Economic optimization of off-line inspection with rework consideration
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
- Sheu, Shey-Huei, 1998. "A generalized age and block replacement of a system subject to shocks," European Journal of Operational Research, Elsevier, vol. 108(2), pages 345-362, July.
- S H Sheu & Y C Chen & W Y Wang & N H Shin, 2003. "Economic optimization of off-line inspection with inspection errors," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(8), pages 888-895, August.
- Refael Hassin, 1984. "A Dichotomous Search for a Geometric Random Variable," Operations Research, INFORMS, vol. 32(2), pages 423-439, April.
- Sheu, Shey-Huei, 1999. "Extended optimal replacement model for deteriorating systems," European Journal of Operational Research, Elsevier, vol. 112(3), pages 503-516, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hassin, Refael & Sarid, Anna, 2018. "Operations research applications of dichotomous search," European Journal of Operational Research, Elsevier, vol. 265(3), pages 795-812.
- Muhammad Babar Ramzan & Shehreyar Mohsin Qureshi & Sonia Irshad Mari & Muhammad Saad Memon & Mandeep Mittal & Muhammad Imran & Muhammad Waqas Iqbal, 2019. "Effect of Time-Varying Factors on Optimal Combination of Quality Inspectors for Offline Inspection Station," Mathematics, MDPI, vol. 7(1), pages 1-18, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hassin, Refael & Sarid, Anna, 2018. "Operations research applications of dichotomous search," European Journal of Operational Research, Elsevier, vol. 265(3), pages 795-812.
- Bendavid, Illana & Herer, Yale T., 2009. "Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control," European Journal of Operational Research, Elsevier, vol. 195(1), pages 139-155, May.
- Shoshana Anily & Abraham Grosfeld-Nir, 2006. "An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand," Operations Research, INFORMS, vol. 54(2), pages 311-323, April.
- Yale T. Herer & Tzvi Raz, 2000. "Optimal Parallel Inspection for Finding the First Nonconforming Unit in a Batch---An Information Theoretic Approach," Management Science, INFORMS, vol. 46(6), pages 845-857, June.
- S H Sheu & Y C Chen & W Y Wang & N H Shin, 2003. "Economic optimization of off-line inspection with inspection errors," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(8), pages 888-895, August.
- Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak, 2007. "Production to order and off‐line inspection when the production process is partially observable," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 845-858, December.
- Sheu, Shey-Huei & Lin, Yuh-Bin & Liao, Gwo-Liang, 2006. "Optimum policies for a system with general imperfect maintenance," Reliability Engineering and System Safety, Elsevier, vol. 91(3), pages 362-369.
- Tsai, Hsin-Nan & Sheu, Shey-Huei & Zhang, Zhe George, 2017. "A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 74-88.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Tang, Ya-yong & Lam, Yeh, 2006. "A [delta]-shock maintenance model for a deteriorating system," European Journal of Operational Research, Elsevier, vol. 168(2), pages 541-556, January.
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Ferreira, Rodrigo J.P. & de Almeida, Adiel Teixeira & Cavalcante, Cristiano A.V., 2009. "A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis," Reliability Engineering and System Safety, Elsevier, vol. 94(5), pages 905-912.
- Sheu, Shey-Huei & Chien, Yu-Hung, 2005. "Optimal burn-in time to minimize the cost for general repairable products sold under warranty," European Journal of Operational Research, Elsevier, vol. 163(2), pages 445-461, June.
- J-A Chen & Y-H Chien, 2007. "Optimal age-replacement policy for renewing warranted products," Journal of Risk and Reliability, , vol. 221(4), pages 229-237, December.
- Lim, J.H. & Qu, Jian & Zuo, Ming J., 2016. "Age replacement policy based on imperfect repair with random probability," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 24-33.
- Shey-Huei Sheu & Chin-Chih Chang & Yu-Hung Chien, 2011. "Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks," Annals of Operations Research, Springer, vol. 186(1), pages 317-329, June.
- Sheu, Shey-Huei & Chien, Yu-Hung, 2004. "Optimal age-replacement policy of a system subject to shocks with random lead-time," European Journal of Operational Research, Elsevier, vol. 159(1), pages 132-144, November.
- Abraham Grosfeld-Nir & Yigal Gerchak & Qi-Ming He, 2000. "Manufacturing to Order with Random Yield and Costly Inspection," Operations Research, INFORMS, vol. 48(5), pages 761-767, October.
- Cha, Ji Hwan, 2011. "Comparison of combined stochastic risk processes and its applications," European Journal of Operational Research, Elsevier, vol. 215(2), pages 404-410, December.
- Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.
More about this item
Keywords
Dynamic programming Quality control Optimization Off-line inspection Rework;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:194:y:2009:i:3:p:807-813. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.