Scheduling of road vehicles in sugarcane transport: A case study at an Australian sugar mill
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Forbes, M. A. & Holt, J. N. & Watts, A. M., 1994. "An exact algorithm for multiple depot bus scheduling," European Journal of Operational Research, Elsevier, vol. 72(1), pages 115-124, January.
- Alberto, I. & Azcarate, C. & Mallor, F. & Mateo, P. M., 2002. "Optimization with simulation and multiobjective analysis in industrial decision-making: A case study," European Journal of Operational Research, Elsevier, vol. 140(2), pages 373-383, July.
- Martin, Adrienne & Sherington, John, 1997. "Participatory research methods--Implementation, effectiveness and institutional context," Agricultural Systems, Elsevier, vol. 55(2), pages 195-216, October.
- Haghani, Ali & Banihashemi, Mohamadreza & Chiang, Kun-Hung, 2003. "A comparative analysis of bus transit vehicle scheduling models," Transportation Research Part B: Methodological, Elsevier, vol. 37(4), pages 301-322, May.
- Carberry, P. S. & Hochman, Z. & McCown, R. L. & Dalgliesh, N. P. & Foale, M. A. & Poulton, P. L. & Hargreaves, J. N. G. & Hargreaves, D. M. G. & Cawthray, S. & Hillcoat, N. & Robertson, M. J., 2002. "The FARMSCAPE approach to decision support: farmers', advisers', researchers' monitoring, simulation, communication and performance evaluation," Agricultural Systems, Elsevier, vol. 74(1), pages 141-177, October.
- Roslof, Janne & Harjunkoski, Iiro & Westerlund, Tapio & Isaksson, Johnny, 2002. "Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure," European Journal of Operational Research, Elsevier, vol. 138(1), pages 29-42, April.
- Haghani, Ali & Banihashemi, Mohamadreza, 2002. "Heuristic approaches for solving large-scale bus transit vehicle scheduling problem with route time constraints," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(4), pages 309-333, May.
- Laporte, Gilbert, 1992. "The vehicle routing problem: An overview of exact and approximate algorithms," European Journal of Operational Research, Elsevier, vol. 59(3), pages 345-358, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rafael Paiva & Reinaldo Morabito, 2009. "An optimization model for the aggregate production planning of a Brazilian sugar and ethanol milling company," Annals of Operations Research, Springer, vol. 169(1), pages 117-130, July.
- Jena, Sanjay Dominik & Poggi, Marcus, 2013. "Harvest planning in the Brazilian sugar cane industry via mixed integer programming," European Journal of Operational Research, Elsevier, vol. 230(2), pages 374-384.
- Kamal Lamsal & Philip C. Jones & Barrett W. Thomas, 2017. "Sugarcane Harvest Logistics in Brazil," Transportation Science, INFORMS, vol. 51(2), pages 771-789, May.
- Ana Anokić & Zorica Stanimirović & Đorđe Stakić & Tatjana Davidović, 2021. "Metaheuristic approaches to a vehicle scheduling problem in sugar beet transportation," Operational Research, Springer, vol. 21(3), pages 2021-2053, September.
- Grunow, M. & Gunther, H.-O. & Westinner, R., 2007. "Supply optimization for the production of raw sugar," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 224-239, October.
- Neungmatcha, Woraya, 2016. "Multi-objective particle swarm optimization for mechanical harvester route planning of sugarcane field operationsAuthor-Name: Sethanan, Kanchana," European Journal of Operational Research, Elsevier, vol. 252(3), pages 969-984.
- Kusumastuti, Ratih Dyah & Donk, Dirk Pieter van & Teunter, Ruud, 2016. "Crop-related harvesting and processing planning: a review," International Journal of Production Economics, Elsevier, vol. 174(C), pages 76-92.
- Colin, Emerson C., 2009. "Mathematical programming accelerates implementation of agro-industrial sugarcane complex," European Journal of Operational Research, Elsevier, vol. 199(1), pages 232-235, November.
- Thamine G. Rodrigues & Ricardo L. Machado, 2023. "Life Cycle Assessment of the Sugarcane Supply Chain in the Brazilian Midwest Region," Sustainability, MDPI, vol. 16(1), pages 1-18, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Niu, Huimin & Zhou, Xuesong & Tian, Xiaopeng, 2018. "Coordinating assignment and routing decisions in transit vehicle schedules: A variable-splitting Lagrangian decomposition approach for solution symmetry breaking," Transportation Research Part B: Methodological, Elsevier, vol. 107(C), pages 70-101.
