My bibliography
Save this item
Machine scheduling with job delivery coordination
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhong, Weiya & Dosa, Gyorgy & Tan, Zhiyi, 2007. "On the machine scheduling problem with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1057-1072, November.
- Diego Cattaruzza & Nabil Absi & Dominique Feillet, 2018. "Vehicle routing problems with multiple trips," Annals of Operations Research, Springer, vol. 271(1), pages 127-159, December.
- Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
- Söhnke Maecker & Liji Shen, 2020. "Solving parallel machine problems with delivery times and tardiness objectives," Annals of Operations Research, Springer, vol. 285(1), pages 315-334, February.
- Iman Dayarian & Guy Desaulniers, 2019. "A Branch-Price-and-Cut Algorithm for a Production-Routing Problem with Short-Life-Span Products," Transportation Science, INFORMS, vol. 53(3), pages 829-849, May.
- Liu, Peihai & Lu, Xiwen, 2016. "Integrated production and job delivery scheduling with an availability constraint," International Journal of Production Economics, Elsevier, vol. 176(C), pages 1-6.
- Guo, Zhaoxia & Shi, Leyuan & Chen, Longchao & Liang, Yong, 2017. "A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing," Omega, Elsevier, vol. 66(PB), pages 327-343.
- Wan, Long & Zhang, An, 2014. "Coordinated scheduling on parallel machines with batch delivery," International Journal of Production Economics, Elsevier, vol. 150(C), pages 199-203.
- Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
- Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
- Verena Schmid & Karl F. Doerner, 2014. "Examination and Operating Room Scheduling Including Optimization of Intrahospital Routing," Transportation Science, INFORMS, vol. 48(1), pages 59-77, February.
- Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
- Wang, Yu & Ropke, Stefan & Wen, Min & Bergh, Simon, 2023. "The mobile production vehicle routing problem: Using 3D printing in last mile distribution," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1407-1423.
- Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
- Diego Cattaruzza & Nabil Absi & Dominique Feillet, 2016. "Vehicle routing problems with multiple trips," 4OR, Springer, vol. 14(3), pages 223-259, September.
- Han, Shuihua & Zhao, Ling & Chen, Kui & Luo, Zong-wei & Mishra, Deepa, 2017. "Appointment scheduling and routing optimization of attended home delivery system with random customer behavior," European Journal of Operational Research, Elsevier, vol. 262(3), pages 966-980.
- Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 0. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$P2→D|v=1,c=1|Cmax," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-12.
- Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.
- Chung‐Lun Li & Jinwen Ou, 2005. "Machine scheduling with pickup and delivery," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(7), pages 617-630, October.
- Wang, Gang & Lei, Lei, 2012. "Polynomial-time solvable cases of the capacitated multi-echelon shipping network scheduling problem with delivery deadlines," International Journal of Production Economics, Elsevier, vol. 137(2), pages 263-271.
- Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
- Srikant Gupta & Irfan Ali & Aquil Ahmed, 2018. "Multi-objective bi-level supply chain network order allocation problem under fuzziness," OPSEARCH, Springer;Operational Research Society of India, vol. 55(3), pages 721-748, November.
- Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
- Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2018. "Single machine scheduling with job delivery to multiple customers," Journal of Scheduling, Springer, vol. 21(3), pages 337-348, June.
- Wang, Xiuli & Cheng, T.C.E., 2009. "Logistics scheduling to minimize inventory and transport costs," International Journal of Production Economics, Elsevier, vol. 121(1), pages 266-273, September.
- Low, Chinyao & Chang, Chien-Min & Li, Rong-Kwei & Huang, Chia-Ling, 2014. "Coordination of production scheduling and delivery problems with heterogeneous fleet," International Journal of Production Economics, Elsevier, vol. 153(C), pages 139-148.
- Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2016. "An improved two-machine flowshop scheduling with intermediate transportation," Journal of Combinatorial Optimization, Springer, vol. 31(3), pages 1316-1334, April.
- Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
- Xiuli Wang & T. C. Edwin Cheng, 2007. "Machine scheduling with an availability constraint and job delivery coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 11-20, February.
- Lixin Tang & Feng Li & Jiyin Liu, 2015. "Integrated scheduling of loading and transportation with tractors and semitrailers separated," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 416-433, August.
- Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
- Benjamin C. Shelbourne & Maria Battarra & Chris N. Potts, 2017. "The Vehicle Routing Problem with Release and Due Dates," INFORMS Journal on Computing, INFORMS, vol. 29(4), pages 705-723, November.
- Hua Gong & Lixin Tang & Joseph Y.T. Leung, 2016. "Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(6), pages 492-502, September.
- Qi, Xiangtong, 2011. "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Elsevier, vol. 129(1), pages 43-50, January.
- Deyun Wang & Olivier Grunder & Abdellah EL Moudni, 2014. "Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(8), pages 1694-1707, August.
- Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 2022. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$ P 2 → D | v = 1 , c = 1 | C max," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2195-2206, November.