A Generalization of the Aumann-Shapley Value for Risk Capital Allocation Problems
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Leonard J. Mirman & Yair Tauman, 1982.
"Demand Compatible Equitable Cost Sharing Prices,"
Mathematics of Operations Research, INFORMS, vol. 7(1), pages 40-56, February.
- MIRMAN, Leonard J. & TAUMAN, Yair, 1982. "Demand compatible equitable cost sharing prices," LIDAM Reprints CORE 472, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Yves Sprumont, 2005. "On the Discrete Version of the Aumann-Shapley Cost-Sharing Method," Econometrica, Econometric Society, vol. 73(5), pages 1693-1712, September.
- Abraham Neyman & Rann Smorodinsky, 2004.
"Asymptotic Values of Vector Measure Games,"
Mathematics of Operations Research, INFORMS, vol. 29(4), pages 739-775, November.
- Abraham Neyman & Rann Smorodinsky, 2003. "Asymptotic Values of Vector Measure Games," Discussion Paper Series dp344, The Federmann Center for the Study of Rationality, the Hebrew University, Jerusalem.
- Neyman, Abraham, 2002. "Values of games with infinitely many players," Handbook of Game Theory with Economic Applications, in: R.J. Aumann & S. Hart (ed.), Handbook of Game Theory with Economic Applications, edition 1, volume 3, chapter 56, pages 2121-2167, Elsevier.
- Hervé Moulin, 1995.
"On Additive Methods To Share Joint Costs,"
The Japanese Economic Review, Japanese Economic Association, vol. 46(4), pages 303-332, December.
- Moulin, Herve, 1995. "On Additive Methods to Share Joint Costs," Mathematical Social Sciences, Elsevier, vol. 30(1), pages 98-99, August.
- Tsanakas, Andreas, 2009. "To split or not to split: Capital allocation with convex risk measures," Insurance: Mathematics and Economics, Elsevier, vol. 44(2), pages 268-277, April.
- Louis J. Billera & David C. Heath, 1982. "Allocation of Shared Costs: A Set of Axioms Yielding A Unique Procedure," Mathematics of Operations Research, INFORMS, vol. 7(1), pages 32-39, February.
- Acerbi, Carlo & Tasche, Dirk, 2002.
"On the coherence of expected shortfall,"
Journal of Banking & Finance, Elsevier, vol. 26(7), pages 1487-1503, July.
- Carlo Acerbi & Dirk Tasche, 2001. "On the coherence of Expected Shortfall," Papers cond-mat/0104295, arXiv.org, revised May 2002.
- Mertens, J F, 1988.
"The Shapley Value in the Non Differentiable Case,"
International Journal of Game Theory, Springer;Game Theory Society, vol. 17(1), pages 1-65.
- MERTENS, Jean-François, 1988. "The Shapley value in the non differentiable case," LIDAM Reprints CORE 781, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- van Gulick, Gerwald & De Waegenaere, Anja & Norde, Henk, 2012.
"Excess based allocation of risk capital,"
Insurance: Mathematics and Economics, Elsevier, vol. 50(1), pages 26-42.
- van Gulick, G. & De Waegenaere, A.M.B. & Norde, H.W., 2010. "Excess Based Allocation of Risk Capital," Discussion Paper 2010-123, Tilburg University, Center for Economic Research.
- Philippe Artzner & Freddy Delbaen & Jean‐Marc Eber & David Heath, 1999. "Coherent Measures of Risk," Mathematical Finance, Wiley Blackwell, vol. 9(3), pages 203-228, July.
- Jan Dhaene & Mark Goovaerts & Rob Kaas, 2003. "Economic Capital Allocation Derived from Risk Measures," North American Actuarial Journal, Taylor & Francis Journals, vol. 7(2), pages 44-56.
- Tsanakas, Andreas, 2004. "Dynamic capital allocation with distortion risk measures," Insurance: Mathematics and Economics, Elsevier, vol. 35(2), pages 223-243, October.
