IDEAS home Printed from https://ideas.repec.org/p/ant/wpaper/2003006.html
   My bibliography  Save this paper

The impact of lot splitting on lead times in a deterministic production line

Author

Listed:
  • VAN NIEUWENHUYSE, Inneke
  • VANDAELE, Nico

Abstract

It is generally known that the mechanism of overlapping operations allows to reduce the average job lead times in a production system. However, a machine may remain idle between two consecutive sublots belonging to the same job, due to a difference between its own setup and processing times and those of the preceding machine. These idle times are referred to as “gaps”. Until now, little formal results are available to calculate these “gaps” in terms of the system parameters and the transfer batch sizes used. In this paper, we derive expressions for these gaps and the transfer batch lead times in a single-product production line with deterministic arrivals, setup and processing times. We prove that in our setting, the average transfer batch lead time is minimized when the transfer batch size equals one product unit.

Suggested Citation

  • VAN NIEUWENHUYSE, Inneke & VANDAELE, Nico, "undated". "The impact of lot splitting on lead times in a deterministic production line," Working Papers 2003006, University of Antwerp, Faculty of Business and Economics.
  • Handle: RePEc:ant:wpaper:2003006
    as

    Download full text from publisher

    File URL: https://repository.uantwerpen.be/docman/irua/983878/26f9a891.pdf
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ant:wpaper:2003006. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joeri Nys (email available below). General contact details of provider: https://edirc.repec.org/data/ftufsbe.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.