IDEAS home Printed from https://ideas.repec.org/p/sps/wpaper/834.html
   My bibliography  Save this paper

Complex production systems' performance measurement: Estimation of aggregate indices under uncertainty

Author

Listed:
  • Hovanov, Nikolai V.
  • Fedotov, Yuri V.

Abstract

The paper deals with approaches utilized for adjustment of well known Method of Aggregate Indices (MAI) to uncertainty conditions. The necessity for such adjustments occurs because of the shortage of numeric information. It appears at any stage of estimation of the aggregate quality index for operating electricity units when respective measure (index) integrates a system of object's parameters. Each parameter is required for ultimate quality appraisal, and taken together they are supposed to be sufficient for estimating quality level of the analyzed unit. The Baye's uncertainty randomization procedure is proposed as a tool to simulate the shortage of numeric information. Through this procedure separate indices, weight coefficients and aggregated indices are transformed into correspondent random magnitudes. Then, comparing the qualities of any two objects is converted in the problem of revealing a certain type of stochastic dominance between respective randomized aggregate indices. The software implementation of described above method of Randomized Aggregated Indices Method (RAIM) is based on discrete model of weight coefficients, which allows for generation of all their possible meanings by directed calibration of all feasible bundles of the coefficients. The software implementation of full calibration of possible values for the aggregate indices permits consideration of additional information supplied by experts. It is shaped as a system of inequalities for feasible values of the weight coefficients. Such nonnumeric information from experts substantially increases the accuracy and reliability of constructed randomized estimates of the objects' aggregate quality indices.

Suggested Citation

  • Hovanov, Nikolai V. & Fedotov, Yuri V., 2006. "Complex production systems' performance measurement: Estimation of aggregate indices under uncertainty," Working Papers 834, Graduate School of Management, St. Petersburg State University.
  • Handle: RePEc:sps:wpaper:834
    as

    Download full text from publisher

    File URL: https://dspace.spbu.ru/handle/11701/834
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sps:wpaper:834. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Lena Manaeva (email available below). General contact details of provider: https://edirc.repec.org/data/sompuru.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.