- MERTENS, Jean-François, 1980. "Values and derivatives," LIDAM Reprints CORE 435, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Tsanakas, Andreas & Barnett, Christopher, 2003. "Risk capital allocation and cooperative pricing of insurance liabilities," Insurance: Mathematics and Economics, Elsevier, vol. 33(2), pages 239-254, October.
- Michael Kalkbrener, 2005. "An Axiomatic Approach To Capital Allocation," Mathematical Finance, Wiley Blackwell, vol. 15(3), pages 425-437, July.
- Haimanko, Ori, 2001. "Cost sharing: the nondifferentiable case," Journal of Mathematical Economics, Elsevier, vol. 35(3), pages 445-462, June.
- Tasche, Dirk, 2002. "Expected shortfall and beyond," Journal of Banking & Finance, Elsevier, vol. 26(7), pages 1519-1533, July.
- Jean-François Mertens, 1980.
"Values and Derivatives,"
Mathematics of Operations Research, INFORMS, vol. 5(4), pages 523-552, November.
- MERTENS, Jean-François, 1980. "Values and derivatives," LIDAM Reprints CORE 435, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Jean-Pierre Aubin, 1981. "Cooperative Fuzzy Games," Mathematics of Operations Research, INFORMS, vol. 6(1), pages 1-13, February.
- Wang, Shaun S. & Young, Virginia R. & Panjer, Harry H., 1997. "Axiomatic characterization of insurance prices," Insurance: Mathematics and Economics, Elsevier, vol. 21(2), pages 173-183, November.
- Laeven, Roger J. A. & Goovaerts, Marc J., 2004. "An optimization approach to the dynamic allocation of economic capital," Insurance: Mathematics and Economics, Elsevier, vol. 35(2), pages 299-319, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Dóra Balog & Tamás László Bátyi & Péter Csóka & Miklós Pintér, 2014.
"Properties of risk capital allocation methods: Core Compatibility, Equal Treatment Property and Strong Monotonicity,"
CERS-IE WORKING PAPERS
1417, Institute of Economics, Centre for Economic and Regional Studies.
- Balog, Dóra & Bátyi, Tamás László & Csóka, Péter & Pintér, Miklós, 2014. "Properties of risk capital allocation methods: Core Compatibility, Equal Treatment Property and Strong Monotonicity," Corvinus Economics Working Papers (CEWP) 2014/13, Corvinus University of Budapest.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Boonen, Tim J. & De Waegenaere, Anja & Norde, Henk, 2020.
"A generalization of the Aumann–Shapley value for risk capital allocation problems,"
European Journal of Operational Research, Elsevier, vol. 282(1), pages 277-287.
- Boonen, T.J. & De Waegenaere, A.M.B. & Norde, H.W., 2012. "A Generalization of the Aumann-Shapley Value for Risk Capital Allocation Problems," Discussion Paper 2012-091, Tilburg University, Center for Economic Research.
- Boonen, Tim J., 2017. "Risk Redistribution Games With Dual Utilities," ASTIN Bulletin, Cambridge University Press, vol. 47(1), pages 303-329, January.
- Boonen, Tim J. & Tsanakas, Andreas & Wüthrich, Mario V., 2017. "Capital allocation for portfolios with non-linear risk aggregation," Insurance: Mathematics and Economics, Elsevier, vol. 72(C), pages 95-106.
- van Gulick, Gerwald & De Waegenaere, Anja & Norde, Henk, 2012.
"Excess based allocation of risk capital,"
Insurance: Mathematics and Economics, Elsevier, vol. 50(1), pages 26-42.
- van Gulick, G. & De Waegenaere, A.M.B. & Norde, H.W., 2010. "Excess Based Allocation of Risk Capital," Discussion Paper 2010-123, Tilburg University, Center for Economic Research.
- van Gulick, G. & De Waegenaere, A.M.B. & Norde, H.W., 2010. "Excess Based Allocation of Risk Capital," Other publications TiSEM f9231521-fea7-4524-8fea-8, Tilburg University, School of Economics and Management.
