Stability and optimality of a multi-product production and storage system under demand uncertainty
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Goyal, S. K. & Giri, B. C., 2003. "The production-inventory problem of a product with time varying demand, production and deterioration rates," European Journal of Operational Research, Elsevier, vol. 147(3), pages 549-557, June.
- S. P. Sethi & H. Yan & H. Zhang & Q. Zhang, 2002. "Optimal and Hierarchical Controls in Dynamic Stochastic Manufacturing Systems: A Survey," Manufacturing & Service Operations Management, INFORMS, vol. 4(2), pages 133-170.
- Salles, J. L. F. & do Val, J. B. R., 2001. "An impulse control problem of a production model with interruptions to follow stochastic demand," European Journal of Operational Research, Elsevier, vol. 132(1), pages 123-145, July.
- Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
- A. Federgruen & P. Zipkin, 1986. "An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion," Mathematics of Operations Research, INFORMS, vol. 11(2), pages 208-215, May.
- A. Jean-Marie & M.M. Tidball, 1999. "Application of the impulsive control of piecewisedeterministic processes to multi‐item single machinestochastic scheduling," Annals of Operations Research, Springer, vol. 88(0), pages 139-159, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Arruda, E.F. & Fragoso, M.D., 2015. "Solving average cost Markov decision processes by means of a two-phase time aggregation algorithm," European Journal of Operational Research, Elsevier, vol. 240(3), pages 697-705.
- Arruda, Edilson F. & Ourique, Fabrício O. & LaCombe, Jason & Almudevar, Anthony, 2013. "Accelerating the convergence of value iteration by using partial transition functions," European Journal of Operational Research, Elsevier, vol. 229(1), pages 190-198.
- Chakravorty, Satya S., 2009. "Improving distribution operations: Implementation of material handling systems," International Journal of Production Economics, Elsevier, vol. 122(1), pages 89-106, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2009. "The deterministic EPQ with partial backordering: A new approach," Omega, Elsevier, vol. 37(3), pages 624-636, June.
- Dimitris Bertsimas & Ioannis Ch. Paschalidis, 2001. "Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems," Operations Research, INFORMS, vol. 49(1), pages 119-133, February.
- Woonghee Tim Huh & Ganesh Janakiraman & Mahesh Nagarajan, 2016. "Capacitated Multiechelon Inventory Systems: Policies and Bounds," Manufacturing & Service Operations Management, INFORMS, vol. 18(4), pages 570-584, October.
- Sari, Kazim, 2010. "Exploring the impacts of radio frequency identification (RFID) technology on supply chain performance," European Journal of Operational Research, Elsevier, vol. 207(1), pages 174-183, November.
- James A. Rappold & John A. Muckstadt, 2000. "A computationally efficient approach for determining inventory levels in a capacitated multiechelon production‐distribution system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(5), pages 377-398, August.
- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Refik Güllü, 1996. "On the value of information in dynamic production/inventory problems under forecast evolution," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 289-303, March.
- Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
- Qi, Xiangtong, 2007. "Order splitting with multiple capacitated suppliers," European Journal of Operational Research, Elsevier, vol. 178(2), pages 421-432, April.
- Cheong, Taesu & Song, Sang Hwa, 2013. "The value of information on supply risk under random yields," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 60(C), pages 27-38.
- Awi Federgruen & Min Wang, 2015. "Inventory Models with Shelf-Age and Delay-Dependent Inventory Costs," Operations Research, INFORMS, vol. 63(3), pages 701-715, June.
- Paul Zipkin, 2008. "On the Structure of Lost-Sales Inventory Models," Operations Research, INFORMS, vol. 56(4), pages 937-944, August.
- Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
- Wang, Wan-Chih & Teng, Jinn-Tsair & Lou, Kuo-Ren, 2014. "Seller’s optimal credit period and cycle time in a supply chain for deteriorating items with maximum lifetime," European Journal of Operational Research, Elsevier, vol. 232(2), pages 315-321.
- Ali Salmasnia & Ali Talesh-Kazemi, 2022. "Integrating inventory planning, pricing and maintenance for perishable products in a two-component parallel manufacturing system with common cause failures," Operational Research, Springer, vol. 22(2), pages 1235-1265, April.
- Ioannis Ch. Paschalidis & Yong Liu, 2003. "Large Deviations-Based Asymptotics for Inventory Control in Supply Chains," Operations Research, INFORMS, vol. 51(3), pages 437-460, June.
- Berling, Peter & Eng-Larsson, Fredrik, 2017. "Environmental implications of transport contract choice - capacity investment and pricing under volume and capacity contracts," European Journal of Operational Research, Elsevier, vol. 261(1), pages 129-142.
- Xiuli Chao & Xiting Gong & Cong Shi & Chaolin Yang & Huanan Zhang & Sean X. Zhou, 2018. "Approximation Algorithms for Capacitated Perishable Inventory Systems with Positive Lead Times," Management Science, INFORMS, vol. 64(11), pages 5038-5061, November.
- van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
- Zou, Jing & Chang, Qing & Arinez, Jorge & Xiao, Guoxian, 2017. "Data-driven modeling and real-time distributed control for energy efficient manufacturing systems," Energy, Elsevier, vol. 127(C), pages 247-257.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:188:y:2008:i:2:p:406-427. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.