Abstract
Geothermal plants have been increasingly constructed in recent years to exploit the high geothermal energy potential in Germany in district heating networks at the municipal level. In order to use this potential economically, municipal planners need instruments for designing the district heating network to supply households with the geothermal heat. This paper presents a combinatorial mixed-integer linear optimisation model and a three-stage heuristic to determine the minimum costs for geothermal district heating systems in municipalities. The central innovations are the ability to optimise both the structure of the district heating network and the location of the district heating plant, the consideration of partial heat supply from district heating and the scalability to many larger municipalities. A comparison of optimisation and heuristic for three exemplary municipalities demonstrates the efficiency of the developed heuristic: the optimisation takes between 500% and 10,000,000% more time than the heuristic. The resulting deviations in the calculated total investment for the district heating from the results of the optimisation are in all cases below 5% and in 80% of cases below 0.3%. The efficiency of the heuristic is further demonstrated by the comparison with simpler heuristics like the Nearest-Neighbour-Heuristic. The latter is not only less efficient, it substantially overestimates the total costs by up to 80% in all cases with less than 100% heat coverage. Future work should focus on a more precise consideration of heat losses in the district heating network, as well as taking additional geological and topological conditions in the municipalities into account.
Suggested Citation
Weinand, Jann & Kleinebrahm, Max & McKenna, Russell & Mainzer, Kai & Fichtner, Wolf, 2019.
"Developing a three-stage heuristic to design geothermal-based district heating systems,"
Working Paper Series in Production and Energy
33, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
Handle:
RePEc:zbw:kitiip:33
DOI: 10.5445/IR/1000090290
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:kitiip:33. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://www.iip.kit.edu/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.