A contribution to the stochastic flow shop scheduling problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Herbert G. Campbell & Richard A. Dudek & Milton L. Smith, 1970. "A Heuristic Algorithm for the n Job, m Machine Sequencing Problem," Management Science, INFORMS, vol. 16(10), pages 630-637, June.
- Kamburowski, Jerzy, 2000. "On three-machine flow shops with random job processing times," European Journal of Operational Research, Elsevier, vol. 125(2), pages 440-448, September.
- Michael Pinedo, 1982. "Minimizing the Expected Makespan in Stochastic Flow Shops," Operations Research, INFORMS, vol. 30(1), pages 148-162, February.
- Kamburowski, Jerzy, 1999. "Stochastically minimizing the makespan in two-machine flow shops without blocking," European Journal of Operational Research, Elsevier, vol. 112(2), pages 304-309, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Gourgand, Michel & Grangeon, Nathalie & Norre, Sylvie, 2005. "Markovian analysis for performance evaluation and scheduling in m machine stochastic flow-shop with buffers of any capacity," European Journal of Operational Research, Elsevier, vol. 161(1), pages 126-147, February.
- Baker, Kenneth R. & Altheimer, Dominik, 2012. "Heuristic solution methods for the stochastic flow shop problem," European Journal of Operational Research, Elsevier, vol. 216(1), pages 172-177.
- Framinan, Jose M. & Perez-Gonzalez, Paz, 2015. "On heuristic solutions for the stochastic flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 246(2), pages 413-420.
- J Jackman & Z Guerra de Castillo & S Olafsson, 2011. "Stochastic flow shop scheduling model for the Panama Canal," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 69-80, January.
- Robert Cuckler & Kuo-Hao Chang & Liam Y. Hsieh, 2017. "Optimal Parallel Machine Allocation Problem in IC Packaging Using IC-PSO: An Empirical Study," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(06), pages 1-20, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- J Jackman & Z Guerra de Castillo & S Olafsson, 2011. "Stochastic flow shop scheduling model for the Panama Canal," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 69-80, January.
- P J Kalczynski & J Kamburowski, 2004. "Generalization of Johnson's and Talwar's scheduling rules in two-machine stochastic flow shops," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(12), pages 1358-1362, December.
- Gourgand, Michel & Grangeon, Nathalie & Norre, Sylvie, 2005. "Markovian analysis for performance evaluation and scheduling in m machine stochastic flow-shop with buffers of any capacity," European Journal of Operational Research, Elsevier, vol. 161(1), pages 126-147, February.
- Portougal, Victor & Trietsch, Dan, 2006. "Johnson's problem with stochastic processing times and optimal service level," European Journal of Operational Research, Elsevier, vol. 169(3), pages 751-760, March.
- Kamburowski, Jerzy, 2000. "On three-machine flow shops with random job processing times," European Journal of Operational Research, Elsevier, vol. 125(2), pages 440-448, September.
- Baker, Kenneth R. & Altheimer, Dominik, 2012. "Heuristic solution methods for the stochastic flow shop problem," European Journal of Operational Research, Elsevier, vol. 216(1), pages 172-177.
- Sündüz Dağ, 2013. "An Application On Flowshop Scheduling," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 1(1), pages 47-56, December.
- Solimanpur, M. & Vrat, Prem & Shankar, Ravi, 2004. "A heuristic to minimize makespan of cell scheduling problem," International Journal of Production Economics, Elsevier, vol. 88(3), pages 231-241, April.
- Gupta, Jatinder N.D. & Koulamas, Christos & Kyparisis, George J., 2006. "Performance guarantees for flowshop heuristics to minimize makespan," European Journal of Operational Research, Elsevier, vol. 169(3), pages 865-872, March.
- S.S. Panwalkar & Christos Koulamas, 2015. "Proportionate flow shop: New complexity results and models with due date assignment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(2), pages 98-106, March.
- Ozelkan, Ertunga C. & Duckstein, Lucien, 1999. "Optimal fuzzy counterparts of scheduling rules," European Journal of Operational Research, Elsevier, vol. 113(3), pages 593-609, March.
- Ho, Johnny C., 1995. "Flowshop sequencing with mean flowtime objective," European Journal of Operational Research, Elsevier, vol. 81(3), pages 571-578, March.
- Matin, Hossein N.Z. & Salmasi, Nasser & Shahvari, Omid, 2017. "Makespan minimization in flowshop batch processing problem with different batch compositions on machines," International Journal of Production Economics, Elsevier, vol. 193(C), pages 832-844.
- Ben-Daya, M. & Al-Fawzan, M., 1998. "A tabu search approach for the flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 109(1), pages 88-95, August.
- Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
- Peng-Yeng Yin & Hsin-Min Chen & Yi-Lung Cheng & Ying-Chieh Wei & Ya-Lin Huang & Rong-Fuh Day, 2021. "Minimizing the Makespan in Flowshop Scheduling for Sustainable Rubber Circular Manufacturing," Sustainability, MDPI, vol. 13(5), pages 1-18, February.
- Baptiste, Pierre, 2006. "Stochastic algorithms: Using the worst to reach the best," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 41-51, February.
- Hamed Hendizadeh, S. & Faramarzi, Hamidreza & Mansouri, S.Afshin & Gupta, Jatinder N.D. & Y ElMekkawy, Tarek, 2008. "Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 593-605, February.
- Asoo J. Vakharia & Yih‐Long Chang, 1990. "A simulated annealing approach to scheduling a manufacturing cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(4), pages 559-577, August.
- Suliman, S. M. A., 2000. "A two-phase heuristic approach to the permutation flow-shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 143-152, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:151:y:2003:i:2:p:415-433. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.