Abstract

This paper addresses a problem arising in the coordination between two consecutive departments of a production system, where parts are processed in batches, and each batch is characterized by two distinct attributes. Due to the lack of interstage buffering between the two stages, these departments have to follow the same batch sequence. In the first department, a setup occurs every time the first attribute of a new batch is different from the one of the previous batch. In the downstream department, there is a setup when the second attribute changes in two consecutive batches. The problem consists in finding a batch sequence optimizing the number of setups paid by each department. This case results in a particular bi-objective combinatorial optimization problem. We present a geometrical characterization for the feasible solution set of the problem, and we propose three effective heuristics, as shown by an extensive experimental campaign. The proposed approach can be also used to solve a class of single-objective problems, in which setup costs in the two departments are general increasing functions of the number of setups.

Suggested Citation

  • Ciavotta, Michele & Detti, Paolo & Meloni, Carlo & Pranzo, Marco, 2008. "A bi-objective coordination setup problem in a two-stage production system," European Journal of Operational Research, Elsevier, vol. 189(3), pages 734-745, September.
  • Handle: RePEc:eee:ejores:v:189:y:2008:i:3:p:734-745
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)01181-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. A. Agnetis & P. Detti & C. Meloni & D. Pacciarelli, 2001. "Set-Up Coordination between Two Stages of a Supply Chain," Annals of Operations Research, Springer, vol. 107(1), pages 15-32, October.
    2. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    3. McIntosh, R. I. & Culley, S. J. & Mileham, A. R. & Owen, G. W., 2001. "Changeover improvement: A maintenance perspective," International Journal of Production Economics, Elsevier, vol. 73(2), pages 153-163, September.
    4. Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches," Operations Research, INFORMS, vol. 36(5), pages 767-777, October.
    5. Rios-Mercado, Roger Z. & Bard, Jonathan F., 1998. "Heuristics for the flow line problem with setup costs," European Journal of Operational Research, Elsevier, vol. 110(1), pages 76-98, October.
    6. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    7. Al-Haboubi, Mohamad H. & Selim, Shokri Z., 1993. "A sequencing problem in the weaving industry," European Journal of Operational Research, Elsevier, vol. 66(1), pages 65-71, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liao, Ching-Jong & Shyu, Cian-Ci & Tseng, Chao-Tang, 2009. "A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 117(1), pages 127-135, January.
    2. Dellino, G. & Laudadio, T. & Mari, R. & Mastronardi, N. & Meloni, C., 2018. "Microforecasting methods for fresh food supply chain management: A computational study," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 147(C), pages 100-120.
    3. Guillermo Garcia-Garcia & Yadvinder Singh & Sandeep Jagtap, 2022. "Optimising Changeover through Lean-Manufacturing Principles: A Case Study in a Food Factory," Sustainability, MDPI, vol. 14(14), pages 1-20, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liao, Ching-Jong & Shyu, Cian-Ci & Tseng, Chao-Tang, 2009. "A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 117(1), pages 127-135, January.
    2. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
    3. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    4. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    5. Lele Zhang & Andrew Wirth, 2016. "Online Machine Scheduling with Family Setups," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(04), pages 1-16, August.
    6. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Nossack, Jenny & Pesch, Erwin, 2014. "Minimizing setup costs in a transfer line design problem with sequential operation processing," International Journal of Production Economics, Elsevier, vol. 151(C), pages 186-194.
    7. Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
    8. Jinwen Ou, 2020. "Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection," Journal of Scheduling, Springer, vol. 23(5), pages 525-538, October.
    9. Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
    10. Pranzo, Marco, 2004. "Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times," European Journal of Operational Research, Elsevier, vol. 153(3), pages 581-592, March.
    11. Al-Anzi, Fawaz S. & Allahverdi, Ali & Kovalyov, Mikhail Y., 2007. "Batching deteriorating items with applications in computer communication and reverse logistics," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1002-1011, November.
    12. Lin, B.M.T. & Cheng, T.C.E. & Chou, A.S.C., 2007. "Scheduling in an assembly-type production chain with batch transfer," Omega, Elsevier, vol. 35(2), pages 143-151, April.
    13. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    14. Roger Z. Ríos-Mercado & Jonathan F. Bard, 2003. "The Flow Shop Scheduling Polyhedron with Setup Times," Journal of Combinatorial Optimization, Springer, vol. 7(3), pages 291-318, September.
    15. Lele Zhang & Andrew Wirth, 2010. "On-line machine scheduling with batch setups," Journal of Combinatorial Optimization, Springer, vol. 20(3), pages 285-306, October.
    16. Dominik Kress & Maksim Barketau & Erwin Pesch, 2018. "Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines," Journal of Scheduling, Springer, vol. 21(6), pages 595-606, December.
    17. Dunstall, Simon & Wirth, Andrew, 2005. "A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines," European Journal of Operational Research, Elsevier, vol. 167(2), pages 283-296, December.
    18. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
    19. Carlo Meloni & David Naso & Biagio Turchiano, 2006. "Setup coordination between two stages of a production system: A multi-objective evolutionary approach," Annals of Operations Research, Springer, vol. 147(1), pages 175-198, October.
    20. Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:189:y:2008:i:3:p:734-745. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.