Contact information of Koc University
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:fth:kocuni. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Thomas Krichel (email available below). General contact details of provider: https://edirc.repec.org/data/dekoctr.html .
Content
1999
1998
1997
- 1997/28 Wage Formation in the Construction Sector in Egypt
by Assaad, R. & Tunali, I.
- 1997/24 Estimates of the Returns to Scale for US Manufacturing
by Altug, S. & Filiztekin, A.
- 1997/22 Stochastic Cyclic Scheduling Problem in Synchronous Assembly and Production Lines
by Tan, B. & Karabati, S.
- 1997/19 Variance of the Output as a Function of Time: Production Line Dynamics
by Tan, B.
- 1997/18 A Prioritized Re-Insertion Approach to Production Rescheduling
by Akkan, C.
- 1997/17 Stratified Partial Likelihood Estimation
by Ridder, G. & Tunali, I.
- 1997/16 Cyclic Scheduling in Synchronous Production Lines
by Kouvelis, P. & Karabati, S.
- 1997/12 A Quantitative Analysis of Capital Income Taxation
by Imrohoroglu, S.
- 1997/07 Machinery Investment and Export Competitiveness
by Mody, A. & Yilmaz, K.
- 1997/04 Performance Evaluation of a production Line with Random Processing Times Under Cyclical Scheduling
by Tan, B. & Karabati, S.
- 1997/02 An Analytical Formula for Variance of Output from a Series-Parallel Production System with no Interstations Buffers and Time-Dependent Failures
by Tan, B.