A nonparametric exponentially weighted moving average signed-rank chart for monitoring location
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Chakraborti, S. & Eryilmaz, S. & Human, S.W., 2009. "A phase II nonparametric control chart based on precedence statistics with runs-type signaling rules," Computational Statistics & Data Analysis, Elsevier, vol. 53(4), pages 1054-1065, February.
- Knoth, Sven, 2006. "Computation of the ARL for CUSUM-S2 schemes," Computational Statistics & Data Analysis, Elsevier, vol. 51(2), pages 499-512, November.
- Huwang, Longcheen & Huang, Chun-Jung & Wang, Yi-Hua Tina, 2010. "New EWMA control charts for monitoring process dispersion," Computational Statistics & Data Analysis, Elsevier, vol. 54(10), pages 2328-2342, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lianjie Shu & Jinyu Fan, 2018. "A distribution‐free control chart for monitoring high‐dimensional processes based on interpoint distances," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(4), pages 317-330, June.
- Khanittha Talordphop & Yupaporn Areepong & Saowanit Sukparungsee, 2023. "Design and Analysis of Extended Exponentially Weighted Moving Average Signed-Rank Control Charts for Monitoring the Process Mean," Mathematics, MDPI, vol. 11(21), pages 1-15, October.
- Shu, Lei & Chen, Yu & Zhang, Weiping & Wang, Xueqin, 2022. "Spatial rank-based high-dimensional change point detection via random integration," Journal of Multivariate Analysis, Elsevier, vol. 189(C).
- Graham, M.A. & Mukherjee, A. & Chakraborti, S., 2012. "Distribution-free exponentially weighted moving average control charts for monitoring unknown location," Computational Statistics & Data Analysis, Elsevier, vol. 56(8), pages 2539-2561.
- Saber Ali & Zameer Abbas & Hafiz Zafar Nazir & Muhammad Riaz & Xingfa Zhang & Yuan Li, 2020. "On Designing Non-Parametric EWMA Sign Chart under Ranked Set Sampling Scheme with Application to Industrial Process," Mathematics, MDPI, vol. 8(9), pages 1-20, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Morais Manuel Cabral, 2016. "An ARL-Unbiased np-Chart," Stochastics and Quality Control, De Gruyter, vol. 31(1), pages 11-21, June.
- Muhammad Riaz & Saddam Akber Abbasi & Muhammad Abid & Abdulhammed K. Hamzat, 2020. "A New HWMA Dispersion Control Chart with an Application to Wind Farm Data," Mathematics, MDPI, vol. 8(12), pages 1-14, December.
- Huwang, Longcheen & Huang, Chun-Jung & Wang, Yi-Hua Tina, 2010. "New EWMA control charts for monitoring process dispersion," Computational Statistics & Data Analysis, Elsevier, vol. 54(10), pages 2328-2342, October.
- Verdier, Ghislain & Hilgert, Nadine & Vila, Jean-Pierre, 2008. "Adaptive threshold computation for CUSUM-type procedures in change detection and isolation problems," Computational Statistics & Data Analysis, Elsevier, vol. 52(9), pages 4161-4174, May.
- Nikolaos I. Panayiotou & Ioannis S. Triantafyllou, 2023. "A Class of Enhanced Nonparametric Control Schemes Based on Order Statistics and Runs," Stats, MDPI, vol. 6(1), pages 1-14, February.
- Guoyi Zhang, 2014. "Improved R and s control charts for monitoring the process variance," Journal of Applied Statistics, Taylor & Francis Journals, vol. 41(6), pages 1260-1273, June.
- Graham, M.A. & Mukherjee, A. & Chakraborti, S., 2012. "Distribution-free exponentially weighted moving average control charts for monitoring unknown location," Computational Statistics & Data Analysis, Elsevier, vol. 56(8), pages 2539-2561.
- Mu’azu Ramat Abujiya & Muhammad Riaz & Muhammad Hisyam Lee, 2015. "Enhanced Cumulative Sum Charts for Monitoring Process Dispersion," PLOS ONE, Public Library of Science, vol. 10(4), pages 1-22, April.
- Qiu, Peihua & Li, Zhonghua, 2011. "Distribution-free monitoring of univariate processes," Statistics & Probability Letters, Elsevier, vol. 81(12), pages 1833-1840.
- Human, S.W. & Chakraborti, S. & Smit, C.F., 2010. "Shewhart-type control charts for variation in phase I data analysis," Computational Statistics & Data Analysis, Elsevier, vol. 54(4), pages 863-874, April.
- repec:cte:wsrepe:23413 is not listed on IDEAS
- Luiz M A Lima-Filho & Tarciana Liberal Pereira & Tatiene C Souza & Fábio M Bayer, 2020. "Process monitoring using inflated beta regression control chart," PLOS ONE, Public Library of Science, vol. 15(7), pages 1-20, July.
- Jen-Hsiang Chen & Shin-Li Lu, 2022. "Economic-Statistical Performance of Auxiliary Information-Based Maximum EWMA Charts for Monitoring Manufacturing Processes," Mathematics, MDPI, vol. 10(13), pages 1-15, July.
- F.S. Makri & Z.M. Psillakis, 2017. "On Limited Length Binary Strings with an Application in Statistical Control," The Open Statistics and Probability Journal, Bentham Open, vol. 8(1), pages 1-6, February.
- Huang, Wenpo & Shu, Lianjie & Jiang, Wei, 2012. "Evaluation of exponentially weighted moving variance control chart subject to linear drifts," Computational Statistics & Data Analysis, Elsevier, vol. 56(12), pages 4278-4289.
- Sofia Paulino & Manuel Cabral Morais & Sven Knoth, 2019. "On ARL-unbiased c-charts for INAR(1) Poisson counts," Statistical Papers, Springer, vol. 60(4), pages 1021-1038, August.
- Saber Ali & Zameer Abbas & Hafiz Zafar Nazir & Muhammad Riaz & Xingfa Zhang & Yuan Li, 2020. "On Designing Non-Parametric EWMA Sign Chart under Ranked Set Sampling Scheme with Application to Industrial Process," Mathematics, MDPI, vol. 8(9), pages 1-20, September.
More about this item
Keywords
Contaminated normal Distribution-free Markov chain Median Outlier Quality control Robust Run-length Search Algorithm Simulation;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:csdana:v:55:y:2011:i:8:p:2490-2503. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/csda .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.