Technical Memorandum on Innovative Contracting Methods Implementation Studies

Author

Listed:
  • Choi, Kunhee
  • Lee, Eul-Bum

Abstract

The main objective of this study is to determine the effectiveness of alternative contracting strategies on aspects of project performance such as schedule and cost, in order to promote ways to apply the strategies effectively. A quantitative analysis that draws on 1,372 infrastructure improvement projects recently completed in California from 2000 to 2008 was conducted to achieve the objective. According to the analysis, alternative projects contracted with I/D and A+B represented 7% of all project establishments and 23% of all project allotment costs. The results of one way ANOVA analyses show that I/D projects held a decisive schedule-saving advantage over A+B and conventional projects, but that I/D also increased project costs significantly more than the others because of a higher frequency of contract change orders. The results of statistical analyses reveal a severe effectiveness problem with use of the A+B contracting strategy. When compared with conventional projects, A+B not only included extreme severe schedule overruns, but it also increased project costs far above the levels seen in conventional projects; both of these resulted from inaccuracies created by allowing contractors to bid on contract time. According to the analysis, the additional cost growth for utilizing I/D was recouped by reduced construction time, but this tradeoff was not seen in A+B projects.

Suggested Citation

  • Choi, Kunhee & Lee, Eul-Bum, 2008. "Technical Memorandum on Innovative Contracting Methods Implementation Studies," Institute of Transportation Studies, Working Paper Series qt77x6j8nc, Institute of Transportation Studies, UC Davis.
  • Handle: RePEc:cdl:itsdav:qt77x6j8nc
    as

    Download full text from publisher

    File URL: https://www.escholarship.org/uc/item/77x6j8nc.pdf;origin=repeccitec
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    Engineering;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cdl:itsdav:qt77x6j8nc. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Lisa Schiff (email available below). General contact details of provider: https://edirc.repec.org/data/itucdus.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.