Author
Listed:
- Rodica Loisel
(LEMNA - Laboratoire d'économie et de management de Nantes Atlantique - IEMN-IAE Nantes - Institut d'Économie et de Management de Nantes - Institut d'Administration des Entreprises - Nantes - UN - Université de Nantes)
- Lionel Lemiale
(LEMNA - Laboratoire d'économie et de management de Nantes Atlantique - IEMN-IAE Nantes - Institut d'Économie et de Management de Nantes - Institut d'Administration des Entreprises - Nantes - UN - Université de Nantes)
- Silvana Mima
(GAEL - Laboratoire d'Economie Appliquée de Grenoble - CNRS - Centre National de la Recherche Scientifique - INRAE - Institut National de Recherche pour l’Agriculture, l’Alimentation et l’Environnement - UGA - Université Grenoble Alpes - Grenoble INP - Institut polytechnique de Grenoble - Grenoble Institute of Technology - UGA - Université Grenoble Alpes)
- Adrien Bidaud
(LPSC - Laboratoire de Physique Subatomique et de Cosmologie - IN2P3 - Institut National de Physique Nucléaire et de Physique des Particules du CNRS - CNRS - Centre National de la Recherche Scientifique - UGA - Université Grenoble Alpes - Grenoble INP - Institut polytechnique de Grenoble - Grenoble Institute of Technology - UGA - Université Grenoble Alpes)
Abstract
How scenarios account for short-term nuclear power flexibility? Usual communication limited to Power and Energy or Capacity Factors. Need of details on cycling, speed, rated Pmin. First remark is that generally scenarios do not communicate on the way nuclear reactors adapt to vRES; they just show the installed capacities and CF (or the power generated). We find relevant indicator of the nuclear flexibility such as the number of cycles performed by NPP, their type and the speed of ramping, and the min rated power as well. We show that if reactors run faster, they better integrate RES, they substitute for gas and reduce system cost and power prices. But for the nuclear operator, this could come with a loss while evicting gas power form the market. A non-obvious result of particular interest is for the min rated power, as we obtain little sensitivity on the system by constraining the reactor to run down to 20% of the nominal power. This is because in 2050 (the year of simulation) we'll have a small capacity of nuclear (25% compared to 75% currently). Similar to the point 2, Baseload is more benefical to the private investor, as it makes increases the power price. A larger share of the fleet that is flexible makes prices decrease, thus income will decrease. Final contribution is on the debate, how to diversify the energy mix and reduce the nuclear share, by phasing out reactors or by reducing the power generated with the existing reactors? We find that it makes more sense to reason in flows, as we still need a large capacity in 2050, in particular over seasons with low solar power, like winter and nights. Besides, this would limit the economic and social cost in terms of employment, regional dependency of industrial sites, and geographical power mix equilibria.
Suggested Citation
Rodica Loisel & Lionel Lemiale & Silvana Mima & Adrien Bidaud, 2021.
"Strategies for short-term intermittency in long-term scenarios in the French power system,"
Post-Print
hal-03268617, HAL.
Handle:
RePEc:hal:journl:hal-03268617
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
search for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-03268617. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.