- Jilber Urbina & Miguel Santolino & Montserrat Guillen, 2021. "Covariance Principle for Capital Allocation: A Time-Varying Approach," Mathematics, MDPI, vol. 9(16), pages 1-13, August.
- Wang, Wei & Xu, Huifu & Ma, Tiejun, 2023. "Optimal scenario-dependent multivariate shortfall risk measure and its application in risk capital allocation," European Journal of Operational Research, Elsevier, vol. 306(1), pages 322-347.
- Gabriele Canna & Francesca Centrone & Emanuela Rosazza Gianin, 2021. "Capital Allocation Rules and the No-Undercut Property," Mathematics, MDPI, vol. 9(2), pages 1-13, January.
- Tsanakas, Andreas, 2009. "To split or not to split: Capital allocation with convex risk measures," Insurance: Mathematics and Economics, Elsevier, vol. 44(2), pages 268-277, April.
- Albrecht, Peter, 2003. "Risk measures," Papers 03-01, Sonderforschungsbreich 504.
- Dominique Guegan & Bertrand K Hassani, 2014.
"Distortion Risk Measures or the Transformation of Unimodal Distributions into Multimodal Functions,"
Documents de travail du Centre d'Economie de la Sorbonne
14008, Université Panthéon-Sorbonne (Paris 1), Centre d'Economie de la Sorbonne.
- Dominique Guegan & Bertrand Hassani, 2014. "Distortion Risk Measures or the Transformation of Unimodal Distributions into Multimodal Functions," Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers) halshs-00969242, HAL.
- Steven Kou & Xianhua Peng & Chris C. Heyde, 2013. "External Risk Measures and Basel Accords," Mathematics of Operations Research, INFORMS, vol. 38(3), pages 393-417, August.
- Silvana M. Pesenti & Sebastian Jaimungal & Yuri F. Saporito & Rodrigo S. Targino, 2023. "Risk Budgeting Allocation for Dynamic Risk Measures," Papers 2305.11319, arXiv.org, revised Oct 2024.
- Buch, A. & Dorfleitner, G., 2008. "Coherent risk measures, coherent capital allocations and the gradient allocation principle," Insurance: Mathematics and Economics, Elsevier, vol. 42(1), pages 235-242, February.
- Chen Chen & Garud Iyengar & Ciamac C. Moallemi, 2013. "An Axiomatic Approach to Systemic Risk," Management Science, INFORMS, vol. 59(6), pages 1373-1388, June.
- Jaume Belles-Sampera & Montserrat Guillen & Miguel Santolino, 2023. "Haircut Capital Allocation as the Solution of a Quadratic Optimisation Problem," Mathematics, MDPI, vol. 11(18), pages 1-17, September.
- Tsanakas, Andreas & Barnett, Christopher, 2003. "Risk capital allocation and cooperative pricing of insurance liabilities," Insurance: Mathematics and Economics, Elsevier, vol. 33(2), pages 239-254, October.
- Zang, Xin & Jiang, Fan & Xia, Chenxi & Yang, Jingping, 2024. "Random distortion risk measures," Insurance: Mathematics and Economics, Elsevier, vol. 116(C), pages 51-73.
- Kamil J. Mizgier & Joseph M. Pasia, 2016. "Multiobjective optimization of credit capital allocation in financial institutions," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 24(4), pages 801-817, December.
- Alexandru V. Asimit & Raluca Vernic & Riċardas Zitikis, 2013. "Evaluating Risk Measures and Capital Allocations Based on Multi-Losses Driven by a Heavy-Tailed Background Risk: The Multivariate Pareto-II Model," Risks, MDPI, vol. 1(1), pages 1-20, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tiu:tiutis:2c502ef8-76f0-47f5-ab45-1833b5f41103. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Richard Broekman (email available below). General contact details of provider: https://www.tilburguniversity.edu/about/schools/economics-and-management/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.