IDEAS home Printed from https://ideas.repec.org/a/arp/tjssrr/2018p289-293.html
   My bibliography  Save this article

Client-Related Factor Contributing to Delay in the Malaysia Public Projects

Author

Listed:
  • Mohd Nasrun Mohd Nawi*

    (School of Technology Management and Logistics, College of Business, Universiti Utara Malaysia, 06010 Sintok, Kedah)

  • Najuwa Mohd Nasir

    (School of Technology Management and Logistics, College of Business, Universiti Utara Malaysia, 06010 Sintok, Kedah)

  • Mohd Suhaimi Mohd Danuri

    (Centre for Building, Construction & Tropical Architecture, Department of Quantity Surveying, Faculty of Built Environment, University of Malaya, Kuala Lumpur)

  • Othman Mohamed

    (Centre for Building, Construction & Tropical Architecture, Department of Quantity Surveying, Faculty of Built Environment, University of Malaya, Kuala Lumpur)

  • Saipol Bari Abdul Karim

    (Centre for Building, Construction & Tropical Architecture, Department of Quantity Surveying, Faculty of Built Environment, University of Malaya, Kuala Lumpur)

Abstract

This paper presents the investigation of client-related factor towards delay in public projects by applying qualitative research method approach. Semi-structured interview was conducted involving contractor, architect and consultant with experience in project delay. The investigation managed to discover factors of delay which were ranked by using content analysis. The most significant client-related factor is a poor planning at initial stage by client, followed by late of payment by client, lack of awareness by client on latest progress done by staff, improper consultant selection by client, client select contractor with a weak cash flow, poor attitude of contractor selected by client, late of payment by client, lack of knowledge by client, new proposal request by new hired officer and lack of financial strength. This finding is very useful for practitioners in construction sector and very important for practitioners to be aware on these factors and focus to improve the cause of delay among client.

Suggested Citation

  • Mohd Nasrun Mohd Nawi* & Najuwa Mohd Nasir & Mohd Suhaimi Mohd Danuri & Othman Mohamed & Saipol Bari Abdul Karim, 2018. "Client-Related Factor Contributing to Delay in the Malaysia Public Projects," The Journal of Social Sciences Research, Academic Research Publishing Group, pages 289-293:6.
  • Handle: RePEc:arp:tjssrr:2018:p:289-293
    as

    Download full text from publisher

    File URL: https://www.arpgweb.com/pdf-files/spi6.39.289.293.pdf
    Download Restriction: no

