Abstract
Optimal timing and investment strategies are critical in markets when project demand is uncertain. When developer has more than one project located in close proximity to each other, interactive effects will have significant effects on the optimal timing decision. If positive interactive effects can be created by integrating the two projects, the values of the two projects could be collectively enhanced when they are developed jointly by the developer. Similarly, if the projects are developed by two competing developers, development strategy may be adopted such that the completion of one project may create negative externality on the neighboring project owned by another developer. This paper aims to develop a deterministic model to examine multiproject interactive effects on developer's investment and development strategies. The model will also evaluate how investment strategies change under different market situation and for different project type, either homogeneous or heterogeneous. Under the constant demand and cost functions, portfolio effects of multiple projects are examined. The portfolio effects, in this context, refer to the spill-over benefits generated by second projects when two projects located in close proximity enjoy positive externality. The spill-over effects may include higher revenue or lower cost for the second development projects vis-‡-vis the case when the two projects are developed as if they are independent or by two independent developers. This paper sets a basic optimal development timing model with only one developer, who will develop two homogenous projects. We further extend the model to incorporate heterogeneous projects. We find that the developer will abort the project when the demand is weak, and he will choose to develop single project when the demand curve is steep. In a market with flat demand curve, it will be more optimal economically for the developer to develop the two projects simultaneously. The positive portfolio effects shorten the time to wait to develop for the two projects, and the developer will prefer to undertake the two projects simultaneously.
Suggested Citation
Yingying Huang & Tien Foo Sing & Seow Eng Ong, 2005.
"Multi-Projects Interactive Effects and Investment Strategy,"
ERES
eres2005_199, European Real Estate Society (ERES).
Handle:
RePEc:arz:wpaper:eres2005_199
Download full text from publisher
More about this item
JEL classification:
- R3 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Real Estate Markets, Spatial Production Analysis, and Firm Location
Statistics
Access and download statistics
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arz:wpaper:eres2005_199. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Architexturez Imprints (email available below). General contact details of provider: https://edirc.repec.org/data/eressea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.