IDEAS home Printed from https://ideas.repec.org/p/hal/journl/halshs-00754415.html
   My bibliography  Save this paper

Tips and Pitfalls in PPP design

Author

Listed:
  • Emile Quinet

    (PSE - Paris-Jourdan Sciences Economiques - ENS-PSL - École normale supérieure - Paris - PSL - Université Paris Sciences et Lettres - INRA - Institut National de la Recherche Agronomique - EHESS - École des hautes études en sciences sociales - ENPC - École des Ponts ParisTech - CNRS - Centre National de la Recherche Scientifique, PSE - Paris School of Economics - UP1 - Université Paris 1 Panthéon-Sorbonne - ENS-PSL - École normale supérieure - Paris - PSL - Université Paris Sciences et Lettres - EHESS - École des hautes études en sciences sociales - ENPC - École des Ponts ParisTech - CNRS - Centre National de la Recherche Scientifique - INRAE - Institut National de Recherche pour l’Agriculture, l’Alimentation et l’Environnement)

  • David Meunier

    (LVMT - Laboratoire Ville, Mobilité, Transport - IFSTTAR - Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux - UPEM - Université Paris-Est Marne-la-Vallée - ENPC - École des Ponts ParisTech, INRETS - Institut National de Recherche sur les Transports et leur Sécurité)

Abstract

The Public-Private-Partnership (PPP) procedure is a very appealing model, but as it becomes more and more used in practice, problems and failures have been observed in the management of many projects. Many of these unfortunate experiences are consequences of errors in the implementation of the procedure, but in other cases, clear errors of conception were the cause. Indeed, there are many ways to structure a PPP and PPP is not the only way to manage an infrastructure scheme. It is thus an important task to provide guidelines on whether to use PPP or other types of procurement and, in case a PPP is preferred, on how to design it. The aim of this chapter is to contribute to this task, trying to combine theoretical knowledge and practical experience. After a review of the variety of economic characteristics of transport infrastructure and their procurement conditions, we recall the reasons that may justify this association of public and private management which is the characteristic of PPP, outlining the limits of using pure private or pure public procurement. Then an analytic process is proposed, screening the parameters which matter most for choosing the PPP procedure among many possible ones, depending on the specificities of the various transport modes. This process gives also indications on key elements for implementing a PPP. Finally, the analytic process proposed is used for a generic analysis of, respectively, the motorways and port sectors, so as to test its practicability and customizing capability for the use of public authorities.

Suggested Citation

  • Emile Quinet & David Meunier, 2010. "Tips and Pitfalls in PPP design," Post-Print halshs-00754415, HAL.
  • Handle: RePEc:hal:journl:halshs-00754415
    DOI: 10.1016/j.retrec.2010.10.013
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Juli�n Sierra Tamayo & Jose Manuel Vassallo & María de los Ángeles Baeza, 2014. "Unbundling tolls from contracts: a new road PPP model," Public Money & Management, Taylor & Francis Journals, vol. 34(6), pages 447-451, November.
    2. Páez-Pérez, David & Sánchez-Silva, Mauricio, 2016. "A dynamic principal-agent framework for modeling the performance of infrastructure," European Journal of Operational Research, Elsevier, vol. 254(2), pages 576-594.
    3. Ahmadabadi, Ali Akbari & Heravi, Gholamreza, 2019. "The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran," Transport Policy, Elsevier, vol. 73(C), pages 152-161.
    4. Qiang Wang & Thomas Dogot & Yueling Yang & Jian Jiao & Boyang Shi & Changbin Yin, 2020. "From “Coal to Gas” to “Coal to Biomass”: The Strategic Choice of Social Capital in China," Energies, MDPI, vol. 13(16), pages 1-22, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:halshs-00754415. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.