On-line two-machine open shop scheduling with time lags
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kanet, John J., 1986. "Tactically delayed versus non-delay scheduling: An experimental investigation," European Journal of Operational Research, Elsevier, vol. 24(1), pages 99-105, January.
- John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
- Bo Chen & Arjen P.A. Vestjens & Gerhard J. Woeginger, 1998. "On-Line Scheduling of Two-Machine Open Shops Where Jobs Arrive Over Time," Journal of Combinatorial Optimization, Springer, vol. 1(4), pages 355-365, December.
- D Rebaine & V A Strusevich, 1999. "Two-machine open shop scheduling with special transportation times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 756-764, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Courtad, Brenda & Baker, Kenneth & Magazine, Michael & Polak, George, 2017. "Minimizing flowtime for paired tasks," European Journal of Operational Research, Elsevier, vol. 259(3), pages 818-828.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
- Madiha Harrabi & Olfa Belkahla Driss & Khaled Ghedira, 2021. "A hybrid evolutionary approach to job-shop scheduling with generic time lags," Journal of Scheduling, Springer, vol. 24(3), pages 329-346, June.
- Wiesław Kubiak, 2023. "On the complexity of open shop scheduling with time lags," Journal of Scheduling, Springer, vol. 26(3), pages 331-334, June.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jaeseok Huh & Inbeom Park & Seongmin Lim & Bohyung Paeng & Jonghun Park & Kwanho Kim, 2018. "Learning to Dispatch Operations with Intentional Delay for Re-Entrant Multiple-Chip Product Assembly Lines," Sustainability, MDPI, vol. 10(11), pages 1-21, November.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
- Jorge M. S. Valente, 2008. "Beam search heuristics for quadratic earliness and tardiness scheduling," FEP Working Papers 279, Universidade do Porto, Faculdade de Economia do Porto.
- Munier-Kordon, Alix & Rebaine, Djamal, 2010. "The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 203(1), pages 42-49, May.
- Black, Gary W. & McKay, Kenneth N. & Morton, Thomas E., 2006. "Aversion scheduling in the presence of risky jobs," European Journal of Operational Research, Elsevier, vol. 175(1), pages 338-361, November.
- F. Hwang & M. Kovalyov & B. Lin, 2014. "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence," Annals of Operations Research, Springer, vol. 217(1), pages 263-279, June.
- N Nekoiemehr & G Moslehi, 2011. "Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1403-1412, July.
- Mina Aliakbari & Joseph Geunes, 2022. "Multiple Train Repositioning Operations in a Railyard Network," SN Operations Research Forum, Springer, vol. 3(4), pages 1-31, December.
- Karen A. Brown & Thomas G. Schmitt & Richard J. Schonberger & Stephen Dennis, 2004. "Quadrant Homes Applies Lean Concepts in a Project Environment," Interfaces, INFORMS, vol. 34(6), pages 442-450, December.
- Shen, Liji & Dauzère-Pérès, Stéphane & Maecker, Söhnke, 2023. "Energy cost efficient scheduling in flexible job-shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 310(3), pages 992-1016.
- Jorge M. S. Valente & Maria R. A. Moreira & Alok Singh & Rui A. F. S. Alves, 2009. "Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs," FEP Working Papers 312, Universidade do Porto, Faculdade de Economia do Porto.
- Detienne, Boris & Pinson, Éric & Rivreau, David, 2010. "Lagrangian domain reductions for the single machine earliness-tardiness problem with release dates," European Journal of Operational Research, Elsevier, vol. 201(1), pages 45-54, February.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Jorge M. S. Valente, 2006. "Heuristics for the single machine scheduling problem with early and quadratic tardy penalties," FEP Working Papers 234, Universidade do Porto, Faculdade de Economia do Porto.
- Valente, Jorge M.S. & Alves, Rui A.F.S., 2007. "Heuristics for the early/tardy scheduling problem with release dates," International Journal of Production Economics, Elsevier, vol. 106(1), pages 261-274, March.
- John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
- Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
- Schaller, Jeffrey E. & Gupta, Jatinder N.D., 2008. "Single machine scheduling with family setups to minimize total earliness and tardiness," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1050-1068, June.
- Haiyan Wang & Chung‐Yee Lee, 2005. "Production and transport logistics scheduling with two transport mode choices," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(8), pages 796-809, December.
- Wiesław Kubiak, 2023. "On the complexity of open shop scheduling with time lags," Journal of Scheduling, Springer, vol. 26(3), pages 331-334, June.
More about this item
Keywords
On-line scheduling Open shops Time lags Greedy algorithm Worst case analysis;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:204:y:2010:i:1:p:14-19. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.