IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v124y2000i3p495-510.html
   My bibliography  Save this article

Evaluation of supply chain structures through modularization and postponement

Author

Listed:
  • Ernst, Ricardo
  • Kamrad, Bardia

Abstract

No abstract is available for this item.

Suggested Citation

  • Ernst, Ricardo & Kamrad, Bardia, 2000. "Evaluation of supply chain structures through modularization and postponement," European Journal of Operational Research, Elsevier, vol. 124(3), pages 495-510, August.
  • Handle: RePEc:eee:ejores:v:124:y:2000:i:3:p:495-510
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00184-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hau L. Lee & Corey Billington & Brent Carter, 1993. "Hewlett-Packard Gains Control of Inventory and Service through Design for Localization," Interfaces, INFORMS, vol. 23(4), pages 1-11, August.
    2. Richard B. Chase, 1981. "The Customer Contact Approach to Services: Theoretical Bases and Practical Extensions," Operations Research, INFORMS, vol. 29(4), pages 698-706, August.
    3. Kenneth R. Baker & Michael J. Magazine & Henry L. W. Nuttle, 1986. "The Effect of Commonality on Safety Stock in a Simple Inventory Model," Management Science, INFORMS, vol. 32(8), pages 982-988, August.
    4. Zinn, Walter, 1990. "Should you assemble products before an order is received?," Business Horizons, Elsevier, vol. 33(2), pages 70-73.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    2. Tibben-Lembke, Ronald S. & Bassok, Yehuda, 2005. "An inventory model for delayed customization: A hybrid approach," European Journal of Operational Research, Elsevier, vol. 165(3), pages 748-764, September.
    3. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    4. Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
    5. S Kumar & D A Nottestad & E E Murphy, 2009. "Effects of product postponement on the distribution network: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 471-480, April.
    6. Lee, Loo Hay & Chew, Ek Peng & Manikam, Puvaneswari, 2006. "A general framework on the simulation-based optimization under fixed computing budget," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1828-1841, November.
    7. Gregory A. DeCroix & Jing-Sheng Song & Paul H. Zipkin, 2009. "Managing an Assemble-to-Order System with Returns," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 144-159, October.
    8. repec:tkp:ijsrsy:v:2:y:2012:i:2:p:73-91 is not listed on IDEAS
    9. Ryan W. Buell & Michael I. Norton, 2011. "The Labor Illusion: How Operational Transparency Increases Perceived Value," Management Science, INFORMS, vol. 57(9), pages 1564-1579, February.
    10. Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
    11. Yee, Rachel W.Y. & Guo, Yujuan & Yeung, Andy C.L., 2015. "Being close or being happy? The relative impact of work relationship and job satisfaction on service quality," International Journal of Production Economics, Elsevier, vol. 169(C), pages 391-400.
    12. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
    13. Gunasekaran, Angappa & Ngai, Eric W.T., 2009. "Modeling and analysis of build-to-order supply chains," European Journal of Operational Research, Elsevier, vol. 195(2), pages 319-334, June.
    14. Yossi Aviv & Awi Federgruen, 2001. "Design for Postponement: A Comprehensive Characterization of Its Benefits Under Unknown Demand Distributions," Operations Research, INFORMS, vol. 49(4), pages 578-598, August.
    15. Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
    16. Marzieh ShahmariChatghieh & Harri Haapasalo & Anyanitha Distanont, 2013. "A Comparison of R&D Supply Chains and Service and Manufacturing Supply Chains," International Journal of Synergy and Research, ToKnowPress, vol. 2(2), pages 73-91.
    17. Yalçın Akçay & Yunke Li & Harihara Prasad Natarajan, 2020. "Category Inventory Planning With Service Level Requirements and Dynamic Substitutions," Production and Operations Management, Production and Operations Management Society, vol. 29(11), pages 2553-2578, November.
    18. Krishnan S. Anand & Karan Girotra, 2007. "The Strategic Perils of Delayed Differentiation," Management Science, INFORMS, vol. 53(5), pages 697-712, May.
    19. Guillermo Gallego & Özalp Özer & Paul Zipkin, 2007. "Bounds, Heuristics, and Approximations for Distribution Systems," Operations Research, INFORMS, vol. 55(3), pages 503-517, June.
    20. Mabel C. Chou & Geoffrey A. Chua & Huan Zheng, 2014. "On the Performance of Sparse Process Structures in Partial Postponement Production Systems," Operations Research, INFORMS, vol. 62(2), pages 348-365, April.
    21. Susan E. Feinberg & Michael P. Keane, 2009. "Tariff effects on MNC decisions to engage in intra-firm and arm's-length trade," Canadian Journal of Economics, Canadian Economics Association, vol. 42(3), pages 900-929, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:124:y:2000:i:3:p:495-510. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.