IDEAS home Printed from https://ideas.repec.org/h/spr/sprchp/978-981-16-3587-8_87.html
   My bibliography  Save this book chapter

Impact of COVID-19 on the China-Australia Construction Supply Chain

In: Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Chigozie Victor Ndukwe

    (University of Melbourne)

  • Jinyun Liu

    (Topgan Construction Pty Ltd)

  • Toong Khuan Chan

    (University of Melbourne)

Abstract

The Australian construction industry has historically imported building materials from Europe, US and Japan but more recently seen dramatic increases in imports from Asia. The construction industry is heavily reliant on imports of building materials such as steel, windows, joinery, tiles, float glass and curtain walls from its top trading partner, China. The supply of these building materials was disrupted amid the confusion in response to the initial spread of the COVID virus in China leading to widespread lockdowns and the temporary closure of manufacturing plants. By March 2020, the virus has spread by infected international travelers across the globe bringing numerous cases into Australia. This study aims to examine the impact of COVID on the supply of building materials from China to Australia specifically focusing on the state of Victoria. The objectives of this study are to map out the risks that have crystalised on the China-Australia construction supply chain; examine the impact of upstream disruption in China on downstream activities; and assess how the timing of local pandemic outbreak impacts supply chain performance. Using procurement data from a residential builder, we observed disruption of production, delay, increase of shipping costs and loss from foreign exchange. The delay was up to two weeks due to the shutdown of manufacturing plants in China during the early stages of the pandemic. When the first wave of infections spread into Australia, its impact on the building and construction industry was minimal. The greater impact occurred when limits were placed on site workers during second wave of infections which desynchronised the Australian and Chinese sides of the supply chain. The builder experienced additional two-weeks delay on small scale residential projects and four-weeks delay on a large-scale residential project. These findings may assist the industry to find ways to manage future risk of disruptions to their supply chains.

Suggested Citation

  • Chigozie Victor Ndukwe & Jinyun Liu & Toong Khuan Chan, 2021. "Impact of COVID-19 on the China-Australia Construction Supply Chain," Springer Books, in: Xinhai Lu & Zuo Zhang & Weisheng Lu & Yi Peng (ed.), Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate, pages 1275-1291, Springer.
  • Handle: RePEc:spr:sprchp:978-981-16-3587-8_87
    DOI: 10.1007/978-981-16-3587-8_87
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-16-3587-8_87. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.