    File URL: https://www.arpgweb.com/journal/7/special_issue/12-2018/6/4
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Andreas Ekeskär & Martin Rudberg, 2016. "Third-party logistics in construction: the case of a large hospital project," Construction Management and Economics, Taylor & Francis Journals, vol. 34(3), pages 174-191, March.
    2. Dvir, Dov & Lechler, Thomas, 2004. "Plans are nothing, changing plans is everything: the impact of changes on project success," Research Policy, Elsevier, vol. 33(1), pages 1-15, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Muñoz, Félix-Fernando & Encinar, María-Isabel & Cañibano, Carolina, 2011. "On the role of intentionality in evolutionary economic change," Structural Change and Economic Dynamics, Elsevier, vol. 22(3), pages 193-203, September.
    2. Vicente Rodríguez Montequín & Joaquín Villanueva Balsera & Sonia María Cousillas Fernández & Francisco Ortega Fernández, 2018. "Exploring Project Complexity through Project Failure Factors: Analysis of Cluster Patterns Using Self-Organizing Maps," Complexity, Hindawi, vol. 2018, pages 1-17, May.
    3. Anna Fredriksson & Linnea Eriksson & Jonas Löwgren & Nina Lemon & Daniel Eriksson, 2022. "An Interactive Visualization Tool for Collaborative Construction Logistics Planning—Creating a Sustainable Project Vicinity," Sustainability, MDPI, vol. 14(24), pages 1-14, December.
    4. Miao Yu & Fangwei Zhu & Xiaotian Yang & Linzhuo Wang & Xiuxia Sun, 2018. "Integrating Sustainability into Construction Engineering Projects: Perspective of Sustainable Project Planning," Sustainability, MDPI, vol. 10(3), pages 1-17, March.
    5. Kuchta Dorota & Sukpen Joseph, 2013. "Culture and Project Management," Journal of Intercultural Management, Sciendo, vol. 5(3), pages 23-38, September.
    6. Muhammad Irfan & Sanam Zaib Khan & Nasruddin Hassan & Mazlan Hassan & Muhammad Habib & Salma Khan & Hadi Hassan Khan, 2021. "Role of Project Planning and Project Manager Competencies on Public Sector Project Success," Sustainability, MDPI, vol. 13(3), pages 1-19, January.
    7. Ahmet Anil Sezer & Anna Fredriksson, 2021. "Paving the Path towards Efficient Construction Logistics by Revealing the Current Practice and Issues," Logistics, MDPI, vol. 5(3), pages 1-15, August.
    8. Kamal Dhawan & John E. Tookey & Ali GhaffarianHoseini & Mani Poshdar, 2023. "Using Transport to Quantify the Impact of Vertical Integration on the Construction Supply Chain: A New Zealand Assessment," Sustainability, MDPI, vol. 15(2), pages 1-26, January.
    9. Hannen, Julian & Antons, David & Piller, Frank & Salge, Torsten Oliver & Coltman, Tim & Devinney, Timothy M., 2019. "Containing the Not-Invented-Here Syndrome in external knowledge absorption and open innovation: The role of indirect countermeasures," Research Policy, Elsevier, vol. 48(9), pages 1-1.
    10. Vaid, Shashank & Donthu, Naveen, 2023. "When injured product users may also stay satisfied: A macro-level analysis," Journal of Business Research, Elsevier, vol. 162(C).
    11. Verworn, Birgit, 2009. "A structural equation model of the impact of the "fuzzy front end" on the success of new product development," Research Policy, Elsevier, vol. 38(10), pages 1571-1581, December.
    12. Pedro Bruno de Souza & Jorge Carneiro & Rodrigo Bandeira-de-Mello, 2015. "Inquiry into the Conceptual Dimensions of Project Portfolio Management," Brazilian Business Review, Fucape Business School, vol. 0(2), pages 118-148, August.
    13. Christian Tabi Amponsah & Samuel Adams, 2017. "Open Innovation: Systematisation Of Knowledge Exploration And Exploitation For Commercialisation," International Journal of Innovation Management (ijim), World Scientific Publishing Co. Pte. Ltd., vol. 21(03), pages 1-26, April.
    14. Gil, Nuno & Tether, Bruce S., 2011. "Project risk management and design flexibility: Analysing a case and conditions of complementarity," Research Policy, Elsevier, vol. 40(3), pages 415-428, April.
    15. Vaquero Martín, María & Reinhardt, Ronny & Gurtner, Sebastian, 2021. "The dilemma of downstream market stakeholder involvement in NPD: Untangling the effects of involvement and capabilities on performance," Journal of Business Research, Elsevier, vol. 124(C), pages 136-151.
    16. Okamuro, Hiroyuki, 2007. "Determinants of successful R&D cooperation in Japanese small businesses: The impact of organizational and contractual characteristics," Research Policy, Elsevier, vol. 36(10), pages 1529-1544, December.
    17. Magnus Hellström & Kim Wikström & Kent Eriksson, 2021. "Sustainable Infrastructure Projects: Systemic versus Traditional Delivery Models," Sustainability, MDPI, vol. 13(11), pages 1-15, June.
    18. Bergmann, Rouven & Friedl, Gunther, 2008. "Controlling innovative projects with moral hazard and asymmetric information," Research Policy, Elsevier, vol. 37(9), pages 1504-1514, October.
    19. Ronald Klingebiel & Arnoud De Meyer, 2013. "Becoming Aware of the Unknown: Decision Making During the Implementation of a Strategic Initiative," Organization Science, INFORMS, vol. 24(1), pages 133-153, February.
    20. Verworn, Birgit & Herstatt, Cornelius & Nagahira, Akio, 2006. "The impact of the fuzzy front end on new product development success in Japanese NPD projects," Working Papers 39, Hamburg University of Technology (TUHH), Institute for Technology and Innovation Management.

    More about this item

    Keywords

    JEL Classification: L74; M11; N75;
    All these keywords.

    JEL classification:

    • L74 - Industrial Organization - - Industry Studies: Primary Products and Construction - - - Construction
    • M11 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Production Management
    • N75 - Economic History - - Economic History: Transport, International and Domestic Trade, Energy, and Other Services - - - Asia including Middle East

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arp:tjssrr:2018:p:289-293. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Managing Editor (email available below). General contact details of provider: http://arpgweb.com/?ic=journal&journal=7&info=aims .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.