IDEAS home Printed from https://ideas.repec.org/a/aea/aecrev/v106y2016i11p3238-74.html
   My bibliography  Save this article

Dynamic Procurement under Uncertainty: Optimal Design and Implications for Incomplete Contracts

Author

Listed:
  • Malin Arve
  • David Martimort

Abstract

We characterize the optimal dynamic contract for a long-term basic service when an uncertain add-on is required later on. Introducing firm risk aversion has two impacts. Profits for the basic service can be backloaded to induce cheaper information revelation for this service: an Income Effect which reduces output distortions. The firm must also bear some risk to induce information revelation for the add-on. This Risk Effect reduces the level of the add-on but hardens information revelation for the basic service. The interaction between these effects has important implications for the dynamics of distortions, contract renegotiation, and the value of incomplete contracts.

Suggested Citation

  • Malin Arve & David Martimort, 2016. "Dynamic Procurement under Uncertainty: Optimal Design and Implications for Incomplete Contracts," American Economic Review, American Economic Association, vol. 106(11), pages 3238-3274, November.
  • Handle: RePEc:aea:aecrev:v:106:y:2016:i:11:p:3238-74
    Note: DOI: 10.1257/aer.20150275
    as

    Download full text from publisher

    File URL: https://www.aeaweb.org/articles?id=10.1257/aer.20150275
    Download Restriction: no

    File URL: https://www.aeaweb.org/articles/attachments?retrieve=WktbZQIlTg1CkV12Zj5iafxoJ1YlMa1I
    Download Restriction: no

