A production-inventory model for a deteriorating item with trended demand and shortages
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Z T Balkhi, 2000. "On the optimal production stopping and restarting times for an EOQ model with deteriorating items," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(8), pages 999-1001, August.
- Willard I. Zangwill, 1966. "A Deterministic Multi-Period Production Scheduling Model with Backlogging," Management Science, INFORMS, vol. 13(1), pages 105-119, September.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Xu, Haiping & (Ben) Wang, Hsu-Pin, 1990. "An economic ordering policy model for deteriorating items with time proportional demand," European Journal of Operational Research, Elsevier, vol. 46(1), pages 21-27, May.
- Z T Balkhi & S K Goyal & B C Giri, 2001. "Some notes on the optimal production stopping and restarting times for an EOQ model with deteriorating items," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(11), pages 1300-1301, November.
- Paul J. Schweitzer & Abraham Seidmann, 1991. "Optimizing Processing Rates for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 37(4), pages 454-466, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
- Panda, D. & Kar, S. & Maity, K. & Maiti, M., 2008. "A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints," European Journal of Operational Research, Elsevier, vol. 188(1), pages 121-139, July.
- Taleizadeh, Ata Allah & Noori-daryan, Mahsa & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items," International Journal of Production Economics, Elsevier, vol. 159(C), pages 285-295.
- Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
- Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
- Md Sadikur Rahman & Subhajit Das & Amalesh Kumar Manna & Ali Akbar Shaikh & Asoke Kumar Bhunia & Leopoldo Eduardo Cárdenas-Barrón & Gerardo Treviño-Garza & Armando Céspedes-Mota, 2021. "A Mathematical Model of the Production Inventory Problem for Mixing Liquid Considering Preservation Facility," Mathematics, MDPI, vol. 9(24), pages 1-19, December.
- Yong He & Hongfu Huang & Dong Li, 2020. "Inventory and pricing decisions for a dual-channel supply chain with deteriorating products," Operational Research, Springer, vol. 20(3), pages 1461-1503, September.
- R. Uthayakumar & M. Rameswari, 2012. "An Economic Production Quantity Model for Defective Items with Trapezoidal type Demand Rate," Journal of Optimization Theory and Applications, Springer, vol. 154(3), pages 1055-1079, September.
- Rau, H. & OuYang, B.C., 2008. "An optimal batch size for integrated production-inventory policy in a supply chain," European Journal of Operational Research, Elsevier, vol. 185(2), pages 619-634, March.
- Udayan Chanda & Alok Kumar, 2019. "Optimization of EOQ Model for New Products Under Multi-Stage Adoption Process," International Journal of Innovation and Technology Management (IJITM), World Scientific Publishing Co. Pte. Ltd., vol. 16(02), pages 1-25, April.
- Manish Shukla & Sanjay Jharkharia, 2014. "An inventory model for continuously deteriorating agri-fresh produce: an artificial immune system-based solution approach," International Journal of Integrated Supply Management, Inderscience Enterprises Ltd, vol. 9(1/2), pages 110-135.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Liu, Tieming, 2008. "Economic lot sizing problem with inventory bounds," European Journal of Operational Research, Elsevier, vol. 185(1), pages 204-215, February.
- Hark‐Chin Hwang & Wilco van den Heuvel, 2012.
"Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging,"
Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(3‐4), pages 244-253, April.
- Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
- Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
- Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
- Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
- Esra Koca & Hande Yaman & M. Selim Aktürk, 2014. "Lot Sizing with Piecewise Concave Production Costs," INFORMS Journal on Computing, INFORMS, vol. 26(4), pages 767-779, November.
- Alper Atamtürk & Dorit S. Hochbaum, 2001. "Capacity Acquisition, Subcontracting, and Lot Sizing," Management Science, INFORMS, vol. 47(8), pages 1081-1100, August.
- Kian, Ramez & Gürler, Ülkü & Berk, Emre, 2014. "The dynamic lot-sizing problem with convex economic production costs and setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 361-379.
- Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
- Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Pentico, David W. & Drake, Matthew J., 2011. "A survey of deterministic models for the EOQ and EPQ with partial backordering," European Journal of Operational Research, Elsevier, vol. 214(2), pages 179-198, October.
- Minjiao Zhang & Simge Küçükyavuz & Saumya Goel, 2014. "A Branch-and-Cut Method for Dynamic Decision Making Under Joint Chance Constraints," Management Science, INFORMS, vol. 60(5), pages 1317-1333, May.
- Joaquín Sicilia & Luis San-José & Juan García-Laguna, 2012. "An inventory model where backordered demand ratio is exponentially decreasing with the waiting time," Annals of Operations Research, Springer, vol. 199(1), pages 137-155, October.
- Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
- Guglielmo Lulli & Suvrajeet Sen, 2004. "A Branch-and-Price Algorithm for Multistage Stochastic Integer Programming with Application to Stochastic Batch-Sizing Problems," Management Science, INFORMS, vol. 50(6), pages 786-796, June.
- Degraeve, Z. & Jans, R.F., 2003. "A New Dantzig-Wolfe Reformulation And Branch-And-Price Algorithm For The Capacitated Lot Sizing Problem With Set Up Times," ERIM Report Series Research in Management ERS-2003-010-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Goyal, S. K. & Giri, B. C., 2003. "The production-inventory problem of a product with time varying demand, production and deterioration rates," European Journal of Operational Research, Elsevier, vol. 147(3), pages 549-557, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:157:y:2004:i:2:p:357-371. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.