IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v162y2005i1p173-183.html
   My bibliography  Save this article

Scheduling preemptive open shops to minimize total tardiness

Author

Listed:
  • Liaw, Ching-Fang

Abstract

No abstract is available for this item.

Suggested Citation

  • Liaw, Ching-Fang, 2005. "Scheduling preemptive open shops to minimize total tardiness," European Journal of Operational Research, Elsevier, vol. 162(1), pages 173-183, April.
  • Handle: RePEc:eee:ejores:v:162:y:2005:i:1:p:173-183
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00737-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. E. L. Lawler & J. K. Lenstra & A. H. G. Rinnooy Kan, 1981. "Minimizing Maximum Lateness in a Two-Machine Open Shop," Mathematics of Operations Research, INFORMS, vol. 6(1), pages 153-158, February.
    2. B. J. Lageweg & J. K. Lenstra & A. H. G. Rinnooy Kan, 1978. "A General Bounding Scheme for the Permutation Flow-Shop Problem," Operations Research, INFORMS, vol. 26(1), pages 53-67, February.
    3. Linus Schrage & Kenneth R. Baker, 1978. "Dynamic Programming Solution of Sequencing Problems with Precedence Constraints," Operations Research, INFORMS, vol. 26(3), pages 444-449, June.
    4. Yookun Cho & Sartaj Sahni, 1981. "Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops," Operations Research, INFORMS, vol. 29(3), pages 511-522, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lin, Hung-Tso & Lee, Hong-Tau & Pan, Wen-Jung, 2008. "Heuristics for scheduling in a no-wait open shop with movable dedicated machines," International Journal of Production Economics, Elsevier, vol. 111(2), pages 368-377, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shakhlevich, Natalia V. & Sotskov, Yuri N. & Werner, Frank, 2000. "Complexity of mixed shop scheduling problems: A survey," European Journal of Operational Research, Elsevier, vol. 120(2), pages 343-351, January.
    2. Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
    3. Timkovsky, Vadim G., 2003. "Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity," European Journal of Operational Research, Elsevier, vol. 149(2), pages 355-376, September.
    4. George Vairaktarakis & Sartaj Sahni, 1995. "Dual criteria preemptive open‐shop problems with minimum makespan," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(1), pages 103-121, February.
    5. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    6. Matta, Marie E. & Elmaghraby, Salah E., 2010. "Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop," European Journal of Operational Research, Elsevier, vol. 201(3), pages 720-728, March.
    7. Sündüz Dağ, 2013. "An Application On Flowshop Scheduling," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 1(1), pages 47-56, December.
    8. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    9. Vincent T’kindt & Federico Della Croce & Mathieu Liedloff, 2022. "Moderate exponential-time algorithms for scheduling problems," 4OR, Springer, vol. 20(4), pages 533-566, December.
    10. Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
    11. B-J Joo & Y-D Kim, 2009. "A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 572-582, April.
    12. Yagiura, Mutsunori & Ibaraki, Toshihide, 1996. "The use of dynamic programming in genetic algorithms for permutation problems," European Journal of Operational Research, Elsevier, vol. 92(2), pages 387-401, July.
    13. Scholl, Armin & Becker, Christian, 2005. "A note on "An exact method for cost-oriented assembly line balancing"," International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
    14. Scholl, Armin & Klein, Robert, 1999. "Balancing assembly lines effectively - A computational comparison," European Journal of Operational Research, Elsevier, vol. 114(1), pages 50-58, April.
    15. Bukchin, Yossi & Raviv, Tal, 2018. "Constraint programming for solving various assembly line balancing problems," Omega, Elsevier, vol. 78(C), pages 57-68.
    16. M Haouari & T Ladhari, 2003. "A branch-and-bound-based local search method for the flow shop problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1076-1084, October.
    17. Sen, Tapan & Sulek, Joanne M. & Dileepan, Parthasarati, 2003. "Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey," International Journal of Production Economics, Elsevier, vol. 83(1), pages 1-12, January.
    18. Bo Liu & Ling Wang & Ying Liu & Shouyang Wang, 2011. "A unified framework for population-based metaheuristics," Annals of Operations Research, Springer, vol. 186(1), pages 231-262, June.
    19. Gerardo Berbeglia & Gilles Pesant & Louis-Martin Rousseau, 2011. "Checking the Feasibility of Dial-a-Ride Instances Using Constraint Programming," Transportation Science, INFORMS, vol. 45(3), pages 399-412, August.
    20. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:162:y:2005:i:1:p:173-183. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.