5. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable product-service supply chains for repairable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 299-321.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Çömez-Dolgan, Nagihan & Tanyeri, Başak, 2015. "Inventory performance with pooling: Evidence from mergers and acquisitions," International Journal of Production Economics, Elsevier, vol. 168(C), pages 331-339.
    2. Kim, Nayeon & Montreuil, Benoit & Klibi, Walid & Zied Babai, M., 2023. "Network inventory deployment for responsive fulfillment," International Journal of Production Economics, Elsevier, vol. 255(C).
    3. Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
    4. Bin Hu & Izak Duenyas & Damian R. Beil, 2013. "Does Pooling Purchases Lead to Higher Profits?," Management Science, INFORMS, vol. 59(7), pages 1576-1593, July.
    5. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    6. Ho-Yin Mak & Zuo-Jun Max Shen, 2014. "Pooling and Dependence of Demand and Yield in Multiple-Location Inventory Systems," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 263-269, May.
    7. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    8. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    9. Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
    10. Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    11. Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
    12. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    13. Hossein Abouee-Mehrizi & Opher Baron & Oded Berman, 2014. "Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities," Manufacturing & Service Operations Management, INFORMS, vol. 16(4), pages 561-577, October.
    14. William Liang & Barış Balcıog̃lu & Robert Svaluto, 2013. "Scheduling policies for a repair shop problem," Annals of Operations Research, Springer, vol. 211(1), pages 273-288, December.
    15. Pishchulov, Grigory & Richter, Knut, 2009. "Inventory rationing and sharing in pre-sell distribution with mobile communication technologies," International Journal of Production Economics, Elsevier, vol. 121(2), pages 584-600, October.
    16. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    17. Schmitt, Amanda J. & Sun, Siyuan Anthony & Snyder, Lawrence V. & Shen, Zuo-Jun Max, 2015. "Centralization versus decentralization: Risk pooling, risk diversification, and supply chain disruptions," Omega, Elsevier, vol. 52(C), pages 201-212.
    18. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    19. Hummy Song & Anita L. Tucker & Karen L. Murrell, 2015. "The Diseconomies of Queue Pooling: An Empirical Investigation of Emergency Department Length of Stay," Management Science, INFORMS, vol. 61(12), pages 3032-3053, December.
    20. Hong, Yoo Suk & Huh, Woonghee Tim & Kang, Changmuk, 2017. "Sourcing assemble-to-order inventories under supplier risk uncertainty," Omega, Elsevier, vol. 66(PA), pages 1-14.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:214:y:2011:i:3:p:674-682. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.