    File URL: https://www.aeaweb.org/articles/attachments?retrieve=YkspQ87CgIEiFmgBO0zS6Ytyzn28X_gd
    Download Restriction: Access to full text is restricted to AEA members and institutional subscribers.
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Strausz, Roland & Krähmer, Daniel, 2011. "The Benefits of Sequential Screening," CEPR Discussion Papers 8629, C.E.P.R. Discussion Papers.
    2. Bergemann, Dirk & Pavan, Alessandro, 2015. "Introduction to Symposium on Dynamic Contracts and Mechanism Design," Journal of Economic Theory, Elsevier, vol. 159(PB), pages 679-701.
    3. Armstrong, Mark & Porter, Robert, 2007. "Preface to the Handbook of Industrial Organization, Volume 3," Handbook of Industrial Organization, in: Mark Armstrong & Robert Porter (ed.), Handbook of Industrial Organization, edition 1, volume 3, chapter 0, pages 00, Elsevier.
    4. Strausz, Roland, 2006. "Deterministic versus stochastic mechanisms in principal-agent models," Journal of Economic Theory, Elsevier, vol. 128(1), pages 306-314, May.
    5. Iossa, Elisabetta & Martimort, David, 2016. "Corruption in PPPs, incentives and contract incompleteness," International Journal of Industrial Organization, Elsevier, vol. 44(C), pages 85-100.
    6. Aleix Calveras & Juan-Jose Ganuza & Esther Hauk, 2004. "Wild Bids. Gambling for Resurrection in Procurement Contracts," Journal of Regulatory Economics, Springer, vol. 26(1), pages 41-68, July.
    7. Arve, Malin, 2014. "Procurement and predation: Dynamic sourcing from financially constrained suppliers," Journal of Public Economics, Elsevier, vol. 120(C), pages 157-168.
    8. repec:hal:pseose:halshs-01328626 is not listed on IDEAS
    9. Charles N. Noussair & Stefan T. Trautmann & Gijs van de Kuilen, 2014. "Higher Order Risk Attitudes, Demographics, and Financial Decisions," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 81(1), pages 325-355.
    10. Zhang, Yuzhe, 2009. "Dynamic contracting with persistent shocks," Journal of Economic Theory, Elsevier, vol. 144(2), pages 635-675, March.
    11. Mark Armstrong & Robert Porter (ed.), 2007. "Handbook of Industrial Organization," Handbook of Industrial Organization, Elsevier, edition 1, volume 3, number 1.
    12. Schmitz, Patrick W., 2013. "Public procurement in times of crisis: The bundling decision reconsidered," Economics Letters, Elsevier, vol. 121(3), pages 533-536.
    13. Marek Kapicka, 2013. "Efficient Allocations in Dynamic Private Information Economies with Persistent Shocks: A First-Order Approach," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 80(3), pages 1027-1054.
    14. David Martimort & Wilfried Sand‐Zantman, 2006. "Signalling and the design of delegated management contracts for public utilities," RAND Journal of Economics, RAND Corporation, vol. 37(4), pages 763-782, December.
    15. Baron, David P. & Besanko, David, 1984. "Regulation and information in a continuing relationship," Information Economics and Policy, Elsevier, vol. 1(3), pages 267-302.
    16. Dirk Bergemann & Alessandro Pavan, 2015. "Introduction to JET Symposium Issue on "Dynamic Contracts and Mechanism Design"," Cowles Foundation Discussion Papers 2016, Cowles Foundation for Research in Economics, Yale University.
    17. Helmut Bester & Roland Strausz, "undated". "Imperfect Commitment and the Revelation Principle," Papers 004, Departmental Working Papers.
    18. Stéphane Auray & Thomas Mariotti & Fabien Moizeau, 2011. "Dynamic regulation of quality," RAND Journal of Economics, RAND Corporation, vol. 42(2), pages 246-265, June.
    19. Asanuma, Banri & Kikutani, Tatsuya, 1992. "Risk absorption in Japanese subcontracting: A microeconometric study of the automobile industry," Journal of the Japanese and International Economies, Elsevier, vol. 6(1), pages 1-29, March.
    20. Hayne E. Leland, 1968. "Saving and Uncertainty: The Precautionary Demand for Saving," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 82(3), pages 465-473.
    21. Bester, Helmut & Strausz, Roland, 2001. "Contracting with Imperfect Commitment and the Revelation Principle: The Single Agent Case," Econometrica, Econometric Society, vol. 69(4), pages 1077-1098, July.
    22. Townsend, Robert M, 1982. "Optimal Multiperiod Contracts and the Gain from Enduring Relationships under Private Information," Journal of Political Economy, University of Chicago Press, vol. 90(6), pages 1166-1186, December.
    23. Tracy R. Lewis & David E.M. Sappington, 1995. "Optimal Capital Structure in Agency Relationships," RAND Journal of Economics, The RAND Corporation, vol. 26(3), pages 343-361, Autumn.
    24. Armstrong, Mark & Sappington, David E.M., 2007. "Recent Developments in the Theory of Regulation," Handbook of Industrial Organization, in: Mark Armstrong & Robert Porter (ed.), Handbook of Industrial Organization, edition 1, volume 3, chapter 27, pages 1557-1700, Elsevier.
    25. Patrick Bajari & Stephanie Houghton & Steven Tadelis, 2014. "Bidding for Incomplete Contracts: An Empirical Analysis of Adaptation Costs," American Economic Review, American Economic Association, vol. 104(4), pages 1288-1319, April.
