An improved two-machine flowshop scheduling with intermediate transportation
Author
Abstract
Suggested Citation
DOI: 10.1007/s10878-014-9825-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Zhong, Weiya & Dosa, Gyorgy & Tan, Zhiyi, 2007. "On the machine scheduling problem with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1057-1072, November.
- Bayi Cheng & Shanlin Yang & Xiaoxuan Hu & Kai Li, 2014. "Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(3), pages 571-578.
- Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
- Cheng, T. C. Edwin & Gordon, Valery S. & Kovalyov, Mikhail Y., 1996. "Single machine scheduling with batch deliveries," European Journal of Operational Research, Elsevier, vol. 94(2), pages 277-283, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
- Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
- Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
- Wan, Long & Zhang, An, 2014. "Coordinated scheduling on parallel machines with batch delivery," International Journal of Production Economics, Elsevier, vol. 150(C), pages 199-203.
- Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
- Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
- Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.
- Low, Chinyao & Chang, Chien-Min & Li, Rong-Kwei & Huang, Chia-Ling, 2014. "Coordination of production scheduling and delivery problems with heterogeneous fleet," International Journal of Production Economics, Elsevier, vol. 153(C), pages 139-148.
- Liu, Peihai & Lu, Xiwen, 2016. "Integrated production and job delivery scheduling with an availability constraint," International Journal of Production Economics, Elsevier, vol. 176(C), pages 1-6.
- Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2018. "Single machine scheduling with job delivery to multiple customers," Journal of Scheduling, Springer, vol. 21(3), pages 337-348, June.
- Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
- Söhnke Maecker & Liji Shen, 2020. "Solving parallel machine problems with delivery times and tardiness objectives," Annals of Operations Research, Springer, vol. 285(1), pages 315-334, February.
- Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 0. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$P2→D|v=1,c=1|Cmax," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-12.
- Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
- Guo, Zhaoxia & Shi, Leyuan & Chen, Longchao & Liang, Yong, 2017. "A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing," Omega, Elsevier, vol. 66(PB), pages 327-343.
- Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 2022. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$ P 2 → D | v = 1 , c = 1 | C max," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2195-2206, November.
- Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
- Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
- Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
- Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.
More about this item
Keywords
Flowshop scheduling; Bin-packing; Approximation algorithm; Worst-case performance analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:31:y:2016:i:3:d:10.1007_s10878-014-9825-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.