Author
Listed:
- Muhammad Khakim Habibi
(ESC [Rennes] - ESC Rennes School of Business)
- Ramzi Hammami
(ESC [Rennes] - ESC Rennes School of Business)
- Olga Battaia
(Kedge BS - Kedge Business School)
- Alexandre Dolgui
(IMT Atlantique - DAPI - Département Automatique, Productique et Informatique - IMT Atlantique - IMT Atlantique - IMT - Institut Mines-Télécom [Paris], LS2N - équipe MODELIS - Modélisation, Optimisation et DEcision pour la Logistique, l'Industrie et les Services - LS2N - Laboratoire des Sciences du Numérique de Nantes - Inria - Institut National de Recherche en Informatique et en Automatique - CNRS - Centre National de la Recherche Scientifique - IMT Atlantique - IMT Atlantique - IMT - Institut Mines-Télécom [Paris] - Nantes Univ - ECN - NANTES UNIVERSITÉ - École Centrale de Nantes - Nantes Univ - Nantes Université - Nantes univ - UFR ST - Nantes université - UFR des Sciences et des Techniques - Nantes Université - pôle Sciences et technologie - Nantes Univ - Nantes Université)
Abstract
In a context of Closed-Loop Supply Chain, Production-Routing Problem with Pickup and Delivery is presented. In its basic form, Production-Routing Problem (PRP) attempts to solve jointly Dynamical Lot-Sizing and Inventory-Routing Problems. In this paper, a novel PRP model seeking to minimize the total cost of manufacturing, remanufacturing, disassembly, inventory, and routing by taking into account the remanufacturing and disassembly processes of End-of-Life returned products is provided. Novel hybrid heuristics based on Two-Phase Iterative and Relax-and-Fix heuristics were developed and outperform Branch-and-Cut algorithm for large size instances with a small vehicle capacity. Main insights derived from sensitivity analyses are (i) managers can use the model to trade off the cost saving resulting from the integration of forward and reverse flows, on the one hand, and any additional cost incurred by the organizational changes related to the integration, on the other hand, (ii) a high level of remanufacturing rate for returned products is not necessarily profitable, and managers should develop a return policy that leads to the appropriate level of remanufacturing rate, and (iii) investing in expanding the remanufacturing or the disassembly capacities can significantly reduce the total cost until a threshold level, beyond which any further investment is not beneficial.
Suggested Citation
Muhammad Khakim Habibi & Ramzi Hammami & Olga Battaia & Alexandre Dolgui, 2024.
"Simultaneous Pickup-and-Delivery Production-Routing Problem in closed-loop supply chain with remanufacturing and disassembly consideration,"
Post-Print
hal-04611910, HAL.
Handle:
RePEc:hal:journl:hal-04611910
DOI: 10.1016/j.ijpe.2024.109290
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
search for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-04611910. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.