- Higgins, Andrew & Antony, George & Sandell, Gary & Davies, Ian & Prestwidge, Di & Andrew, Bill, 2004. "A framework for integrating a complex harvesting and transport system for sugar production," Agricultural Systems, Elsevier, vol. 82(2), pages 99-115, November.
- Kulkarni, Sarang & Krishnamoorthy, Mohan & Ranade, Abhiram & Ernst, Andreas T. & Patil, Rahul, 2018. "A new formulation and a column generation-based heuristic for the multiple depot vehicle scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 118(C), pages 457-487.
- Perumal, Shyam S.G. & Lusby, Richard M. & Larsen, Jesper, 2022. "Electric bus planning & scheduling: A review of related problems and methodologies," European Journal of Operational Research, Elsevier, vol. 301(2), pages 395-413.
- Shafahi, Yousef & Khani, Alireza, 2010. "A practical model for transfer optimization in a transit network: Model formulations and solutions," Transportation Research Part A: Policy and Practice, Elsevier, vol. 44(6), pages 377-389, July.
- A J Higgins & L A Laredo, 2006. "Improving harvesting and transport planning within a sugar value chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 367-376, April.
- Hassold, Stephan & Ceder, Avishai (Avi), 2014. "Public transport vehicle scheduling featuring multiple vehicle types," Transportation Research Part B: Methodological, Elsevier, vol. 67(C), pages 129-143.
- Wang, Zhongxiang & Haghani, Ali, 2020. "Column generation-based stochastic school bell time and bus scheduling optimization," European Journal of Operational Research, Elsevier, vol. 286(3), pages 1087-1102.
- Uçar, Ezgi & İlker Birbil, Ş. & Muter, İbrahim, 2017. "Managing disruptions in the multi-depot vehicle scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 105(C), pages 249-269.
- Abdolmaleki, Mojtaba & Masoud, Neda & Yin, Yafeng, 2020. "Transit timetable synchronization for transfer time minimization," Transportation Research Part B: Methodological, Elsevier, vol. 131(C), pages 143-159.
- Jing-Quan Li, 2014. "Transit Bus Scheduling with Limited Energy," Transportation Science, INFORMS, vol. 48(4), pages 521-539, November.
- Gkiotsalitis, K. & Iliopoulou, C. & Kepaptsoglou, K., 2023. "An exact approach for the multi-depot electric bus scheduling problem with time windows," European Journal of Operational Research, Elsevier, vol. 306(1), pages 189-206.
- Sumitkumar, Rathor & Al-Sumaiti, Ameena Saad, 2024. "Shared autonomous electric vehicle: Towards social economy of energy and mobility from power-transportation nexus perspective," Renewable and Sustainable Energy Reviews, Elsevier, vol. 197(C).
- Blackstock, K.L. & Kelly, G.J. & Horsey, B.L., 2007. "Developing and applying a framework to evaluate participatory research for sustainability," Ecological Economics, Elsevier, vol. 60(4), pages 726-742, February.
- Almoustafa, Samira & Hanafi, Said & Mladenović, Nenad, 2013. "New exact method for large asymmetric distance-constrained vehicle routing problem," European Journal of Operational Research, Elsevier, vol. 226(3), pages 386-394.
- César Rego, 1998. "A Subpath Ejection Method for the Vehicle Routing Problem," Management Science, INFORMS, vol. 44(10), pages 1447-1459, October.
- Rubio, Francisco & Llopis-Albert, Carlos & Valero, Francisco, 2021. "Multi-objective optimization of costs and energy efficiency associated with autonomous industrial processes for sustainable growth," Technological Forecasting and Social Change, Elsevier, vol. 173(C).
- Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
- R. Baldacci & E. Hadjiconstantinou & A. Mingozzi, 2004. "An Exact Algorithm for the Capacitated Vehicle Routing Problem Based on a Two-Commodity Network Flow Formulation," Operations Research, INFORMS, vol. 52(5), pages 723-738, October.
- Bani, Abderrahman & El Hallaoui, Issmail & Corréa, Ayoub Insa & Tahir, Adil, 2023. "Solving a real-world multi-depot multi-period petrol replenishment problem with complex loading constraints," European Journal of Operational Research, Elsevier, vol. 311(1), pages 154-172.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:170:y:2006:i:3:p:987-1000. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.