IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v36y1990i12p1579-1592.html
   My bibliography  Save this item

Scheduling the Production of Several Items with Random Demands in a Single Facility

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Smits, Sanne R. & Wagner, Michael & G. de Kok, Ton, 2004. "Determination of an order-up-to policy in the stochastic economic lot scheduling model," International Journal of Production Economics, Elsevier, vol. 90(3), pages 377-389, August.
  2. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
  3. Jingchen Wu & Xiuli Chao, 2014. "Optimal Control of a Brownian Production/Inventory System with Average Cost Criterion," Mathematics of Operations Research, INFORMS, vol. 39(1), pages 163-189, February.
  4. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
  5. Chen Shaoxiang, 2004. "The Optimality of Hedging Point Policies for Stochastic Two-Product Flexible Manufacturing Systems," Operations Research, INFORMS, vol. 52(2), pages 312-322, April.
  6. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
  7. Antonio Arreola‐Risa & Gregory A. DeCroix, 1998. "Inventory management under random supply disruptions and partial backorders," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(7), pages 687-703, October.
  8. Segerstedt, Anders, 1999. "Lot sizes in a capacity constrained facility with available initial inventories," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 469-475, March.
  9. Scott Carr & Izak Duenyas, 2000. "Optimal Admission Control and Sequencing in a Make-to-Stock/Make-to-Order Production System," Operations Research, INFORMS, vol. 48(5), pages 709-720, October.
  10. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
  11. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
  12. A. Karakitsiou & A. Migdalas, 2016. "Convex optimization problems in supply chain planning and their solution by a column generation method based on the Frank Wolfe method," Operational Research, Springer, vol. 16(3), pages 401-421, October.
  13. Kelle, Peter & Peak, David, 1996. "A comparison of fixed and adaptive type controls for multi-product processing," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 139-146, August.
  14. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
  15. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
  16. Fransoo, Jan C. & Sridharan, V. & Bertrand, J.Will M., 1995. "A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands," European Journal of Operational Research, Elsevier, vol. 86(1), pages 57-72, October.
  17. McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
  18. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
  19. Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
  20. Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
  21. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
  22. Guillermo Gallego, 1994. "When is a base stock policy optimal in recovering disrupted cyclic schedules?," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 317-333, April.
  23. Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
  24. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
  25. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
  26. David M. Markowitz & Martin I. Reiman & Lawrence M. Wein, 2000. "The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies," Operations Research, INFORMS, vol. 48(1), pages 136-154, February.
  27. Donald D. Eisenstein, 2005. "Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies," Operations Research, INFORMS, vol. 53(4), pages 675-688, August.
  28. Dirk Briskorn & Philipp Zeise, 2019. "A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 895-942, December.
  29. Shuangchi He & Dacheng Yao & Hanqin Zhang, 2017. "Optimal Ordering Policy for Inventory Systems with Quantity-Dependent Setup Costs," Mathematics of Operations Research, INFORMS, vol. 42(4), pages 979-1006, November.
  30. Sridhar Tayur, 2000. "Improving Operations and Quoting Accurate Lead Times in a Laminate Plant," Interfaces, INFORMS, vol. 30(5), pages 1-15, October.
  31. Brander, Par & Leven, Erik & Segerstedt, Anders, 2005. "Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand," International Journal of Production Economics, Elsevier, vol. 93(1), pages 375-386, January.
  32. E J Lodree Jr & S Taskin, 2008. "An insurance risk management framework for disaster relief and supply chain disruption inventory planning," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(5), pages 674-684, May.
  33. Weber, Thomas A. & Nguyen, Viet Anh, 2018. "A linear-quadratic Gaussian approach to dynamic information acquisition," European Journal of Operational Research, Elsevier, vol. 270(1), pages 260-281.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.