IDEAS home Printed from https://ideas.repec.org/h/wsi/wschap/9789811224782_0004.html
   My bibliography  Save this book chapter

Early Contractor Involvement in Project Delivery — Drivers and Impediments

In: Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting

Author

Listed:
  • Ghada M. Gad
  • Edward Minchin

Abstract

Owners and contractors have long encountered a deep disconnect at design hand-off, when the project structure proves to be unbuildable as set out in the plans. This gulf between the owner and the contractor is especially common in traditional project delivery methods. Indeed, contractors are constantly heard saying, I would have completed the job for half the price in less time if I had been able to provide earlier input into the design. Owners who have been able to involve contractors early attest to the added value accrued from their construction knowledge and experience and designers developing project plans in silos simply cannot replicate this invaluable contractor insight. Although the industry has long faced this issue, owners still have trouble getting contractor input earlier in the process, given existing legal and/or cultural constraints. However, some owners have successfully operated within these constraints to capture the added value of a contractor’s input in their designs. Early contractor input increases innovation, makes project plans more constructable, and expedites the entire process. This chapter examines the drivers of early contractor involvement in the light of the many factors impeding it. The authors review and describe the effective methods used by owners to allow contractor design input at various project stages (from planning to construction) and under different project delivery methods. These successful owners have used the standard Contractor’s Q&A method during bidding and the Value Engineering Services method as well as more innovative ones such as Alternative Technical Concepts (ATCs) and online input solicitation platforms. A case study also demonstrates one owner’s successful use of a method that solicits pre-bid contractor input during contract document development to enhance the project’s constructability.

Suggested Citation

  • Ghada M. Gad & Edward Minchin, 2023. "Early Contractor Involvement in Project Delivery — Drivers and Impediments," World Scientific Book Chapters, in: Giovanni C Migliaccio & Pramen P Shrestha (ed.), Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting, chapter 4, pages 65-87, World Scientific Publishing Co. Pte. Ltd..
  • Handle: RePEc:wsi:wschap:9789811224782_0004
    as

    Download full text from publisher

    File URL: https://www.worldscientific.com/doi/pdf/10.1142/9789811224782_0004
    Download Restriction: Ebook Access is available upon purchase.

    File URL: https://www.worldscientific.com/doi/abs/10.1142/9789811224782_0004
    Download Restriction: Ebook Access is available upon purchase.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    More about this item

    Keywords

    Construction; Engineering; Project Delivery; Procurement; Contracting;
    All these keywords.

    JEL classification:

    • L74 - Industrial Organization - - Industry Studies: Primary Products and Construction - - - Construction
    • O2 - Economic Development, Innovation, Technological Change, and Growth - - Development Planning and Policy

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:wschap:9789811224782_0004. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscientific.com/page/worldscibooks .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.