Ongoing pressure on prices for construction projects adds to the significance of cost estimation accuracy in building construction. Due to competition from Asian entrants, main contractors in the plant engineering industry are starting to face a similar situation. In the present paper, the cost estimation standards for Major Industrial Plant Projects (MIPP) are analyzed and compared with the cost estimation standards for Building Construction (BC). The research method uses a literature and standards review, comparing MIPP cost estimation guidelines by the Association for the Advancement of Cost Engineering (AACE) with a guideline known as the 'cone of cost' following the Official Scale of Fees for Services by Architects and Engineers (German: HOAI) for comparable phases of performance. It is shown that MIPP industry cost estimation guidelines are much more tolerant in terms of accuracy than for Building Construction in Germany, especially in the early phases. With the help of examples (Hot-Briquetted-Iron plant projects versus residential housing projects), a set of possible reasons is identified and categorized by (1) competition intensity incl. technology impact and frequency of project occurrence, (2) demands on cost estimation professionals, (3) materials and supplies used, (4) duration of project execution, (5) Certainty of projected Cash Flows. Finally, the study marks starting points for further research: First, comparing MIPP cost estimation guidelines to non-German Building Construction standards, and second empirically validating and possibly extending the set of explanations.

Suggested Citation

  • Erbe, Anita, 2014. "Cost estimate classification and accuracy for Major Industrial Plant Projects (MIPP) versus building construction in Germany," Freiberg Working Papers 2014/01, TU Bergakademie Freiberg, Faculty of Economics and Business Administration.
  • Handle: RePEc:zbw:tufwps:201401
    as

    Download full text from publisher

    File URL: https://www.econstor.eu/bitstream/10419/106158/1/815343892.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Erbe, Anita, 2013. "Evaluating main order contract forms for Major Industrial Plant Projects (MIPP) with respect to completion and performance of design risk allocation," Freiberg Working Papers 2013/03, TU Bergakademie Freiberg, Faculty of Economics and Business Administration.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.

      More about this item

      Keywords

      major industrial plant projects; building construction; cost estimation; Großanlagenbau; Hochbau; Kalkulation;
      All these keywords.

      JEL classification:

      • F21 - International Economics - - International Factor Movements and International Business - - - International Investment; Long-Term Capital Movements
      • G31 - Financial Economics - - Corporate Finance and Governance - - - Capital Budgeting; Fixed Investment and Inventory Studies
      • L74 - Industrial Organization - - Industry Studies: Primary Products and Construction - - - Construction
      • L60 - Industrial Organization - - Industry Studies: Manufacturing - - - General
      • L70 - Industrial Organization - - Industry Studies: Primary Products and Construction - - - General
      • Y80 - Miscellaneous Categories - - Related Disciplines - - - Related Disciplines

      NEP fields

      This paper has been announced in the following NEP Reports:

      Statistics

      Access and download statistics

      Corrections

      All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:tufwps:201401. See general information about how to correct material in RePEc.

      If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

      If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

      If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

      For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://edirc.repec.org/data/fwfrede.html .

      Please note that corrections may take a couple of weeks to filter through the various RePEc services.

      IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.