Analysis of the impact of responsiveness on the capital cost of a make-to-order multiproduct batch plant

Author

Listed:
  • VAN MEIR, Amy
  • CORNELISSENS, Trijntje
  • SPRINGAEL, Johan

Abstract

Most academic models for strategic design of batch production plants focus on minimising capital and operational costs. However nowadays, responsiveness is an important key performance attribute in operations management. The main metric for responsiveness is the delivery lead time (DLT), being defined as the time between ordering and delivering of a customer order, also called the order fulfillment cycle time. In the context of plant design, we consider delivering as loading at the plant, assuming the customer or 3PL to be responsible for transport. In this paper, we aim to incorporate responsiveness in the design of a batch plant operating in a make-to-order (MTO) environment, by introducing a target DLT for the customer orders to be fulfilled over the strategic horizon. Additionally, as common for an MTO plant, non-dedicated storage tanks are installed, avoiding obstruction of production equipment while these customer orders wait for quality control and loading. Unlike most design models, the capital cost of these storage tanks is included in the objective function of our design model. Moreover, to design a MTO plant accounting for a target DLT for all individual orders, scheduling techniques are introduced, both in the mathematical model as in the heuristic needed to solve larger instances. The effect of the target DLT on the batch plant design is examined for multiple problem instances with different planning horizons, number of orders and total amount to be produced. As expected, the design cost increases non linearly with a decreasing target DLT. To quantify the exact impact of a lower DLT, the cost of responsiveness is expressed as a percentage of the minimum capital cost found if no DLT’s are specified. For our problems instances, it can be concluded that decreasing the DLT with 24 hours (1 day) incurs a capital cost increase between 0.82 % and 36.85 %.

Suggested Citation

  • VAN MEIR, Amy & CORNELISSENS, Trijntje & SPRINGAEL, Johan, 2022. "Analysis of the impact of responsiveness on the capital cost of a make-to-order multiproduct batch plant," Working Papers 2022006, University of Antwerp, Faculty of Business and Economics.
  • Handle: RePEc:ant:wpaper:2022006
    as

    Download full text from publisher

    File URL: https://repository.uantwerpen.be/docman/irua/f4ed78/rps_2022_006.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Verbiest, Floor & Cornelissens, Trijntje & Springael, Johan, 2019. "A matheuristic approach for the design of multiproduct batch plants with parallel production lines," European Journal of Operational Research, Elsevier, vol. 273(3), pages 933-947.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.

      Corrections

      All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ant:wpaper:2022006. See general information about how to correct material in RePEc.

      If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

      If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

      If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

      For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joeri Nys (email available below). General contact details of provider: https://edirc.repec.org/data/ftufsbe.html .

      Please note that corrections may take a couple of weeks to filter through the various RePEc services.

      IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.