    26. Garrett, Daniel F. & Pavan, Alessandro, 2015. "Dynamic managerial compensation: A variational approach," Journal of Economic Theory, Elsevier, vol. 159(PB), pages 775-818.
    27. Roland Strausz, 2011. "Regulatory Risk Under Optimal Monopoly Regulation," Economic Journal, Royal Economic Society, vol. 121(553), pages 740-762, June.
    28. Thomas, Jonathan & Worrall, Tim, 1990. "Income fluctuation and asymmetric information: An example of a repeated principal-agent problem," Journal of Economic Theory, Elsevier, vol. 51(2), pages 367-390, August.
    29. Martimort, David & Pouyet, Jerome, 2008. "To build or not to build: Normative and positive theories of public-private partnerships," International Journal of Industrial Organization, Elsevier, vol. 26(2), pages 393-411, March.
    30. Yun, Mikyung, 1999. "Subcontracting relations in the Korean automotive industry: risk sharing and technological capability," International Journal of Industrial Organization, Elsevier, vol. 17(1), pages 81-108, January.
    31. Townsend, Robert M., 1979. "Optimal contracts and competitive markets with costly state verification," Journal of Economic Theory, Elsevier, vol. 21(2), pages 265-293, October.
    32. Mathias Dewatripont, 1988. "Commitment Through Renegotiation-Proof Contracts with Third Parties," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 55(3), pages 377-390.
    33. Oliver Hart, 2003. "Incomplete Contracts and Public Ownership: Remarks, and an Application to Public-Private Partnerships," Economic Journal, Royal Economic Society, vol. 113(486), pages 69-76, March.
    34. Kawasaki, Seiichi & McMillan, John, 1987. "The design of contracts: Evidence from Japanese subcontracting," Journal of the Japanese and International Economies, Elsevier, vol. 1(3), pages 327-349, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Marco Buso & Cesare Dosi & Michele Moretto, 2021. "Do exit options increase the value for money of public–private partnerships?," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 30(4), pages 721-742, November.
    2. Indranil Chakraborty & Fahad Khalil & Jacques Lawarree, 2021. "Competitive procurement with ex post moral hazard," RAND Journal of Economics, RAND Corporation, vol. 52(1), pages 179-206, March.
    3. Karakoç, Gülen & Pagnozzi, Marco & Piccolo, Salvatore, 2022. "The value of transparency in dynamic contracting with entry," International Journal of Industrial Organization, Elsevier, vol. 85(C).
    4. Di Maria, Corrado & Lange, Ian & Lazarova, Emiliya, 2018. "A look upstream: Market restructuring, risk, procurement contracts and efficiency," International Journal of Industrial Organization, Elsevier, vol. 57(C), pages 35-83.
    5. Marco Buso & Cesare Dosi & Michele Moretto, 2018. "Termination Fees and Contract Design in Public-Private Partnerships," Working Papers 2018.32, Fondazione Eni Enrico Mattei.
    6. Khalil, Fahad & Lawarree, Jacques & Rodivilov, Alexander, 2020. "Learning from failures: Optimal contracts for experimentation and production," Journal of Economic Theory, Elsevier, vol. 190(C).
    7. Dakshina G. De Silva & Timothy Dunne & Georgia Kosmopoulou & Carlos Lamarche, 2015. "Project modifications and bidding in highway procurement auctions," FRB Atlanta Working Paper 2015-14, Federal Reserve Bank of Atlanta.
    8. Arve, Malin & Honryo, Takakazu, 2015. "Delegation and Communication," Discussion Paper Series of SFB/TR 15 Governance and the Efficiency of Economic Systems 524, Free University of Berlin, Humboldt University of Berlin, University of Bonn, University of Mannheim, University of Munich.
    9. Krasikov, Ilia & Lamba, Rohit, 2021. "A theory of dynamic contracting with financial constraints," Journal of Economic Theory, Elsevier, vol. 193(C).
    10. Fiocco, Raffaele & Guo, Dongyu, 2020. "Regulatory risk, vertical integration, and upstream investment," European Economic Review, Elsevier, vol. 128(C).
    11. Shivam Gupta & Anupam Agrawal & Jennifer K. Ryan, 2023. "Agile contracting: Managing incentives under uncertain needs," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 972-988, March.
    12. Shenzhe Jiang & Junjie Xia & Jiajun Xu & Jianye Yan, 2023. "A theory of National Development Bank: long-term investment and the agency problem," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 76(3), pages 995-1024, October.
    13. Giuseppe Francesco Gori & Patrizia Lattarulo & Marco Mariani, 2021. "The Expediting Effect of Monitoring on Infrastructural Works. A Regression-Discontinuity Approach with Multiple Assignment Variables," Papers 2102.09625, arXiv.org.
    14. Rohit Lamba & Ilia Krasikov, 2017. "A Theory of Dynamic Contracting with Financial Constraints," 2017 Meeting Papers 1544, Society for Economic Dynamics.
    15. Martimort, David & Arve, Malin, 2023. "Auctioning Long-Term Projects under Financial Constraints," TSE Working Papers 23-1469, Toulouse School of Economics (TSE), revised May 2024.
    16. Chifeng Dai, 2021. "Optimal sequential contract with a risk‐averse supplier," Canadian Journal of Economics/Revue canadienne d'économique, John Wiley & Sons, vol. 54(1), pages 92-125, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chifeng Dai, 2021. "Optimal sequential contract with a risk‐averse supplier," Canadian Journal of Economics/Revue canadienne d'économique, John Wiley & Sons, vol. 54(1), pages 92-125, February.
