Review of properties of different precedence graphs for scheduling problems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- F. Brian Talbot & James H. Patterson, 1978. "An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems," Management Science, INFORMS, vol. 24(11), pages 1163-1174, July.
- Peter C. Fishburn, 1970. "Intransitive Indifference in Preference Theory: A Survey," Operations Research, INFORMS, vol. 18(2), pages 207-228, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Agnetis, Alessandro & Kellerer, Hans & Nicosia, Gaia & Pacifici, Andrea, 2012. "Parallel dedicated machines scheduling with chain precedence constraints," European Journal of Operational Research, Elsevier, vol. 221(2), pages 296-305.
- Gaia Nicosia & Andrea Pacifici, 2017. "Scheduling assembly tasks with caterpillar precedence constraints on dedicated machines," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1680-1691, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jan Böttcher & Andreas Drexl & Rainer Kolisch & Frank Salewski, 1999. "Project Scheduling Under Partially Renewable Resource Constraints," Management Science, INFORMS, vol. 45(4), pages 543-559, April.
- Marc Le Menestrel & Luk Van Wassenhove, 2001.
"The Domain and Interpretation of Utility Functions: An Exploration,"
Theory and Decision, Springer, vol. 51(2), pages 329-349, December.
- Marc Le Menestrel & Luk N. Van Wassenhove, 2001. "The domain and interpretation of utility functions: An exploration," Economics Working Papers 576, Department of Economics and Business, Universitat Pompeu Fabra.
- Gilboa, Itzhak & Lapson, Robert, 1995.
"Aggregation of Semiorders: Intransitive Indifference Makes a Difference,"
Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 5(1), pages 109-126, January.
- Itzhak Gilboa & Robert Lapson, 1990. "Aggregation of Semiorders: Intransitive Indifference Makes a Difference," Discussion Papers 870, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
- Itzhak Gilboa & Robert Lapson, 1995. "Aggregation of Semi-Orders: Intransitive Indifference Makes a Difference," Post-Print hal-00753141, HAL.
- M. Ali Khan & Metin Uyanık, 2021.
"Topological connectedness and behavioral assumptions on preferences: a two-way relationship,"
Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 71(2), pages 411-460, March.
- M. Ali Khan & Metin Uyan{i}k, 2018. "Topological Connectedness and Behavioral Assumptions on Preferences: A Two-Way Relationship," Papers 1810.02004, arXiv.org, revised Oct 2018.
- Kolisch, Rainer, 1994. "Serial and parallel resource-constrained projekt scheduling methodes revisited: Theory and computation," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 344, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Simpson, Wendell P. & Patterson, James H., 1996. "A multiple-tree search procedure for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 89(3), pages 525-542, March.
- Elias Bouacida, 2021. "Identifying Choice Correspondences," Working Papers 327800275, Lancaster University Management School, Economics Department.
- Ulrich Dorndorf & Erwin Pesch & Toàn Phan-Huy, 2000. "A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints," Management Science, INFORMS, vol. 46(10), pages 1365-1384, October.
- Klein, Robert & Scholl, Armin, 1999. "Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 112(2), pages 322-346, January.
- Kaushik Basu, 2007.
"Coercion, contract and the limits of the market,"
Social Choice and Welfare, Springer;The Society for Social Choice and Welfare, vol. 29(4), pages 559-579, December.
- Kaushik Basu, 2004. "Coercion, Contract and the Limits of the Market," Econometric Society 2004 Australasian Meetings 355, Econometric Society.
- Basu, Kaushik, 2006. "Coercion, Contract and the Limits of the Market," Working Papers 06-01, Cornell University, Center for Analytic Economics.
- Böttcher, Jan & Drexl, Andreas & Kolisch, Rainer & Salewski, Frank, 1996. "Project scheduling under partially renewable resource constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 398, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Nobuo Koida, 2021. "Intransitive indifference with direction-dependent sensitivity," KIER Working Papers 1061, Kyoto University, Institute of Economic Research.
- Szádoczki, Zsombor & Bozóki, Sándor & Tekile, Hailemariam Abebe, 2022. "Filling in pattern designs for incomplete pairwise comparison matrices: (Quasi-)regular graphs with minimal diameter," Omega, Elsevier, vol. 107(C).
- Buschena, David & Zilberman, David, 1992. "Not Just Another Paper Showing Violations of the Expected Utility Model: The Effects of Alternative Similarity on Risky Choice," CUDARE Working Papers 198603, University of California, Berkeley, Department of Agricultural and Resource Economics.
- Kolisch, Rainer, 1994. "Efficient priority rules for the resource-constrained project scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 350, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Buschena, David E. & Zilberman, David, 1992. "Similarity of Choices and the Performance of the Expected Utility Approach: Empirical Results," 1992 Quantifying Long Run Agricultural Risks and Evaluating Farmer Responses to Risk Meeting, March 22-25, 1992, Orlando, Florida 307868, Regional Research Projects > S-232: Quantifying Long Run Agricultural Risks and Evaluating Farmer Responses to Risk.
- Yew‐Kwang Ng, 1981. "Bentham or Nash? On the Acceptable Form of Social Welfare Functions," The Economic Record, The Economic Society of Australia, vol. 57(3), pages 238-250, September.
- Candeal, Juan Carlos & Indurain, Esteban & Zudaire, Margarita, 2002. "Numerical representability of semiorders," Mathematical Social Sciences, Elsevier, vol. 43(1), pages 61-77, January.
- Guo, Weikang & Vanhoucke, Mario & Coelho, José, 2023. "A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 579-595.
- Herroelen, Willy S. & Van Dommelen, Patrick & Demeulemeester, Erik L., 1997. "Project network models with discounted cash flows a guided tour through recent developments," European Journal of Operational Research, Elsevier, vol. 100(1), pages 97-121, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:142:y:2002:i:3:p:435-443. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.