IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v122y2000i3p534-560.html
   My bibliography  Save this article

Projections of the capacitated network loading problem

Author

Listed:
  • Mirchandani, Prakash

Abstract

No abstract is available for this item.

Suggested Citation

  • Mirchandani, Prakash, 2000. "Projections of the capacitated network loading problem," European Journal of Operational Research, Elsevier, vol. 122(3), pages 534-560, May.
  • Handle: RePEc:eee:ejores:v:122:y:2000:i:3:p:534-560
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00083-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. POCHET, Yves & WOLSEY, Laurence A., 1988. "Lot-size models with backlogging: strong reformulations and cutting planes," LIDAM Reprints CORE 791, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    2. Wolsey, L.A., 1988. "Uncapacitated lot-sizing problems with start-up costs," LIDAM Discussion Papers CORE 1988001, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    3. BARANY, Imre & VAN ROY, Tony J. & WOLSEY, Laurence A., 1984. "Strong formulations for multi-item capacitated lot sizing," LIDAM Reprints CORE 590, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    4. Thomas L. Magnanti & Prakash Mirchandani & Rita Vachani, 1995. "Modeling and Solving the Two-Facility Capacitated Network Loading Problem," Operations Research, INFORMS, vol. 43(1), pages 142-157, February.
    5. WOLSEY, Laurence A., 1989. "Strong formulations for mixed integer programming: a survey," LIDAM Reprints CORE 864, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    6. Imre Barany & Tony J. Van Roy & Laurence A. Wolsey, 1984. "Strong Formulations for Multi-Item Capacitated Lot Sizing," Management Science, INFORMS, vol. 30(10), pages 1255-1261, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hernández-Pérez, Hipólito & Salazar-González, Juan-José, 2009. "The multi-commodity one-to-one pickup-and-delivery traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 196(3), pages 987-995, August.
    2. J. F. Campbell & A. T. Ernst & M. Krishnamoorthy, 2005. "Hub Arc Location Problems: Part II---Formulations and Optimal Algorithms," Management Science, INFORMS, vol. 51(10), pages 1556-1571, October.
    3. F. Sibel Salman & R. Ravi & John N. Hooker, 2008. "Solving the Capacitated Local Access Network Design Problem," INFORMS Journal on Computing, INFORMS, vol. 20(2), pages 243-254, May.
    4. Ayşegül Altın & Hande Yaman & Mustafa Ç. Pınar, 2011. "The Robust Network Loading Problem Under Hose Demand Uncertainty: Formulation, Polyhedral Analysis, and Computations," INFORMS Journal on Computing, INFORMS, vol. 23(1), pages 75-89, February.
    5. Morten Riis & Kim Allan Andersen, 2002. "Capacitated Network Design with Uncertain Demand," INFORMS Journal on Computing, INFORMS, vol. 14(3), pages 247-260, August.
    6. Scheibe, Kevin P. & Ragsdale, Cliff T., 2009. "A model for the capacitated, hop-constrained, per-packet wireless mesh network design problem," European Journal of Operational Research, Elsevier, vol. 197(2), pages 773-784, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Manfred Padberg, 2005. "Classical Cuts for Mixed-Integer Programming and Branch-and-Cut," Annals of Operations Research, Springer, vol. 139(1), pages 321-352, October.
    2. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
    3. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    4. Kis, Tamás & Kovács, András, 2013. "Exact solution approaches for bilevel lot-sizing," European Journal of Operational Research, Elsevier, vol. 226(2), pages 237-245.
    5. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
    6. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
    7. AkartunalI, Kerem & Miller, Andrew J., 2009. "A heuristic approach for big bucket multi-level production planning problems," European Journal of Operational Research, Elsevier, vol. 193(2), pages 396-411, March.
    8. B Karimi & S M T Fatemi Ghomi & J M Wilson, 2006. "A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(2), pages 140-147, February.
    9. Absi, Nabil & Kedad-Sidhoum, Safia, 2008. "The multi-item capacitated lot-sizing problem with setup times and shortage costs," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1351-1374, March.
    10. Wei, Mingyuan & Qi, Mingyao & Wu, Tao & Zhang, Canrong, 2019. "Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials," European Journal of Operational Research, Elsevier, vol. 277(2), pages 521-541.
    11. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    12. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
    13. Yilmaz, Dogacan & Büyüktahtakın, İ. Esra, 2024. "An expandable machine learning-optimization framework to sequential decision-making," European Journal of Operational Research, Elsevier, vol. 314(1), pages 280-296.
    14. Haase, Knut, 1993. "Capacitated lot-sizing with linked production quantities of adjacent periods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 334, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Doostmohammadi, Mahdi & Akartunalı, Kerem, 2018. "Valid inequalities for two-period relaxations of big-bucket lot-sizing problems: Zero setup case," European Journal of Operational Research, Elsevier, vol. 267(1), pages 86-95.
    16. Bunn, Kevin A. & Ventura, José A., 2023. "A dynamic programming approach for the two-product capacitated lot-sizing problem with concave costs," European Journal of Operational Research, Elsevier, vol. 307(1), pages 116-129.
    17. Silvio Alexandre de Araujo & Bert De Reyck & Zeger Degraeve & Ioannis Fragkos & Raf Jans, 2015. "Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 431-448, August.
    18. Rizk, Nafee & Martel, Alain & Ramudhin, Amar, 2006. "A Lagrangean relaxation algorithm for multi-item lot-sizing problems with joint piecewise linear resource costs," International Journal of Production Economics, Elsevier, vol. 102(2), pages 344-357, August.
    19. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:122:y:2000:i:3:p:534-560. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.