IDEAS home Printed from https://ideas.repec.org/p/pra/mprapa/112055.html
   My bibliography  Save this paper

Risk Management Practice Adopted in Road Construction Project

Author

Listed:
  • Gain, Hemant

Abstract

Purpose: Zero risk construction is only a dream not reality as there is nothing certainity in the real world and scientists are only capable of coverting the same into risk with high level data science. The practice of risk management is an attempt to highlight risk elements with a case of urban road construction in Sindhupalchowk district, Province 3, Nepal. Design/Methodology/Approach: The 5-point Likert scale questionnaire survey was done to collect the primary data. Risk Management Practice is documented based on survey response in percentage through charts and graphs. Field visit were done for visual assessment of the construction procedure along with key informant interview and Secondary data of Detail Project Reports, Design and Drawings were effectively analyzed. Cronbach’s alpha was used to measure the reliability and triangulations were done for validity. Findings/Result: The results from this research indicates that contractor’s organization are averagely aware with a mean score of 3.30 about Risk Management Practice and averagely practicing risk management formally with mean score of 2.83. They are averagely analyzing risk management techniques with mean score of 3.07. Mean score is slightly higher based on client’s perspective with score for awareness being 3.93 and score for risk management being practiced formally is 3.13. Risk analysis score based on client’s management is 3.40. Mostly adopted technique of risk identification is monitoring and evaluation report of similar past projects and direct judgment is widely used technique for risk assessment of road construction projects at Sindhupalchowk district based on both client’s and contractor’s perspective. Risk response strategy based on contractor’s perspective is monitoring the risk and preparing contingency plan whereas that for client is transfer of risk. Originality/Value: It is action research which is significant for professionals to understand the practices of risk management being adopted by Nepalese Contractors in hilly region of Nepal.

Suggested Citation

  • Gain, Hemant, 2022. "Risk Management Practice Adopted in Road Construction Project," MPRA Paper 112055, University Library of Munich, Germany.
  • Handle: RePEc:pra:mprapa:112055
    as

    Download full text from publisher

    File URL: https://mpra.ub.uni-muenchen.de/112055/1/MPRA_paper_112055.pdf
    File Function: original version
    Download Restriction: no

    File URL: https://mpra.ub.uni-muenchen.de/112055/2/MPRA_paper_112055.pdf
    File Function: original version
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    Risk; Practice; Identification; Assessment; Response;
    All these keywords.

    JEL classification:

    • I31 - Health, Education, and Welfare - - Welfare, Well-Being, and Poverty - - - General Welfare, Well-Being

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pra:mprapa:112055. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joachim Winter (email available below). General contact details of provider: https://edirc.repec.org/data/vfmunde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.