IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v211y2011i1p208-212.html
   My bibliography  Save this article

A note on "Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain"

Author

Listed:
  • Xiong, Huachun
  • Xie, Jinxing
  • Wang, Miao

Abstract

In a recent paper by Xie et al. [Xie, J., Zhou, D., Wei, J.C., Zhao, X., 2010. Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain. European Journal of Operational Research 200, 368-376], the authors have studied the early order commitment (EOC) strategy for a decentralized, two-level supply chain consisting of a single manufacturer and multiple retailers. They fail to provide an algorithm to determine the optimal EOC periods to minimize the total supply chain cost. This note proposes a polynomial-time algorithm to find the optimal solutions, and provides a new set of sufficient conditions under which the wholesale price discount scheme coordinates the whole supply chain.

Suggested Citation

  • Xiong, Huachun & Xie, Jinxing & Wang, Miao, 2011. "A note on "Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain"," European Journal of Operational Research, Elsevier, vol. 211(1), pages 208-212, May.
  • Handle: RePEc:eee:ejores:v:211:y:2011:i:1:p:208-212
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00641-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Xie, Jinxing & Zhou, Deming & Wei, Jerry C. & Zhao, Xiande, 2010. "Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain," European Journal of Operational Research, Elsevier, vol. 200(2), pages 368-376, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jain, Richa & Reindorp, Matthew & Chockalingam, Arun, 2023. "Buyer-backed purchase-order financing for SME supplier with uncertain yield," European Journal of Operational Research, Elsevier, vol. 307(2), pages 758-772.
    2. Viktoryia Buhayenko & Dick den Hertog, 2017. "Adjustable Robust Optimisation approach to optimise discounts for multi-period supply chain coordination under demand uncertainty," International Journal of Production Research, Taylor & Francis Journals, vol. 55(22), pages 6801-6823, November.
    3. Feng Tao & Yanhong Xie & Yao-Yu Wang & Fujun Lai & Kin Keung Lai, 2022. "Contract strategies in competitive supply chains subject to inventory inaccuracy," Annals of Operations Research, Springer, vol. 309(2), pages 641-661, February.
    4. Li, Yun & Yuan, Jiahang & Chen, Siyuan & Wu, Yanzi, 2024. "Optimal wind power capacity decision consider commitment contracts under uncertain power supply and electricity demand in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 201(C).
    5. Cai, Jianhu & Hu, Xiaoqing & Jiang, Feiying & Zhou, Qing & Zhang, Xiaoyang & Xuan, Liyuan, 2019. "Optimal input quantity decisions considering commitment order contracts under yield uncertainty," International Journal of Production Economics, Elsevier, vol. 216(C), pages 398-412.
    6. Matsui, Kenji, 2018. "When and what wholesale and retail prices should be set in multi-channel supply chains?," European Journal of Operational Research, Elsevier, vol. 267(2), pages 540-554.
    7. B. C. Giri & B. R. Sarker, 2016. "Coordinating a two-echelon supply chain under production disruption when retailers compete with price and service level," Operational Research, Springer, vol. 16(1), pages 71-88, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:211:y:2011:i:1:p:208-212. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.