Author
Listed:
- Lidwine Spoormans
(Heritage & Architecture Section, Architectural Engineering + Technology Department, TU Delft, The Netherlands)
- Daniel Navas-Carrillo
(Heritage and Territorial Urban Development in Andalusia Research Group, Department of Urbanism and Regional Planning, University of Seville, Spain)
- Hielkje Zijlstra
(Heritage & Architecture Section, Architectural Engineering + Technology Department, TU Delft, The Netherlands)
- Teresa Pérez-Cano
(Heritage and Territorial Urban Development in Andalusia Research Group, Department of Urbanism and Regional Planning, University of Seville, Spain)
Abstract
This article seeks to analyse the reciprocal influence between the post-war urban planning policies and the development of residential neighbourhoods in Lelystad between 1965 and 1990. This city has been designed ‘from scratch’ as the urban centre of the IJsselmeer Polders, the largest land reclamation project of the Netherlands. Lelystad’s neighbourhood development will be described and contextualised in the Dutch New Towns planning policy (1960–1985), which intended to avoid increasing congestion in the most densely populated area in the Netherlands: the Randstad. Lelystad is seen as a significant case. This New Town exemplifies the evolution in urban planning in The Netherlands in the second half of the twentieth century. Cornelis van Eesteren, who had presided over the CIAM (Congrès Internationaux d’Architecture Moderne) from 1930 to 1947, was responsible for the urban design in 1964, based on the principles of the Modern city and the functionalist design of residential neighbourhoods. However, Van Eesteren was dismissed, and his plan was modified. The successive urban plans, elaborated by the IJsselmeer Polders Development Authority (a public body for the development of the polders), adopted a technical and practical approach, and later moved to functionally integrated neighbourhoods, based on more organic ‘Woonerf’ theories. The research investigates the relationship between the general and the particular by studying the socioeconomic and political context that conditioned the Dutch New Towns and the specific urban and architectural characteristics of a selection of residential ensembles in Lelystad’s neighbourhoods. Furthermore, the research seeks to illustrate the relevance and the influence of both urban planning policies and the effective design of residential configurations.
Suggested Citation
Lidwine Spoormans & Daniel Navas-Carrillo & Hielkje Zijlstra & Teresa Pérez-Cano, 2019.
"Planning History of a Dutch New Town: Analysing Lelystad through Its Residential Neighbourhoods,"
Urban Planning, Cogitatio Press, vol. 4(3), pages 102-116.
Handle:
RePEc:cog:urbpla:v4:y:2019:i:3:p:102-116
DOI: 10.17645/up.v4i3.2132
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cog:urbpla:v4:y:2019:i:3:p:102-116. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: António Vieira or IT Department (email available below). General contact details of provider: https://www.cogitatiopress.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.