    2. Fay, Marianne & Martimort, David & Straub, Stéphane, 2021. "Funding and financing infrastructure: The joint-use of public and private finance," Journal of Development Economics, Elsevier, vol. 150(C).
    3. Fiocco, Raffaele & Guo, Dongyu, 2020. "Regulatory risk, vertical integration, and upstream investment," European Economic Review, Elsevier, vol. 128(C).
    4. Elisabetta IOSSA & Stephane SAUSSIER, 2018. "Public Private Partnerships In Europe For Building And Managing Public Infrastructures: An Economic Perspective," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 89(1), pages 25-48, March.
    5. Indranil Chakraborty & Fahad Khalil & Jacques Lawarree, 2021. "Competitive procurement with ex post moral hazard," RAND Journal of Economics, RAND Corporation, vol. 52(1), pages 179-206, March.
    6. repec:bla:annpce:v:89:y:2018:i:1:p:25-48 is not listed on IDEAS
    7. Alexander Karaivanov & Fernando Martin, 2015. "Dynamic Optimal Insurance and Lack of Commitment," Review of Economic Dynamics, Elsevier for the Society for Economic Dynamics, vol. 18(2), pages 287-305, April.
    8. Arve, Malin, 2014. "Procurement and predation: Dynamic sourcing from financially constrained suppliers," Journal of Public Economics, Elsevier, vol. 120(C), pages 157-168.
    9. David Martimort & Jérôme Pouyet & Francesco Ricci, 2018. "Extracting information or resource? The Hotelling rule revisited under asymmetric information," RAND Journal of Economics, RAND Corporation, vol. 49(2), pages 311-347, June.
    10. Martimort, David & Arve, Malin, 2023. "Auctioning Long-Term Projects under Financial Constraints," TSE Working Papers 23-1469, Toulouse School of Economics (TSE), revised May 2024.
    11. Dirk Bergemann & Juuso Välimäki, 2019. "Dynamic Mechanism Design: An Introduction," Journal of Economic Literature, American Economic Association, vol. 57(2), pages 235-274, June.
    12. Krasikov, Ilia & Lamba, Rohit, 2021. "A theory of dynamic contracting with financial constraints," Journal of Economic Theory, Elsevier, vol. 193(C).
    13. Fiocco, Raffaele & Strausz, Roland, 2012. "Consumer standards as a strategic device to mitigate ratchet effects in dynamic regulation," SFB 649 Discussion Papers 2012-055, Humboldt University Berlin, Collaborative Research Center 649: Economic Risk.
    14. Golosov, M. & Tsyvinski, A. & Werquin, N., 2016. "Recursive Contracts and Endogenously Incomplete Markets," Handbook of Macroeconomics, in: J. B. Taylor & Harald Uhlig (ed.), Handbook of Macroeconomics, edition 1, volume 2, chapter 0, pages 725-841, Elsevier.
    15. Raffaele Fiocco & Roland Strausz, 2015. "Consumer Standards as a Strategic Device to Mitigate Ratchet Effects in Dynamic Regulation," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 24(3), pages 550-569, September.
    16. Bergemann, Dirk & Pavan, Alessandro, 2015. "Introduction to Symposium on Dynamic Contracts and Mechanism Design," Journal of Economic Theory, Elsevier, vol. 159(PB), pages 679-701.
    17. Daniel Danau & Annalisa Vinella, 2012. "Optimal contract with private information on cost expectation and variability," Economics Working Paper Archive (University of Rennes & University of Caen) 201228, Center for Research in Economics and Management (CREM), University of Rennes, University of Caen and CNRS.
    18. Battaglini, Marco & Lamba, Rohit, 2019. "Optimal dynamic contracting: the first-order approach and beyond," Theoretical Economics, Econometric Society, vol. 14(4), November.
    19. Rohit Lamba & Ilia Krasikov, 2017. "A Theory of Dynamic Contracting with Financial Constraints," 2017 Meeting Papers 1544, Society for Economic Dynamics.
    20. Noah Williams, 2011. "Persistent Private Information," Econometrica, Econometric Society, vol. 79(4), pages 1233-1275, July.
    21. Elisabetta Iossa & David Martimort, 2012. "Risk allocation and the costs and benefits of public--private partnerships," RAND Journal of Economics, RAND Corporation, vol. 43(3), pages 442-474, September.

    More about this item

    JEL classification:

    • D21 - Microeconomics - - Production and Organizations - - - Firm Behavior: Theory
    • D81 - Microeconomics - - Information, Knowledge, and Uncertainty - - - Criteria for Decision-Making under Risk and Uncertainty
    • D82 - Microeconomics - - Information, Knowledge, and Uncertainty - - - Asymmetric and Private Information; Mechanism Design
    • D86 - Microeconomics - - Information, Knowledge, and Uncertainty - - - Economics of Contract Law
    • G32 - Financial Economics - - Corporate Finance and Governance - - - Financing Policy; Financial Risk and Risk Management; Capital and Ownership Structure; Value of Firms; Goodwill

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:aea:aecrev:v:106:y:2016:i:11:p:3238-74. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Michael P. Albert (email available below). General contact details of provider: https://edirc.repec.org/data/aeaaaea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.