IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v79y1994i2p220-229.html
   My bibliography  Save this item

DSS for multiobjective project scheduling

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. De Reyck, Bert & Herroelen, Willy, 1999. "The multi-mode resource-constrained project scheduling problem with generalized precedence relations," European Journal of Operational Research, Elsevier, vol. 119(2), pages 538-556, December.
  2. Kolisch, R. & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Omega, Elsevier, vol. 29(3), pages 249-272, June.
  3. Drexl, Andreas & Kolisch, Rainer & Sprecher, Arno, 1995. "Neuere Entwicklungen in der computergestützten Projektplanung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 379, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  4. Hapke, Maciej & Jaszkiewicz, Andrzej & Slowinski, Roman, 1998. "Interactive analysis of multiple-criteria project scheduling problems," European Journal of Operational Research, Elsevier, vol. 107(2), pages 315-324, June.
  5. Alfredo S. Ramos & Pablo A. Miranda-Gonzalez & Samuel Nucamendi-Guillén & Elias Olivares-Benitez, 2023. "A Formulation for the Stochastic Multi-Mode Resource-Constrained Project Scheduling Problem Solved with a Multi-Start Iterated Local Search Metaheuristic," Mathematics, MDPI, vol. 11(2), pages 1-25, January.
  6. Pinto, F.S. & Figueira, J.R. & Marques, R.C., 2015. "A multi-objective approach with soft constraints for water supply and wastewater coverage improvements," European Journal of Operational Research, Elsevier, vol. 246(2), pages 609-618.
  7. Frank Schultmann & Otto Rentz, 2002. "Scheduling of deconstruction projects under resource constraints," Construction Management and Economics, Taylor & Francis Journals, vol. 20(5), pages 391-401.
  8. Drexl, Andreas & Nikulin, Yuri, 2005. "Multicriteria time window-constrained project scheduling with applications to airport gate assignment. Part I: Methodology," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 595, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  9. KIlIç, Murat & Ulusoy, Gündüz & Serifoglu, Funda Sivrikaya, 2008. "A bi-objective genetic algorithm approach to risk mitigation in project scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 202-216, March.
  10. Moukrim, Aziz & Quilliot, Alain & Toussaint, Hélène, 2015. "An effective branch-and-price algorithm for the Preemptive Resource Constrained Project Scheduling Problem based on minimal Interval Order Enumeration," European Journal of Operational Research, Elsevier, vol. 244(2), pages 360-368.
  11. Van Peteghem, Vincent & Vanhoucke, Mario, 2014. "An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances," European Journal of Operational Research, Elsevier, vol. 235(1), pages 62-72.
  12. Sprecher, Arno, 1996. "Solving the RCPSP efficiently at modest memory requirements," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 425, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  13. Lova, Antonio & Tormos, Pilar & Cervantes, Mariamar & Barber, Federico, 2009. "An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes," International Journal of Production Economics, Elsevier, vol. 117(2), pages 302-316, February.
  14. Alireza Etminaniesfahani & Hanyu Gu & Leila Moslemi Naeni & Amir Salehipour, 2024. "An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem," Annals of Operations Research, Springer, vol. 338(1), pages 41-68, July.
  15. Sprecher, Arno & Drexl, Andreas, 1996. "Solving Multi-Mode Resource-Constrained Project Scheduling Problems by a Simple, General and Powerful Sequeacing Algorithm. Part I: Theory," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 385, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  16. Elloumi, Sonda & Fortemps, Philippe, 2010. "A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 31-41, August.
  17. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
  18. V. Van Peteghem & M. Vanhoucke, 2009. "An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 09/555, Ghent University, Faculty of Economics and Business Administration.
  19. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
  20. Peteghem, Vincent Van & Vanhoucke, Mario, 2010. "A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 201(2), pages 409-418, March.
  21. Heilmann, Roland, 2003. "A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags," European Journal of Operational Research, Elsevier, vol. 144(2), pages 348-365, January.
  22. V. Van Peteghem & M. Vanhoucke, 2008. "A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 08/494, Ghent University, Faculty of Economics and Business Administration.
  23. Drexl, Andreas & Kolisch, Rainer & Salewski, Frank, 1998. "Projektmanagement bei flexiblen Arbeitszeiten," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 494, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  24. Konstantinidis, Peter D., 1998. "A model to optimize project resource allocation by construction of a balanced histogram," European Journal of Operational Research, Elsevier, vol. 104(3), pages 559-571, February.
  25. He, Zhengwen & Liu, Renjing & Jia, Tao, 2012. "Metaheuristics for multi-mode capital-constrained project payment scheduling," European Journal of Operational Research, Elsevier, vol. 223(3), pages 605-613.
  26. Hartmann, Sönke, 1997. "Project scheduling with multiple modes: A genetic algorithm," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 435, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  27. Bert De Reyck & Erik Demeulemeester & Willy Herroelen, 1998. "Local search methods for the discrete time/resource trade‐off problem in project networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(6), pages 553-578, September.
  28. J Alcaraz & C Maroto & R Ruiz, 2003. "Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(6), pages 614-626, June.
  29. Drexl, Andreas & Kolisch, Rainer & Sprecher, Arno, 1997. "Koordination und Integration im Projektmanagement - Aufgaben und Instrumente," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 443, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  30. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.
  31. Xiao, Jing & Wu, Zhou & Hong, Xi-Xi & Tang, Jian-Chao & Tang, Yong, 2016. "Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP," European Journal of Operational Research, Elsevier, vol. 251(1), pages 22-35.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.