Optimization of Inventory Management Logistic Model of the Machine-Building Enterprises
Author
Abstract
Suggested Citation
DOI: 10.22440/EconWorld.WP.2017.001
Download full text from publisher
References listed on IDEAS
- Pentico, David W. & Drake, Matthew J., 2011. "A survey of deterministic models for the EOQ and EPQ with partial backordering," European Journal of Operational Research, Elsevier, vol. 214(2), pages 179-198, October.
- Eynan, Amit & Kropp, Dean H., 2007. "Effective and simple EOQ-like solutions for stochastic demand periodic review systems," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1135-1143, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Taleizadeh, Ata Allah & Pentico, David W. & Saeed Jabalameli, Mohammad & Aryanezhad, Mirbahador, 2013. "An EOQ model with partial delayed payment and partial backordering," Omega, Elsevier, vol. 41(2), pages 354-368.
- Taleizadeh, Ata Allah & Pentico, David W. & Aryanezhad, Mirbahador & Ghoreyshi, Seyed Mohammad, 2012. "An economic order quantity model with partial backordering and a special sale price," European Journal of Operational Research, Elsevier, vol. 221(3), pages 571-583.
- Zhang, Ren-Qian, 2012. "An extension of partial backordering EOQ with correlated demand caused by cross-selling considering multiple minor items," European Journal of Operational Research, Elsevier, vol. 220(3), pages 876-881.
- Wang Luqi & Chen Zhijian & Chen Mingyao & Zhang Ruijie, 2019. "Inventory Policy for a Deteriorating Item with Time-Varying Demand Under Trade Credit and Inflation," Journal of Systems Science and Information, De Gruyter, vol. 7(2), pages 115-133, April.
- Sweety Gupta & Vinod Kumar Mishra, 2024. "Multi-item stochastic inventory model for deteriorating items with power demand pattern under partial backlogging and joint replenishment," Annals of Operations Research, Springer, vol. 341(2), pages 963-991, October.
- Zhou Yongwu & Lin Zhaozhan, 2016. "Impacts of Hyperbolic Discounting on Inventory Replenishment Policy Under Inflation," Journal of Systems Science and Information, De Gruyter, vol. 4(1), pages 24-39, February.
- Hossein Salehi & Ata Allah Taleizadeh & Reza Tavakkoli-Moghaddam, 2016. "An EOQ model with random disruption and partial backordering," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2600-2609, May.
- Tianming Gao & Vasilii Erokhin & Aleksandr Arskiy, 2019. "Dynamic Optimization of Fuel and Logistics Costs as a Tool in Pursuing Economic Sustainability of a Farm," Sustainability, MDPI, vol. 11(19), pages 1-16, October.
- Irfan Ali & Srikant Gupta & Aquil Ahmed, 2019. "Multi-objective linear fractional inventory problem under intuitionistic fuzzy environment," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(2), pages 173-189, April.
- Sadeghi, Javad & Mousavi, Seyed Mohsen & Niaki, Seyed Taghi Akhavan & Sadeghi, Saeid, 2014. "Optimizing a bi-objective inventory model of a three-echelon supply chain using a tuned hybrid bat algorithm," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 70(C), pages 274-292.
- K. Skouri, 2018. "An EOQ model with backlog-dependent demand," Operational Research, Springer, vol. 18(2), pages 561-574, July.
- Taleizadeh, Ata Allah & Tafakkori, Keivan & Thaichon, Park, 2021. "Resilience toward supply disruptions: A stochastic inventory control model with partial backordering under the base stock policy," Journal of Retailing and Consumer Services, Elsevier, vol. 58(C).
- Castellano, Davide & Glock, Christoph H., 2024. "Economic production quantity for a decaying item with stochastic demand and positive lead time," International Journal of Production Economics, Elsevier, vol. 267(C).
- Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "Joint-replenishment problem under stochastic demands with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1108-1120, August.
- Silver, Edward A. & Robb, David J., 2008. "Some insights regarding the optimal reorder period in periodic review inventory systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 354-366, March.
- Stojkovska, Irena, 2013. "On the optimality of the optimal policies for the deterministic EPQ with partial backordering," Omega, Elsevier, vol. 41(5), pages 919-923.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Mamta Gupta & Sunil Tiwari & Chandra K. Jaggi, 2020. "Retailer’s ordering policies for time-varying deteriorating items with partial backlogging and permissible delay in payments in a two-warehouse environment," Annals of Operations Research, Springer, vol. 295(1), pages 139-161, December.
- Young Hyeon Yang & Jong Soo Kim, 2020. "An adaptive joint replenishment policy for items with non-stationary demands," Operational Research, Springer, vol. 20(3), pages 1665-1684, September.
- Dey, Oshmita & Chakraborty, Debjani, 2009. "Fuzzy periodic review system with fuzzy random variable demand," European Journal of Operational Research, Elsevier, vol. 198(1), pages 113-120, October.
More about this item
Keywords
Logistic model; asymptotic methods; small parameter; asymptotic expansions;All these keywords.
JEL classification:
- C59 - Mathematical and Quantitative Methods - - Econometric Modeling - - - Other
- M11 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Production Management
- M20 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Economics - - - General
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ana:wpaper:17001. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Unal Tongur (email available below). General contact details of provider: https://edirc.repec.org/data/ewanatr.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.